C18 Fire Pump Industrial Engine Caterpillar


Electronic Control Module - Remove and Install

Usage:

C18 NBB

Removal Procedure

  1. Disconnect the negative battery terminal at the battery.



    Illustration 1g01694693

  1. Loosen allen head screws (1). Disconnect the harness assemblies from electronic control module (2) .



    Illustration 2g01694714

  1. Remove bolts (3) .

  1. Remove electronic control module (2) and remove the isolation mounts.

  1. Remove supports (4) and remove the inboard electronic control module.

Installation Procedure




    Illustration 3g01694714

  1. Position isolation mounts on the inboard electronic control module.

  1. Position the inboard electronic control module and install supports (4) .

  1. Position the isolation mounts on electronic control module (2) and install the electronic control module.

  1. Install bolts (3) .



    Illustration 4g01694693

  1. Connect the harness assemblies to electronic control module (2). Tighten bolts (1) to a torque of 6 ± 1 N·m (53 ± 9 lb in). Repeat this step for the inboard electronic control module.

  1. Connect the negative battery terminal at the battery.

Caterpillar Information System:

Winding Insulation Maintenance and Cleaning and Drying of the Generators {4450} Winding Insulation Maintenance and Cleaning and Drying of the Generators {4450}
2008/12/15 A New Pressure Gauge Is Now Used. {7456}
2008/10/27 A New Heat Shield for the Exhaust Manifold is Available {1067}
C6.6 Marine Generator Set Engine Design
C18 Fire Pump Industrial Engine Turbocharger Outlet Pressure Sensor - Remove and Install
3512B SR4B Generator Sets Radiator - Clean
C18 Fire Pump Industrial Engine Inlet Air Temperature Sensor - Remove and Install
PM3516 Power Modules Refill Capacities and Recommendations
2009/01/26 Improved Fuel Injection Pump Timing Tool {1251}
C18 Fire Pump Industrial Engine Valve Mechanism Cover - Remove and Install
C18 Fire Pump Industrial Engine Housing (Front) - Install
C18 Fire Pump Industrial Engine Housing (Front) - Remove
G3516 Petroleum Engines Fuel Control Actuator - Remove and Install
C18 Fire Pump Industrial Engine Alternator - Remove and Install
C18 Fire Pump Industrial Engine Air Cleaner - Remove and Install
C18 Fire Pump Industrial Engine Expansion Tank - Remove and Install
C18 Fire Pump Industrial Engine Heat Exchanger - Remove
G3500B Engines Electrical Connectors
3612 and 3616 Engines Air Shutoff
C18 Fire Pump Industrial Engine Heat Exchanger - Install
C175 Generator Sets Fuel System - Prime
2009/02/16 New Software and a New Rotary Switch Improve the Reliability of the Engine Speed Dial on Excavators {1408, 7332, 7610, 7620}
TH48-E70 Petroleum Transmission and TH48-E70-C27I, TH48-E70-C32I and TH48-E70-C32P Petroleum Power Train Packages Speed Sensor (Transmission) - Engine Output
C18 Fire Pump Industrial Engine Heat Exchanger - Disassemble
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.