Valve Actuator (Variable) - Install
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 6E-5047 | Plug | 1 |
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Perform the following flush procedure prior to installing the variable valve actuator.
- Remove the valve from the oil rail for the variable valve actuator.
- Install Tooling (A) in the opening.
- Disconnect the harness assemblies for the electronic unit injectors.
- Crank the engine for at least 5 seconds in order to flush the oil rail for the variable valve actuator.
- Reinstall the valve in the oil rail for the variable valve actuator. Connect the harness assemblies for the electronic unit injectors.
Show/hide tableIllustration 1 g01010697 - Install variable valve actuator (2).
- Install nuts (3) that secure variable valve actuator (2) to the cylinder head.
- Adjust the lash for the variable valve actuators to
0.50 ± 0.08 mm (0.020 ± 0.003 inch) . Refer to Testing and Adjusting, "Variable Valve Actuators - Inspect/Adjust" for more information on adjusting the variable valve actuators. - Connect harness assemblies (1) for variable valve actuator (2).
End By:
- Install the valve mechanism cover. Refer to the Disassembly and Assembly Manual, "Valve Mechanism Cover - Remove and Install".
Caterpillar Information System:
C15 On-highway Engine Valve Actuator (Variable) - Remove
C15 On-highway Engine Compression Brake - Install
C15 On-highway Engine Compression Brake - Remove
C15 On-highway Engine Compression Brake - Disassemble
C15 On-highway Engine Compression Brake - Assemble
C15 and C18 Petroleum Generator Sets Automatic Start/Stop - Inspect
C15 On-highway Engine Engine Control Module - Remove and Install
C13 Engine Turbocharger - Install - High Pressure Turbocharger
C13 Engine Turbocharger - Remove - High Pressure Turbocharger
C27 PET GEN SET Electric Power Generation and C27 KNOCKDOWN K Petroleum Power Train Package Generator Start-up Checklist
C15 On-highway Engine Diverter Valve (Coolant) - Disassemble
C15 On-highway Engine Diverter Valve (Coolant) - Assemble
Installation of the ADEM 3 Control System on G3606 and G3608 Engines{1901, 7620} Installation of the ADEM 3 Control System on G3606 and G3608 Engines{1901, 7620}
Installation of the ADEM 3 Control System on G3612 and G3616 Engines{1901, 7620} Installation of the ADEM 3 Control System on G3612 and G3616 Engines{1901, 7620}
C15 On-highway Engine Valve Mechanism Cover - Remove and Install
2003/09/01 The Oil Pan Gasket now Requires a Gasket Sealant to be Used {1302, 7555}
C11 and C13 Engines Engine Oil Filter Base - Remove
C11 and C13 Engines Engine Oil Filter Base - Install
C11 and C13 Engines for Caterpillar Built Machines Engine Oil Filter Base - Disassemble
C11 and C13 Engines for Caterpillar Built Machines Engine Oil Filter Base - Assemble
C11 and C13 Engines for Caterpillar Built Machines Engine Oil Pump - Remove
C11 and C13 Engines for Caterpillar Built Machines Engine Oil Pump - Install
C11 and C13 Engines for Caterpillar Built Machines Engine Oil Pump - Disassemble
C11 and C13 Engines for Caterpillar Built Machines Engine Oil Pump - Assemble