C18 Marine Engines Caterpillar


Gear Group (Front) - Remove and Install

Usage:

C18 DTP

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-0510  Driver 
8T-2998  Lubricant 
185-4758(1) Lubricant 
Loctite 587 
Loctite 242 
(1) For use in EAME

Start By:

  1. Remove the front housing.

  2. Remove the air compressor, if necessary.

  3. Remove the water pump, if necessary.

  4. Remove the auxiliary water pump, if necessary.

  5. Remove the fuel transfer pump, if necessary.


NOTICE

Do not turn the crankshaft or the camshaft while the camshaft gear is removed. If the front gear group is not correctly timed during installation, interference can occur between the pistons and the valves, resulting in damage to the engine.


Note: Be sure to mark the orientation of each of the gears for installation purposes.



    Illustration 1g01008429

  1. Remove bolts (2) and thrust plate (1).


    Illustration 2g01008430

  2. Remove sealing plate (3) and adapter (4).


    Illustration 3g01008431

  3. Remove O-ring seal (5) and O-ring seal (6) from sealing plate (3).


    Illustration 4g01101536

  4. Remove bolts (8), plate (9), and adjustable idler gear assembly (7).

  5. Use Tooling (A) and remove the sleeve bearing from adjustable idler gear assembly (7).


    Illustration 5g01101045

  6. Remove bolts (11), plate (12), and idler gear assembly (10).

  7. Use Tooling (A) and remove the sleeve bearing from idler gear assembly (10).


    Illustration 6g01101048

  8. Remove bolts (14), plate (15), and cluster gear assembly (13).

  9. Use Tooling (A) and remove the sleeve bearing from cluster gear assembly (13).


    Illustration 7g01101050

    Note: Stub shaft assembly (16) must be removed in order to remove plate (22). The backlash for the camshaft gear and the adjustable idler gear assembly will need to be readjusted at assembly.

  10. Remove nuts (17) and remove stub shaft assembly (16).

    Note: Stub shaft (18) must be removed in order to remove plate (22).

  11. Remove nuts (19) and remove stub shaft (18).

  12. Remove bolts (21) and remove stub shaft (20).

  13. Remove locking bolts (23) that hold plate (22) to the cylinder block. Remove plate (22).

  14. If studs (24) are loose or the threads are damaged, remove the studs from the front plate.


    Illustration 8g01101052

  15. Remove integral seal (25) from the cylinder block.

Installation Procedure


NOTICE

Do not turn the crankshaft or the camshaft while the camshaft gear is removed. If the front gear group is not correctly timed during installation, interference can occur between the pistons and the valves, resulting in damage to the engine.


  1. Thoroughly clean the gasket material from the cylinder block and both sides of the plate.


    Illustration 9g01101567

  2. If studs (24) are loose or the threads are damaged, install new studs (24) in the front plate. Apply Tooling (D) to the serrations of studs (24). Install studs (24) in the front plate.

  3. Install integral seal (25) on the dowel pins on the cylinder block.

    Note: Apply Tooling (C) to the bottom of integral seal (25) to fill the space at the cylinder block, front housing, and engine oil pan.

  4. Install plate (22) on the dowel pins on the cylinder block. Install new locking bolts (23) (Marked "X") in order to fasten the front plate to the cylinder block. Tighten locking bolts (23) to a torque of 55 N·m (41 lb ft).

    Note: Clean the old sealant from the bolts and apply Tooling (D) to the bolts.

  5. Tighten locking bolts (23) again to a torque of 55 N·m (41 lb ft).


    Illustration 10g01101565

  6. Install stub shaft (18). Apply Tooling (D) to the studs and the bolt for stub shaft (18). Tighten nuts (19) and the bolt to a torque of 55 ± 10 N·m (41 ± 7 lb ft).

  7. Install stub shaft assembly (16). Apply Tooling (D) to the studs and the bolt for stub shaft assembly (16). Do not tighten nuts (17) and the bolt for stub shaft assembly (16) at this time. Nuts (17) and the bolt for stub shaft assembly (16) will need to be tightened when the backlash is adjusted.

  8. Adjust the backlash between the camshaft gear and the adjustable idler gear assembly. The backlash should be 0.356 ± 0.254 mm (0.014 ± 0.010 inch). Refer to Testing and Adjusting, "Gear Group (Front) - Time" for the backlash adjustment procedure. Tighten nuts (17) and the bolt to a torque of 55 ± 10 N·m (41 ± 7 lb ft).

  9. Install stub shaft (20). Apply Tooling (D) to bolts (21). Install bolts (21) and tighten in a numeric sequence 1, 3, 4, 5, 2, 1, 2, 3, 4, 5, 1 to a torque of 55 ± 10 N·m (41 ± 7 lb ft).


    Illustration 11g01101161

  10. Use Tooling (A) to install the sleeve bearing in cluster gear assembly (13).

  11. Put cluster gear assembly (13) on the stub shaft. Ensure that Timing Marks (V) are aligned on the cluster gear assembly and the crankshaft gear.

  12. Position plate (15) with the oil groove toward the face of the gear. Apply Tooling (D) to bolts (14). Install bolts (14). Tighten bolts (14) to a torque of 30 ± 7 N·m (22 ± 5 lb ft).


    Illustration 12g01101045

  13. Use Tooling (A) to install the sleeve in idler gear assembly (10).

  14. Put idler gear assembly (10) on the stub shaft. Install plate (12) with the oil groove toward the gear face. Apply Tooling (D) to bolts (11). Install bolts (11). Tighten bolts (11) to a torque of 30 ± 7 N·m (22 ± 5 lb ft).


    Illustration 13g01008436

  15. Use Tooling (A) to install the sleeve bearing in adjustable idler gear assembly (7).

    Note: Align the oil hole in the bearing with the oil hole in the adjustable idler gear assembly.

  16. Put adjustable idler gear assembly (7) on the stub shaft assembly. Position plate (9) with the oil groove toward the face of the gear. Apply Tooling (D) to bolts (8). Install bolts (8). Tighten bolts (8) to a torque of 30 ± 7 N·m (22 ± 5 lb ft).

    Note: Check the backlash for the camshaft gear and the adjustable idler gear assembly. The camshaft gear must be installed and the adjustable idler gear assembly must be removed in order to perform the backlash adjustment procedure. Refer to Testing and Adjusting, "Gear Group (Front) - Time".



    Illustration 14g01008431

  17. Install O-ring seal (5) and O-ring seal (6) in sealing plate (3). Lubricate O-ring seal (6) with a 50/50 mixture of Tooling (B) and clean engine oil.


    Illustration 15g01008430


    Illustration 16g01010256

  18. Install adapter (4). Ensure that the dowel in the adapter engages the hole in the camshaft.

  19. Install sealing plate (3) and thrust plate (1). Ensure that the dowel in the adapter engages the hole in the thrust plate. Apply Tooling (D) to bolts (2). Install bolts (2). Evenly tighten bolts (2) in order to ensure that sealing plate (3) and O-ring seal (5) are seated against the cylinder head.

  20. Adjust the backlash for the camshaft gear and the adjustable idler gear, if necessary. Refer to Testing and Adjusting, "Gear Group (Front) - Time".

    Note: The camshaft gear must be installed and the adjustable idler gear must be removed in order to perform the backlash adjustment procedure.

End By:

  1. Install the fuel transfer pump, if necessary.

  2. Install the auxiliary water pump, if necessary.

  3. Install the water pump, if necessary.

  4. Install the air compressor, if necessary.

  5. Install the front housing.

Caterpillar Information System:

Installation Instruction of Firmware on Network Management Cards{4480, 7620} Installation Instruction of Firmware on Network Management Cards{4480, 7620}
C18 Marine Engines Front Cover - Remove and Install
C18 Marine Engines Crankshaft Front Seal - Remove and Install
C18 Marine Engines Vibration Damper and Pulley - Remove and Install
C18 Marine Engines Flywheel Housing - Remove and Install
C18 Marine Engines Crankshaft Rear Seal - Remove and Install
C18 Marine Engines Flywheel - Remove and Install
3512C and 3516C Marine Engines Electronic Control Module (ECM)
C18 Marine Engines Engine Support (Front) - Remove and Install
C7.1-XQ200 Rental Generator Set Belts - Inspect/Adjust/Replace
C18 Marine Engines Engine Oil Pump - Remove and Install
G3500 Engines Product Lifting
C18 Marine Engines Housing (Front) - Remove and Install
G3516C and G3516E Gas Engines Engine Oil Cooler Bypass Valve
3516B Engine for the MT4400D Off-Highway Truck Air Lines - Aftercooler
C7.1 Industrial Engine Air Inlet and Exhaust System - Series Turbochargers
C7.1 Industrial Engine Turbocharger - Inspect - Series Turbochargers
2012/09/13 A New Turbocharger Housing is Used on Certain 3512 Engines {1052, 1065}
C7.1 Industrial Engine Turbocharger - Inspect - Single Turbocharger
C7.1 Industrial Engine Air Inlet and Exhaust System - Single Turbocharger
C7.1 Industrial Engine Fuel Injection
3500B Generator Sets Generator Bearing Temperature - Test/Record
C18 Marine Engines Valve Mechanism Cover - Remove and Install
C7.1 Industrial Engine Electronic Control System
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.