Installation Procedure for the 467-8080 TLV2 Seat Suspension Harness Kit{1408, 7312, 7324} Caterpillar


Installation Procedure for the 467-8080 TLV2 Seat Suspension Harness Kit{1408, 7312, 7324}

Usage:

826K 232
Landfill Compactor:
826K (S/N: SET1-UP; 2321-UP)
Soil Compactor:
825K (S/N: SEE1-UP; 2331-UP)
Off-Highway Truck/Tractor:
770 (S/N: BZZ1-UP)
770G (S/N: RMA1-UP; TWA1-UP; KDH1-UP; ECM1-UP; ECX1-UP)
772 (S/N: RLB1-UP)
772G (S/N: LTS1-UP; KEX1-UP; LTX1-UP)
773F (S/N: EED1-UP; EXD1-UP)
777F (S/N: JRP1-UP; JXP1-UP)
777G (S/N: T5A1-UP; TNM1-UP; RDR1-UP; T4Y1-UP; GT71-UP)
785G (S/N: RTL1-UP)
789D (S/N: SPD1-UP; SHH1-UP; TWP1-UP)
793F Series AC (S/N: EMD1-UP)
793F (S/N: SND1-UP; SSP1-UP; SXP1-UP; RBT1-UP)
795F Series AC (S/N: ERM1-UP)
795F (S/N: SNT1-UP)
797F (S/N: LAJ1-UP; WSP1-UP)
CAT MT4400D AC (S/N: MH41-UP; MT41-UP)
CAT MT5300D AC (S/N: MN51-UP; MT51-UP)
OEM POWERTRAIN (S/N: DTE1-UP)
Quarry Truck:
773G (S/N: MWH1-UP; JWS1-UP; T5S1-UP; T5T1-UP)
775F (S/N: EYG1-UP; DLS1-UP)
775G (S/N: T5F1-UP; RFM1-UP; MJS1-UP; T5W1-UP)
Track-Type Loader:
953D (S/N: LBP1-UP)
963D (S/N: LCS1-UP)
Underground Articulated Truck:
AD30 (S/N: DXR1-UP; GXR1-UP)
AD45B (S/N: CXM1-UP)
AD55 (S/N: DNW1-UP)
AD55B (S/N: JNW1-UP)
AD60 (S/N: KNW1-UP)
Wheel Dozer:
824K (S/N: RWB1-UP; 2341-UP)
834K (S/N: LWY1-UP; TWY1-UP)
844K (S/N: KLS1-UP)
854K (S/N: H9K1-UP; H8M1-UP)
Wheel Loader:
924K (S/N: ENC1-UP; HJF1-UP; PWR1-UP)
930K (S/N: DYB1-UP; EYE1-UP; RHN1-UP)
938K (S/N: SWL1-UP; XXT1-UP; HFW1-UP)
950M (S/N: EMB1-UP; FTR1-UP)
962M (S/N: EJB1-UP; F2T1-UP)
966K (S/N: PBG1-UP; TFS1-UP; NGX1-UP)
966M Series XE (S/N: P6C1-UP)
966M (S/N: DYC1-UP; KJP1-UP)
972K (S/N: PEM1-UP; Z4W1-UP)
972M Series XE (S/N: EDW1-UP)
972M (S/N: A8P1-UP; JPR1-UP)
980K (S/N: W7K1-UP; NEP1-UP; GTZ1-UP)
980M (S/N: KRS1-UP; N8T1-UP)
982M (S/N: F9A1-UP; K1Y1-UP)
988K (S/N: LWX1-UP; TWX1-UP)
990K (S/N: DJK1-UP; A9P1-UP)
992K (S/N: ZMX1-UP; 8801-UP)
993K (S/N: Z4D1-UP; Z9K1-UP; Z4Z1-UP)
994H (S/N: DWC1-UP)
994K (S/N: MRK1-UP)

Introduction

467-8080 Seat Wiring Gp installation instructions.

Introduction

This Special Instruction provides an improved routing procedure to install a replacement 467-8080 Kit-Wire Harness . The 467-8080 Kit-Wire Harness is for "TLV2" 348-2373 Seat Suspension Gp , 348-2409 Seat Suspension Gp , 355-6681 Seat Suspension Gp , 373-8745 Seat Suspension Gp , 399-1560 Seat Suspension Gp , 421-1223 Seat Suspension Gp , and 436-8490 Seat Suspension Gp in operator cabs on certain machines. The improved wiring harness routing location and installation procedure will extend the service life of the 467-8080 Kit-Wire Harness . The 467-8080 Kit-Wire Harness will replace 370-8069 Kit-Wire Harness on all "TLV2" suspensions.

Refer to the necessary parts list.

Do not perform any procedure in this publication or order any parts until you understand the information that is contained in this publication.

Safety

------ WARNING! ------

Do not attempt to assemble this machine until you read and you understand the assembly instructions.

Improper assembly procedures could result in injury or death.

----------------------

Required Parts

Table 1
Required Parts for 467-8080 Seat Wiring Gp    
Qty     Part Number     Part Description    
1     192-7805     Valve Harness As    
1     387-0317     Wire As    
1     416-6223     Wire As    
4     3S-2093     Cable Strap    
1     467-8173     Cable Tie Mounting    
15 cm (6 inch)     211-5358     Flexible Conduit    

Machine Preparation

  1. Move the machine to a smooth, level surface that will support the weight of the machine.

  1. Lower all attachments to ground level.

  1. Ensure that the engine of the machine is OFF and the machine is locked out.

Existing Harness Removal

  1. Remove fasteners from mounting locations and remove seat and seat suspension from the machine.



    Illustration 1g03862007

    View of seat suspension boot removal

    (A) 192-7795 Boot

  1. Remove boot (A) from the seat suspension.

  1. Retain the removed components in order to install after the harness assembly has been replaced.

  1. Remove existing tie straps from 192-7805 Harness As .



    Illustration 2g03862012

    View of harness routing

    (B) Bolt

    (C) P-Clip

  1. Remove bolt (B) and p-clip (C) securing harness to center plate.

    Note: Do not move or tip suspension on its side after bolt is removed or air spring will fall out of place.

  1. Remove existing harness from seat suspension.

Harness Installation

Note: If hole pictured in Illustration 3 is not present on suspension top plate, proceed to step 1. If hole is present, proceed to step 2.




    Illustration 3g03862016

    View of dimensions for new hole

    (D) 35 ± 5 mm (1.4 ± 0.19 inch)




    Illustration 4g03862018

    View of dimensions for new hole

    (E) 12 ± 5 mm (0.5 ± 0.19 inch)

  1. Drill hole for new cable tie mounting (1) .

    Use existing hole under seat tracks as reference.

    Note: cable tie mounting (1) requires hole to be 4.9 mm (0.19 inch) to 5.1 mm (0.2 inch).




    Illustration 5g03862032

    View of conduit installation

    (2) 211-5358 Flexible Conduit

  1. Place 150 mm (6 inch) of conduit (2) on harness and orange jumper wire routed to switch. Conduit should start at heat shrink of red wire.

  1. Connect the red wire to angled switch contact on right-hand side of the switch. Connect the orange wire to straight switch contact on left-hand side of the switch.



    Illustration 6g03862047

    View of fir tree installation

    (1) 467-8173 Cable Tie Mounting

  1. Secure cable tie mounting (1) to harness and install in hole.



    Illustration 7g03862062

    View of conduit installation

    (2) 211-5358 Flexible Conduit

    (3) 3S-2093 Cable Strap

  1. Secure end of conduit (2) near compressor using cable strap (3) .



    Illustration 8g03862064

    View of harness installation

    (F) Orange Wire

    (G) Black Wire

  1. Connect the orange wire terminal (F) to compressor contact on the right. Wire should be routed downwards, as shown in Illustration 8.

    Connect the black wire terminal (G) to compressor contact on the left. Wire should be routed upwards and loop around, as shown in Illustration 8.




    Illustration 9g03862066

    View of harness routing

    (3) 3S-2093 Cable Strap

  1. use cable strap (3) to secure orange and black jumper wires to compressor housing.



    Illustration 10g03862072

    View of wiring harness routing

    Note: Conduit routed down center plate should be positioned behind airline conduit to ensure that wires do not rub on airline conduit.




    Illustration 11g03862073

    View of wiring harness routing

  1. Tie strap harness and airline to center casting.



    Illustration 12g03862099

    View of p-clip installation

    (B) Bolt

    (C) P-Clip

    (2) 211-5358 Flexible Conduit

  1. Install existing p-clip (C) on to harness and secure bolt (B) to casting. Torque bolt (B) to 5 ± 0.5 N·m (44 ± 4 lb in).

    Note: Conduit (2) should extend 114 mm (4.5 inch) past the center of p-clip (C) .




    Illustration 13g03862106

    View of harness routing

    (3) 3S-2093 Cable Strap

  1. Tie strap harness to back of casting, using cable strap (3) .



    Illustration 14g03862115

    View of suspension at the top of the cycle




    Illustration 15g03862116

    View of suspension going through the mid-range cycle

  1. While the suspension is at the top of the cycle and going through its mid-range cycle, the harness should not rub on other components.

  1. Check harness routing in Step 3 and ensure that harness is in the correct location prior to completing the assembly process.

  1. The harness should be routed as is represented in Illustrations 5 and 7.

Seat Suspension Boot and Components Installation

  1. Ensure Harness Assembly and Seat Suspension functions properly.



    Illustration 16g03862121

    View of harness routing

  1. Reinstall Boot and fasteners. Ensure that harness has been routed through hole in suspension boot. The rest of the harness will exit the boot.

  1. Reinstall Seat and Seat Suspension in the machine.

  1. Remove lock out from machine.

Caterpillar Information System:

Software Updates for Certain Tier 4 Final Industrial Engines{1000, 1920} Software Updates for Certain Tier 4 Final Industrial Engines{1000, 1920}
C280-08 Tier 4 Engine Turbocharger - Assemble
3512C Generator Set Engine Fuel Pressure Sensor - Remove and Install
C3.4B Engines Component Location
C3.4B Engines General Information
349F and 352F Excavators Machine System Specifications Front Lines
C15 and C18 Engines for Caterpillar Built Machines Fuel Priming Pump and Primary Fuel Filter
3512C Generator Set Engine Engine Speed Sensor - Remove and Install
XQ400 Power Module Model View Illustrations
C8.7 Marine Engine Crankshaft Gear - Remove and Install
3512C Generator Set Engine Atmospheric Pressure Sensor - Remove and Install
3512C Generator Set Engine Crankcase Pressure Sensor - Remove and Install
2015/07/23 Improved Lines Group for the Seat Suspension Is Now Available for Certain Machines {7312, 7324}
3512C Generator Set Engine Air Inlet Manifold - Remove and Install
794 AC Off-Highway Truck Field Assembly Brakes - Install
3512C Generator Set Engine Rocker Shaft and Pushrod - Install
G3606 and G3608 Engines Gear Group (Rear) - Remove and Install
XQ400 Power Module Coolant Level - Check
XQ400 Power Module Fan Drive Bearing - Lubricate
XQ400 Power Module Plate Locations and Film Locations
XQ400 Power Module Sensors and Electrical Components
Energy Storage System Rectifier Configuration
C280 Marine Engines Air Inlet and Exhaust System Operation - Aftertreatment
HPU300 Hydraulic Power Pack Transport Information
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.