Removal Procedure
Show/hide table
|
NOTICE |
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
|
Note: The removal procedures for the front axle shafts and for the rear axle shafts are identical.
Show/hide table
|
|
|
Illustration 1 | g00518550 |
- Move the machine until drain plug (3) is in DOWNWARD position. Remove drain plug (3) and drain the oil into a suitable container.
- Remove six bolts (1), the washers and cover assembly (2) .
Show/hide table
|
|
|
Illustration 2 | g00518582 |
- Remove O-ring seal (4) from the final drive.
Show/hide table
|
|
|
Illustration 3 | g00518597 |
Show/hide table
|
|
|
Illustration 4 | g00518599 |
- Install 1/2" - 13 NC Eyebolt (5) in the end of the axle shaft. Use the eyebolt to pull axle shaft (6) from the final drive by approximately 508 mm (20 inch).
- Attach a hoist and a suitable lifting sling to axle shaft (6), as shown.
- Use the hoist to carefully remove axle shaft (6). The weight of the axle shaft is 41 kg (90 lb).
Show/hide table
|
|
|
Illustration 5 | g00518626 |
- Remove retaining ring (7) and sun gear (8) from axle shaft (6) .
Installation Procedure
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
4C-6408     |
Axle Support     |
1     |
B     |
2P-8312     |
Pliers     |
1     |
Note: The installation procedures for the front axle shaft and for the rear axle shafts are identical.
Note: Thoroughly clean all of the components prior to installation.
Show/hide table
|
|
|
Illustration 6 | g00518626 |
- Install sun gear (8) and retaining ring (7) on axle shaft (6) .
- Attach a hoist and a suitable lifting sling to the axle shaft.
Show/hide table
|
|
|
Illustration 7 | g00518599 |
- Use the hoist to carefully install axle shaft (6) in the final drive. The weight of the axle shaft is 41 kg (90 lb). Remove the lifting sling.
Show/hide table
|
|
|
Illustration 8 | g00518783 |
- Slide Tooling (A) over the end of the axle shaft, as shown. Use Tooling (A) to guide the axle shaft in position in the final drive.
Show/hide table
|
|
|
Illustration 9 | g00518784 |
- Align sun gear (8) with the planetary gears and slide the sun gear completely on the axle shaft. Remove Tooling (A) .
Show/hide table
|
|
|
Illustration 10 | g00518787 |
- Use Tooling (B) to install retaining ring (7) .
Show/hide table
|
|
|
Illustration 11 | g00518582 |
- Install O-ring seal (4) in the groove of the final drive assembly.
Show/hide table
|
|
|
Illustration 12 | g00518550 |
- Install cover assembly (2), six bolts (1) and the washers. Tighten the bolts to a torque of 105 ± 20 N·m (77 ± 15 lb ft).
- Install drain plug (3) .
- Fill the axle housing with oil. For the correct procedure, refer to Operation and Maintenance Manual for the machine that is being serviced.