Pivot Shaft Seals-Assemble
Assembly Procedure
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Description     | Qty     |
A     | 1F-7958     | Nut (1/2 inch by 13)     | 4     |
5P-8245 | Washer     | 4     | |
Threaded Rod (1/2 inch by 13 by 8 inch)     | 2     | ||
B     | 8T-3053     | Seal Installer     | 1     |
6V-3141 | Puller Plate     | 1     | |
C     | 5P-3413     | Pipe Sealant     | 1     |
Show/hide table
Personal injury can result from performing service on the track roller frame. Refer to Special Instruction, SMHS8273 for inspection and removal procedures before performing any service. |
- Lower the temperature of two bearings (1) . Install the bearings in the sides of the track roller frame.
Show/hide table
Illustration 1 | g00626474 |
- ApplyTooling (C) on the outer diameter of seal (2) . Use a press in order to install seal (2) in retainer (3) .
Show/hide table
Illustration 2 | g00831217 |
- Use the following procedure in order to align and assemble the two retainers:
- Position Tooling (A) against the inside of the holes in retainer (3) . See Illustration 3. In order to obtain accurate measurements, make sure that the threaded rods (Tooling (A) ) are against the inside of the bolt holes.
- Measure the distance from one threaded rod to bolt hole (5) in the retainer. Record the dimension.
- Measure the distance from the other threaded rod to bolt hole (6) in the retainer. Record the dimension.
- Compare the dimensions from Step 3.b and from Step 3.c. If the dimensions are not equal, rotate retainer (4) on retainer (3) . Measure the dimensions again. Repeat this procedure until both dimensions are equal.
Show/hide table
Illustration 3 | g00834165 |
Show/hide table
Illustration 4 | g00831221 |
Note: Retainer (4) is a press fit in seal (2) . The retainer will not rotate after installation. Retainer (4) must be oriented correctly with retainer (3) during installation. The bolt holes in both of the retainers must be aligned with the bolt holes in the track roller frame and in the frame of the machine before assembly.
- Make a mark (7) on seal (2) and on retainer (4) in order to facilitate assembly.
- Apply 5P-3413 Sealant to retainer (4) . Position the two retainers in a press. Check the alignment marks.
Show/hide table
Illustration 5 | g00831226 |
Show/hide table
Illustration 6 | g00831230 |
- Use the press and Tooling (B) in order to install retainer (3) on retainer (4) . Use the press and Tooling (B) in order to install seal (2) on retainer (4) .
- Lower the temperature of plate (8) . Install the plate evenly with retainer (3) .
Show/hide table
Illustration 7 | g00626476 |
- Turn over the retainer, and install O-ring seal (9) .
Show/hide table
Illustration 8 | g00831232 |
- Place the retainer on the track roller frame. Install bolts (10) .
Show/hide table
Illustration 9 | g00626483 |
- Install the single flange rollers and the double flange rollers in the original positions. See the procedure in Disassembly and Assembly, "Track Roller - Install" in this module.
- Install the track idlers. See the procedure in Disassembly and Assembly, "Idler - Install" in this module.
End By: Install the track roller frame. See the procedure in Disassembly and Assembly, "Track Roller Frame - Install" in this module.
Caterpillar Information System:
D7R Track-Type TractorPower Train Pivot Shaft Seals-Disassemble
D7R Track-Type TractorPower Train Track Roller Frame - Remove
611 Wheel Tractor-Scraper Cooling System Coolant (DEAC) - Change
D7R Track-Type TractorPower Train Sprocket Segment - Remove and Install
D7R Track-Type TractorPower Train Track - Connect
D7R Track-Type TractorPower Train Track - Assemble
D7R Track-Type TractorPower Train Track - Disassemble
D7R Track-Type TractorPower Train Track - Separate
D7R Track-Type TractorPower Train Track Roller - Install
D7R Track-Type TractorPower Train Track Roller - Assemble
973 Track-Type Loader Steering Linkage - Lubricate
D7R Track-Type TractorPower Train Track Roller - Disassemble
D7R Track-Type TractorPower Train Track Roller Frame - Install
D7R Track-Type TractorPower Train Front Track Roller Frame - Remove
D7R Track-Type TractorPower Train Front Track Roller Frame - Install
D8R Track-Type Tractor Hydraulic System Bulldozer and Ripper Control Linkage
D7R Track-Type TractorPower Train Track Adjuster - Remove
D7R Track-Type TractorPower Train Track Adjuster - Disassemble
D7R Track-Type TractorPower Train Track Adjuster - Assemble
IT14G Integrated Toolcarrier and 914G Wheel Loader Power Train Piston Motor (Hydrostatic)
D7R Track-Type TractorPower Train Track Adjuster - Install
D6R Track-Type Tractor 3306B Engine Supplement Alternator - Remove and Install
D7R Track-Type TractorPower Train Idler - Remove
611 Wheel Tractor-Scraper Cooling System Coolant (ELC) - Change