Grapple Housing and Shell Gp - Assemble
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 189-0410 | Shackle As | 1 |
B | 3E-3881 | Eyebolts | 2 |
D | 1P-0520 | Driver Gp | 1 |
E | 350-7768 | Electric Hydraulic Pump Gp (115V) | 1 |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
6V-3160 | Double Acting Cylinder | 1 | |
9S-5564 | Pin Puller Sleeve As | 1 | |
4C-9634 | Puller Stud | 1 | |
1P-0544 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Hard Washer | 1 | |
1P-1836 | Bearing Puller Adapter | 1 | |
F | 452-6006 | Grease | - |
G | - | Loctite 243 | - |
Show/hide table
When you are using hydraulic cylinders and puller studs, always ensure that the rated capacity of the puller stud meets or exceeds the rated capacity of the hydraulic cylinder. If the puller stud does not meet or exceed the rated capacity of the hydraulic cylinder, a sudden failure of the puller stud could occur. The sudden failure of the puller stud could result in personal injury or death. |
- Use Tooling (E) to install bearing (21) in grapple housing (20). Install bearing (21) in grapple housing (20) to Dimension (Z). Dimension (Z) is
5 ± 0.5 mm (0.2 ± 0.02 inch) . - Install lip seals (22).
Show/hide table
Illustration 3 g06210165 - Attach Tooling (A), Tooling (B), and a suitable lifting device to the housing of grapple arrangement (1). Refer to Table 2 for the approximate weight of grapple arrangement (1).
Note: Tooling (A), Tooling (B), and a suitable lifting device will be attached to grapple arrangement (1) during the assembly procedures.
Show/hide tableTable 2 Approximate Weights for Grapple Arrangement (1) Serial Number Prefix (S/N) Approximate Weight AC2 1640 kg (3616 lb) Z2G 2220 kg (4895 lb) Show/hide tableIllustration 4 g06210187 - Attach a suitable bar and a suitable lifting device to position shell assembly (19). Refer to Table 3 for the approximate weight of shell assembly (19).
Show/hide table
Table 3 Approximate Weights for Shell Assembly (19) Serial Number Prefix (S/N) Approximate Weight AC2 360 kg (794 lb) Z2G 625 kg (1378 lb) Show/hide tableIllustration 5 g06210816 - Align the bores of shell assembly (19) and the bores of the grapple housing.
- Coat the bores for pin (17) with Tooling (F). Install pin (17). Repeat for the other pin.
Show/hide table
Illustration 6 g06210185 Show/hide tableIllustration 7 g06210184 - Install grease fitting (18) to pin (17).
- Apply Tooling (G) to the threads of bolt (15). Install plate (16) and bolt (15).
- Repeat Steps 7 and 8 for the other pin.
Show/hide table
Illustration 8 g06210179 Show/hide tableIllustration 9 g06210805 - Use Tooling (D) and a suitable press to install bushings (14) in link assemblies (7). Install bushings (14) to Dimension (Y). Dimension (Y) is
5 ± 0.5 mm (0.2 ± 0.02 inch) . - Install lip seals (13).
Show/hide table
Illustration 10 g06210182 - Connect link assemblies (7) to cover assembly (8).
Show/hide table
Illustration 11 g06210824 - Use a suitable bar and a suitable lifting device to support link assemblies (7) and cover assembly (8). The combined weight of link assemblies (7) and cover assembly (8) is approximately
60 kg (132 lb) . - Align the bores of shell assembly (6) to the bores of link assemblies (7).
- Coat the bores for pin (12) with Tooling (F). Install pin (12).
Show/hide table
Illustration 12 g06238639 - Apply Tooling (G) to the threads of bolts (9). Install grease fitting (11), plate (10), the washers, and bolts (9).
Show/hide table
Illustration 13 g06210174 - Use a suitable bar to support link assemblies (7). The combined weight of link assemblies (7) and the cover assembly is approximately
60 kg (132 lb) . - Attach a suitable bar and a suitable lifting device to shell assembly (6). Refer to Table 4 for the approximate weight of shell assembly (6).
Show/hide table
Table 4 Approximate Weights for Shell Assembly (6) Serial Number Prefix (S/N) Approximate Weight AC2 390 kg (860 lb) Z2G 655 kg (1444 lb) Show/hide tableIllustration 14 g06211019 - Align the bores of grapple housing (20) and the bores of shell assembly (6).
- Coat the bores for pin (4) with Tooling (F). Install pin (4). Repeat for the other pin.
Show/hide table
Illustration 15 g06210171 Show/hide tableIllustration 16 g06210170 - Install grease fitting (5) to pin (4).
- Apply Tooling (G) to the threads of bolt (3). Install plate (2), the washers, and bolt (3).
- Repeat Steps for the other pin.
Show/hide table
Illustration 1 | g06210188 |
Show/hide table
Illustration 2 | g06210806 |
End By:
- Install the hydraulic cylinder.
Caterpillar Information System:
G315B and G320B Waste Handling Grapple Grapple Housing and Shell Gp - Disassemble
G315B and G320B Waste Handling Grapple Hydraulic Cylinder - Remove and Install
G315B and G320B Waste Handling Grapple Mounting Bracket - Remove and Install
Installation of the 494-9529 Front Lines Gp on Certain Hydraulic Excavators {5057} Installation of the 494-9529 Front Lines Gp on Certain Hydraulic Excavators {5057}
730, 730 Ejector, 735, 740 Ejector, and 745 Articulated Trucks Information Display Display Features
320D2 FM Forestry Machine Engine Supplement Turbocharger - Remove and Install
Procedure to Troubleshoot the Transmission Speed Sensor on Certain Material Handlers, Mobile Hydraulic Power Units, and Wheeled Excavators {3030} Procedure to Troubleshoot the Transmission Speed Sensor on Certain Material Handlers, Mobile Hydraulic Power Units, and Wheeled Excavators {3030}
320D2 FM Forestry Machine Engine Supplement Muffler - Remove and Install
A New Warning Film Is Now Available for the Material Handling Arms {6542, 7405} A New Warning Film Is Now Available for the Material Handling Arms {6542, 7405}
336 and 336 GC Excavator Equipment Lowering with Engine Stopped
340 Excavator Engine and Machine Warm-Up
PM820, PM822, and PM825 Cold Planer Machine Systems Flow Control Valve - Remove and Install - Front
730, 730 Ejector, 735, 740 Ejector, and 745 Articulated Trucks Information Display Display Navigation
S2050, S3050, S2070, S3070, S2090 and S3090 Shears General Information - Rotating Shear
A Ground Wiring Addition Is Now Used for the ARD Nozzle Heater Relay on Certain C9.3 through C18 Tier 4 Machine Engines {1050, 108D, 1422, 4493} A Ground Wiring Addition Is Now Used for the ARD Nozzle Heater Relay on Certain C9.3 through C18 Tier 4 Machine Engines {1050, 108D, 1422, 4493}
Bluetooth Operator ID and Machine Security System (MSS) General Information
336 and 336 GC Excavator Stopping the Engine
320D2 FM Forestry Machine Engine Supplement Water Temperature Regulator - Remove and Install
320D2 FM Forestry Machine Engine Supplement Water Pump - Remove and Install
730, 730 Ejector, 735, 740 Ejector, and 745 Articulated Trucks Information Display Menu Navigation
Improved Handrail Assembly Is Now Used on Certain Excavators and Forest Machines Fitted with A Rear Entry Cab {7260} Improved Handrail Assembly Is Now Used on Certain Excavators and Forest Machines Fitted with A Rear Entry Cab {7260}
PM820, PM822, and PM825 Cold Planer Machine Systems Gear Pump (Charge) - Disassemble
PM820, PM822, and PM825 Cold Planer Machine Systems Gear Pump (Charge) - Assemble
New Hydraulic Pump Pressure Plates are Now Available for Certain Excavators and Wheeled Excavators {5073} New Hydraulic Pump Pressure Plates are Now Available for Certain Excavators and Wheeled Excavators {5073}