Assembly Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. All disassembly and all assembly procedures must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and protected at all times.
Note: Check the O-ring seals and the seals for wear or for damage. Replace the components, if necessary.
Note: Apply a light film of hydraulic oil to all components before assembly.
- Install spring (13), regulator (12), and plunger (11) .
Illustration 1 | g01682673 |
Improper assembly of parts that are spring loaded can cause bodily injury. To prevent possible injury, follow the established assembly procedure and wear protective equipment. |
- Repeat Step 1 for the remaining ports.
- Install lever (10) .
Illustration 2 | g00768388 |
- Install retaining pin (9) .
Illustration 3 | g00768385 |
- Install plate (8). Install screws (7) .
Illustration 4 | g00768383 |
- Repeat Step 3 through Step 5 in order to install the other lever kit.
- Install plate (5) on valve body (6) .
Illustration 5 | g01529560 |
Illustration 6 | g01529541 |
- Install lever kit (4) and (2) on valve body (6) .
- Install bolts (3) and (1) in order to retain the lever kits.
End By: Install the pilot valve (stabilizer) in the cab. Refer to Disassembly and Assembly, "Pilot Valve (Stabilizer) - Install".