C7 Marine Engines Caterpillar


Engine Oil Cooler - Install

Usage:

C7 C7B

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1U-6396     O-Ring Assembly Compound     1    


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


  1. Lubricate all O-ring seals with Tooling (A) .



    Illustration 1g01090686

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position the gasket and engine oil cooler (8) on the engine.

  1. Position the gasket and oil cooler base (7) on the engine.

  1. Install bolts (6) .

  1. Install engine oil cooler bypass valve (5) .



    Illustration 2g01078897

  1. Position housing (4) on the oil cooler base. Install bolts (3) .

  1. Connect tube assemblies (2). Install hose assembly (1) .

End By: Install the heat exchanger. Refer to Disassembly and Assembly, "Heat Exchanger - Install".

Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.