C9 Urban Transit Bus Engine Caterpillar


Air Inlet Cover - Install

Usage:

C-9 MTB

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     4C-9500     Quick Cure Primer     1    
B     8C-8422     Sealant     1    


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


  1. Clean the inlet manifold heater face with cleaning solvent. Apply Tooling (A) to the inlet manifold heater face. Allow Tooling (A) to dry for 3 to 5 minutes. Apply Tooling (B) to the joint face and spread uniformly. Heater assembly must be installed and tightened within 10 minutes.



    Illustration 1g01137540

  1. Position air inlet cover (7) and inlet manifold heater (4) on the cylinder block. Install bolts (3) . Tighten bolts (3) to a torque of 28 ± 7 N·m (21 ± 5 lb ft).

  1. Install ground straps (5) (if equipped).

  1. Connect hose assembly (6) to air inlet cover (7) .

    Note: The brackets that hold down the harness assemblies must be installed in the proper locations.

  1. Connect harness assemblies (1) and (2) .
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.