Bucket - Remove
Removal Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 5P-8715     | Forcing Bolt     | 3     |
Start By:
- Connect the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect".
- Attach a suitable lifting device to tilt link (1). The weight of tilt link (1) is approximately 160 kg (352 lb).
Show/hide table
Illustration 1 | g01082216 |
- Remove nut (2), the washer and the bolt.
- Remove three plugs (3) .
Show/hide table
Illustration 2 | g01084677 |
- Install Tooling (A). Tighten Tooling (A) evenly to remove collet (4) .
Show/hide table
Illustration 3 | g01082217 |
- Repeat Step 3 and Step 4 for the collet on the other side.
- Attach a suitable lifting device to pin (5). The weight of pin (5) is approximately 23 kg (50 lb).
Show/hide table
Illustration 4 | g01082225 |
- Remove pin (5) .
- Remove shims (6) .
Show/hide table
Illustration 5 | g01084267 |
- Lower tilt link (1) to the ground.
- Attach a suitable lifting device to bucket (7). The weight of bucket (7) is approximately 7200 kg (15880 lb).
Show/hide table
Illustration 6 | g01082229 |
- Remove bolt (8), the nut and washer from the bucket pin assembly.
Show/hide table
Illustration 7 | g01082230 |
- Remove three plugs (9) .
- Install Tooling (A). Tighten Tooling (A) evenly to remove collet (10) .
Show/hide table
Illustration 8 | g01082231 |
- Repeat Step 11 through Step 13 for the collet on the other side.
- Use two people to remove pin (11). The weight of pin (11) is approximately 23 kg (50 lb).
Show/hide table
Illustration 9 | g01082232 |
Show/hide table
Illustration 10 | g01082234 |
- Remove shims (12) .
- Repeat Step 11 through Step 16 for the bucket pin assembly on the other side.
- Remove bucket (7) .
Show/hide table
Illustration 11 | g01082229 |
Caterpillar Information System:
AP-800D and BG-230D Asphalt Pavers Machine Systems Truck Hitch
446D Backhoe Loader Power Train Final Drive (Drive and Steering Axle)(Front) - Disassemble - In Chassis
2004/08/02 New Proportional Control Handle Is Now Available {5705}
446D Backhoe Loader Power Train Final Drive (Drive and Steering Axle)(Front) - Remove
446D Backhoe Loader Engine Supplement Hydraulic Oil Cooler - Remove and Install
446D Backhoe Loader Power Train Drive and Steering Axle (Front) - Install
446D Backhoe Loader Power Train Drive and Steering Axle (Front) - Remove
988H Wheel Loader Power Train Engagement Pressure for the Transmission Clutch (Operator Monitor) - Calibrate
2004/07/05 Improved Analysis of Non-Warrantable Failures for Reman Vane Cartridges {5055}
446D Backhoe Loader Power Train Steering Cylinder (Front) - Remove and Install
2004/07/01 Engines Are Now Built with Semi-Crowned Lifter Rollers {1209}
446D Backhoe Loader Power Train Tie Rod (Steering)(Front) - Remove and Install
R1300G Load Haul Dump 3306 Engine Supplement Air Cleaner - Remove and Install
R2900G Load Haul Dump Power Train Differential and Bevel Gear (Front) - Remove
R2900G Load Haul Dump Machine Systems Bucket - Install
2004/07/26 Correction to Disassembly and Assembly, RENR4884 , "Track (Rubber) - Remove and Install - 287B Multi Terrain Loader" {4198}
446D Backhoe Loader Power Train Final Drive (Drive and Steering Axle)(Front) - Assemble - In Chassis
446D Backhoe Loader Power Train Final Drive (Drive and Steering Axle)(Front) - Install
AP-800D and BG-230D Asphalt Pavers Machine Systems Solenoid Valve (Truck Hitch)
988H Wheel Loader Power Train Engagement Pressure for the Lockup Clutch of the Torque Converter (Operator Monitor) - Calibrate
446D Backhoe Loader Power Train Transmission (Power Shift) - Remove
446D Backhoe Loader Power Train Transmission (Power Shift) - Disassemble
446D Backhoe Loader Power Train Transmission (Power Shift) - Assemble
446D Backhoe Loader Power Train Transmission (Power Shift) - Install