Containment - Before/After
(Limited distribution)
| PRODUCT SUPPORT PROGRAM FOR SUPPLEMENTING THE REWORK OF THE RIGHT HAND SIDE OF THE FRONT SUSPENSION MOUNTING ON CERTAIN 775F OFF-HIGHWAY TRUCKS |
7051 7201 |
PS90337 |
NOTE: |
This Containment Program can be administered either before or after a failure occurs.
In either case the decision whether to apply the Program is made by the dealer and service rep. Obtain the service reps Goodwill Approver Code
before completing the repair. EAME dealers should use their standard Industry Group specific goodwill approval codes. The Goodwill Approver Code must be included when submitting the claim. |
NOTE: |
When reporting the repair, use "PS90337" as the Part Number and "7777" as the Group Number.
If administered before failure, use "56" as Warranty Claim Description and "T" as the SIMS Description Code. If administered after failure, use "96" as Warranty Claim Description Code and use "Z" as the SIMS Description Code. |
NOTE: |
The information supplied in this service letter may not be valid after the termination date of this program.
Do not perform the work outlined in this Service Letter after the termination date without first contacting your Caterpillar product analyst. |
Certain Rework Procedures require additional labor time to perform, over and above those hours allocated to complete the update, on certain 775F Off-Highway Trucks. Under certain field conditions, and to adhere to some regulatory requirements, a second person may be necessary to assist in performing additional functions required to complete the Rework Procedure. |
No parts needed for this program |
Bring the machine up to current specification for improved service life and expected quality standard by performing specific front frame Service Letter Rework Procedures. This Service Letter program covers labor time when an additional person is required to assist in performing certain necessary operations while carrying out required Rework Procedures. |