Parts and Specification Information
Note: Verify that all parts are shipped and undamaged for preparation of assembly. Missing or damaged parts can be ordered prior to assembly to avoid delays during assembly.
Item | Part Number | Part Description | Qty | Specification | Approximate Weight | |
507-1580 Body and Canopy As, 149-3117 Cylinder Mounting Gp 351-4555 Truck Body Mounting Gp 449-2612 Film Gp (US) or 449-2613 Film Gp, 351-6650 Automatic Lubrication Gp | ||||||
1 | 507-1600 | Body and Canopy As | 1 | with the liners and without the liners |
||
2 | 328-2251 | Pin | 2 | Lubricate with LoctiteGraphite-50. Loctite C5ACopper Anti-Sieze, or LoctiteNickel Anti-Sieze | |
|
3 | 270-6871 | O-Ring Seal | 4 | |||
4 | 328-2253 | Plate | 4 | |||
5 | 8T-4223 | Hard Washer | 32 | |||
6 | 160-8748 | Bolt | 32 | |||
6A | 148-8389 | Elbow As | 4 | |||
7 | 295-4144 | Pin As | 2 | Lubricate with LoctiteGraphite-50. Loctite C5ACopper Anti-Sieze, or LoctiteNickel Anti-Sieze | |
|
8 | 295-6881 | Plate | 2 | |||
9 | 151-0888 | Spacer | 4 | |||
10 | 8T-4193 | Bolt | 16 | |||
11 | - | - | - | |||
12 | 480-8667 | Mud Flap | 1 | |||
13 | - | - | - | |||
14 | 5T-7352 | Strip | 1 | |||
15 | 8T-4121 | Hard Washer | 96 | |||
16 | 8T-4196 | Bolt | 24 | |||
17 | 8T-4133 | Nut | 24 | |||
18 | 371-6295 | Plate | 2 | |
||
19 | 219-5894 | Pin Kit | 2 | |||
20 | 371-6297 | Cable As | 1 | |
||
21 | 195-1764 | Pin Kit | 2 | |||
22 | 219-5893 | Clevis | 2 | |||
23 | 219-6071 | Pin Kit | 2 | |||
24 | 371-6296 | Cable As | 2 | |
||
25 | 195-5952 | Plate As | 2 | |
||
26 | 175-4935 | Ejector | 2 | |
||
27 | 3B-4647 | Cotter Pin | 4 | |||
28 | 185-6715 | Pin | 2 | |||
29 | 3D-0404 | Washer | 2 | |||
30 | 149-4621 | Guide | 2 | |
||
31 | 7D-1649 | Hard Washer | 6 | |||
32 | 8T-4184 | Bolt | 6 | |||
33 | 147-5075 | Pad As | 2 | |||
34 | 147-5073 | Shim | 74 | |
||
35 | 147-5072 | Plate | 2 | |
||
36 | 507-1577 | Shoe | 2 | |||
37 | 8t-4192 | Bolt | 8 | |||
38 | 149-1926 | Plate | 4 | |||
39 | 518-9364 | Pin | 2 | Lubricate with LoctiteGraphite-50. Loctite C5ACopper Anti-Sieze, or LoctiteNickel Anti-Sieze | ||
40 | 236-5558 | Plate As | 2 | |||
41 | 8T-4244 | Nut | 30 | |||
42 | 173-5403 | Pad As | 2 | |||
43 | 7D-1649 | Hard Washer | 30 | |||
44 | 8T-4910 | Bolt | 6 | |||
45 | 295-0537 | Film | 1 | |||
46 | 332-5861 | Film | 1 | |||
47 | 332-5860 | Film | 1 | |||
48 | 252-2156 | Film | 8 | |||
49 | - | - | - | |||
50 | - | - | - | |||
51 | - | - | - | |||
52 | - | - | - | |||
53 | - | - | - | |||
54 | - | - | - | |||
55 | - | - | - | |||
56 | - | - | - | |||
57 | 148-8389 | Elbow As | 2 | |||
58 | 4K-8864 | Clip | 12 | |||
59 | 8T-4137 | Bolt | 12 | |||
60 | 350-1645 | Bracket As | 1 | |
||
61 | 004-6683 | Fitting | 2 | |||
62 | 269-5346 | Grease Injector As | 2 | |||
63 | 8T-6869 | Bolt | 2 | |||
64 | 8T-4224 | Hard Washer | 2 | |||
65 | 5P-4116 | Hard Washer | 2 | |||
66 | 5C-7261 | Nut | 2 | |||
67 | 148-8389 | Elbow As | 4 | |||
67A | 148-9947 | Hose As | 2 | |||
67B | 350-3509 | Hose As | 2 | |||
67C | 4D-6466 | Clip | 6 | |||
67D | 4K-8864 | Clip | 2 |
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 376-4554 | Pin As | 4 |
B | - | Lubricate with LoctiteGraphite-50. Loctite C5ACopper Anti-Sieze, or LoctiteNickel Anti-Sieze | - |
Start By:
- Install the rear tires and rims
Note: Before installing the truck body and canopy, remove the work at height handrails.
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, PERJ1017, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
Observe the safe working load limits of all lifting and blocking devices and keep a safe distance from suspended/blocked loads. Personnel may be seriously injured or killed by falling loads. |
Personal injury or death can occur from heavy components falling during removal or installation. Properly support the component with a suitable lifting device during removal or installation. |
Personal injury or death can result from improper lifting or blocking. When a hoist or jack is used to lift any part or component, stand clear of the area. Be sure the hoist or jack has the correct capacity to lift a component. Install blocks or stands before performance of any work under a heavy component. Approximate weights of the components are shown. Clean all surfaces where parts are to be installed. |
Do not attempt to assemble this machine until you read and you understand the assembly instructions. Improper assembly procedures could result in injury or death. |
Climbing equipment may be required to access this service point. Refer to the Operation and Maintenance Manual, "Mounting and Dismounting" topic for safety information.
Note: Remove all protective shipping covers, flanges, plugs, caps, clamps, cable straps, and material.
Note: Clean mounting and contact surfaces for major component installation free of wax, dirt, debris, paint, and grease.
Note: If necessary, chase unprotected threaded holes with an appropriately sized tap to remove paint, rust, or other debris.
Note: Unless otherwise specified, all torque requirements are Standard Torque values. Refer to the "General Information" section in this document for the correct torque values.
Note: Before tightening the cable straps (mounting hardware), remove the slack from the harness assemblies and allow adequate strain relief.
Note: Any tooling that is used for lifting the machine or for securing the machine in the raised position should be used on a concrete surface capable of supporting the weight of the machine.
Weld Specifications | |||
Weld | Type | Size | Penetration |
W1 | Fillet | |
|
W2 | Fillet | |
|
W3 | Fillet | |
|
Bevel Groove | |
||
W4 | Fillet | |
|
Bevel Groove | |
||
W5 | Fillet | |
|
W6 | Fillet | |
|
Bevel Groove | |
||
W7 | Bevel Groove | |
|
W8 | Fillet | |
Reference: Special Instruction, REHS1841, "General Welding Procedures".
Note: Note: Clean all surfaces with isopropyl alcohol. Thoroughly dry the surfaces before applying the film.
Note: After applying the film, ensure that the film is free of air bubbles.
Note: If no dimension is given, center the films in the space that is available.
- Clean the contact surface with isopropyl alcohol. Thoroughly dry the surface before applying the film. Apply film (45) to the front of the canopy.
Show/hide table
Illustration 2 g03881774 (46) 332-5861 Film
(A)0 ± 3 mm (0.00000 ± 0.12 inch) - Clean the contact surface with isopropyl alcohol. Thoroughly dry the surface before applying the film. Apply film (46) to the right side of the body.
Show/hide table
Illustration 3 g03881775 (47) 332-5860 Film
(A)0 ± 3 mm (0.00000 ± 0.12 inch) - Clean the contact surface with isopropyl alcohol. Thoroughly dry the surface before applying the film. Apply film (47) to the left side of the body.
Show/hide table
Illustration 4 g03881776 (48) 252-2156 Film - Clean the surfaces with isopropyl alcohol. Thoroughly dry the surfaces before applying the film. Apply films (48) to the sides of the body. Place eight films (48) to the right of each lifting location.
Illustration 1 | g03881773 |
(45) 295-0537 Film |
- Clean the pin bores and the mating surfaces on the truck body free of wax, dirt, debris, paint, and grease.
Show/hide table
Illustration 6 g03859400 - Clean the pin bores and the mating surfaces on the chassis and hoist cylinders free of wax, dirt, debris, paint, and grease.
Show/hide table
Illustration 7 g03881777 Show/hide tableIllustration 8 g03860102 (2) 328-2251 Pin As
(7) 295-4144 Pin As - Clean the contact and mating surfaces of two pin assemblies (2) and two pin assemblies (7) free of wax, dirt, debris, paint, and grease.
Show/hide table
Illustration 9 g03860461 (1) 290-6420 Body and Canopy As - Use Tooling (A) and a suitable lifting device to position truck body and canopy assembly (1) onto the chassis. The weight of truck body and canopy assembly (1) is approximately
51256 kg (113000 lb) with the liners and44134 kg (97300 lb) without the liners.Show/hide tableIllustration 10 g03881780 Show/hide tableIllustration 11 g03881781 (2) 328-2251 Pin As
(2A) 154-1808 PlateNote: Center the truck body on the chassis by installing shim plates (2A) , as required, on the body pivot pins between the body frame rails and the outside surface of the chassis frame rails only. Do not install the shim plates on the inboard sides of the chassis frame rails.
- Ensure that the pin bores are aligned. Apply Tooling (B) onto pivot pin assembly (2). Use a suitable lifting device to position one pivot pin assembly (2) into the pin bore. The weight of one pivot pin assembly (2) is approximately
60 kg (132 lb) . Position the required number of shim plates (2A) to center the truck body on the chassis and install one pivot pin assembly (2). Repeat this step for the opposite side of the truck body.Show/hide tableIllustration 12 g03881783 (4) 328-2253 Plate
(6A) 148-8389 Elbow As - Install one elbow assembly (6A) onto one retainer plate (4). Repeat this step for the three remaining retainer plates (4).
Show/hide table
Illustration 13 g03881782 Show/hide tableIllustration 14 g03881784 (4) 328-2253 Plate
(5) 8T-4223 Hard Washer
(6) 160-8748 Bolt - install two O-ring seals (3), two retainer plates (4), sixteen hard washers (5), and sixteen bolts (6). Repeat this step for the remaining pin assembly on the opposite side of the truck body.
- Repeat Step 6 through Step 7 for the opposite side of the truck body.
Show/hide table
Illustration 15 g03861510 Show/hide tableIllustration 16 g03861521 (7) 295-4144 Pin As
(9) 151-0888 Spacer - Position the hoist cylinder to align the pin bores. Apply Tooling (B) onto pin assembly (7). Install pin assembly (7) and two spacers (9). The weight of one pin assembly (7) is approximately
47 kg (104 lb) Show/hide tableIllustration 17 g03860618 (5) 9X-8257 Washer
(8) 295-6881 Plate
(10) 8T-4193 Bolt - Install two plates (8), eight hard washers (5), and eight bolts (10). Repeat Step 9 and Step 10 for the hoist cylinder pin assembly on the opposite side of the truck body.
Illustration 5 | g03859399 |
Note: The mud guards can be installed at ground level.
- Use two people to position mud flap (12). The weight of mud flap (12) is approximately
22 kg (49 lb) . Install strip (14), twelve bolts (16), twenty-four washers (15), and twelve nuts (17).
Illustration 18 | g06358349 |
(12) 480-8667 Mud Flap
(14) 5T-7352 Strip (15) 8T-4121 Hard Washer (16) 8T-4196 Bolt (17) 6V-7744 Nut |
Note: The retaining cables can be installed at ground level.
- Use a suitable lifting device to install two plates (18). The weight of one plate (18) is approximately
43 kg (95 lb) . Install two pin kits (21).Show/hide tableIllustration 20 g03881786 (19) 219-5894 Pin Kit
(20) 371-6297 Cable As - Install one cable assembly (20) and two pin kits (19).
Show/hide table
Illustration 21 g03881787 (22) 219-5893 Clevis
(23) 219-6071 Pin Kit
(24) 371-6296 Cable As - Install two cable assemblies (24), two clevises (22), and two pin kits (23).
Illustration 19 | g03881785 |
(18) 371-6295 Plate
(21) 195-1764 Pin Kit |
- Attach a string and a plumb bob to the center of one plate assembly (21) for the mounting pin of rock ejector. Use a suitable fork truck to position one plate assembly (25) onto the bottom of the truck body. The weight of one plate assembly (25) is approximately
103 kg (227 lb) . Center the string between the two rear tires. Once the string is centered, mark the location of plate assembly (25) on the truck body.Show/hide tableIllustration 23 g03862366 Show/hide tableIllustration 24 g03881789 (25) 195-5952 Plate As - Clean the contact and mating surfaces of plate assembly (25) and the truck body free of wax, dirt, debris, paint, and grease.
Show/hide table
Illustration 25 g03881788 Show/hide tableIllustration 26 g03881790 (25) 195-5952 Plate As
(W1)8 mm (0.32 inch) Fillet weld with1.5 mm (0.06 inch) Root penetration - Position plate assembly (25) onto the bottom of the body and tack weld plate assembly (25) onto the truck body. The weight of one plate assembly (25) is approximately
103 kg (227 lb) . - Weld plate assembly (25). Weld around the entire perimeter of plate assembly (25) in order to secure plate assembly (25) to the truck body. Use a grinder in order to remove any slag or debris from the affected area. Repaint the welded area.
Show/hide table
Illustration 27 g03881791 Show/hide tableIllustration 28 g03881792 (25) 195-5952 Plate As
(26) 175-4935 Ejector
(27) 3B-4647 Cotter Pin
(28) 185-6715 Pin
(29) 3D-0404 Washer - Use a suitable fork lift or a suitable lifting device to position ejector (26) to plate assembly (25). The weight of ejector (26) is approximately
112 kg (247 lb) . - Install one pin (28), one washer (29), and two cotter pins (27).
- 1 and Step 6 for the opposite side of the truck body.
Illustration 22 | g03881788 |
(25) 195-5952 Plate As |
- Install plate assembly (36) onto plate assembly (40). Apply Tooling (B) onto pin (39). Install pin (39), two plates (38), and four bolts (37).
Show/hide table
Illustration 30 g03881794 (31) 7D-1649 Hard Washer
(32) 8T-4184 Bolt
(33) 147-5075 Pad As
(34) 147-5073 Shim2 mm (0.08 inch)
(35) 147-5072 Plate8 mm (0.32 inch)
(68) Rocker Sub Assembly - Install two shims (34) and one plate (35) onto rocker subassembly (68). Install one pad assembly (33), three hard washers (31), and three bolts (32).
Note: Plate (35) should be used in place of four shims (34). Use plate (35) when the gap between the truck body and pad assembly (33) is larger than
8 mm (0.32 inch) . - Repeat Step 1 through Step 2 for the remaining rocker assembly.
- Raise the truck body and connect the truck body retaining cables. Refer to Operation and Maintenance Manual, "Cable (Truck Body Retaining)".
Show/hide table
Illustration 31 g03881795 Show/hide tableIllustration 32 g03881796 (68) Rocker Sub Assembly - Use a suitable lifting device to position one rocker subassembly (68) onto the crossbeam of the truck frame. The weight of rocker assembly (68) is approximately
150 kg (330 lb) .Show/hide tableIllustration 33 g03881797 (68) Rocker Sub Assembly
(A)1550 mm (61 inch) - Disconnect the truck body retaining cables and Lower the body. Refer to Operation and Maintenance Manual, "Cable (Truck Body Retaining)".
- Locate rocker subassembly (68) on the crossbeam according to Dimension (A) from the centerline of the chassis. Also, position rocker subassembly (68) as far rearward on the crossbeam as possible without welding on the radius of the crossbeam.
Note: Dimension (A) from the centerline of the chassis to the center of the rocker assembly pin is
1550 mm (61 inch) - Tack weld rocker subassembly (68) onto the crossbeam of the truck frame.
- Repeat Step 5 through Step 8 for the remaining rocker subassembly.
- Raise the truck body and connect the truck body retaining cables. Refer to Operation and Maintenance Manual, "Cable (Truck Body Retaining)".
Show/hide table
Illustration 34 g03881798 Show/hide tableIllustration 35 g03881799 Grind as needed for clearance
(68) Rocker Sub Assembly
(W2)25 mm (1.0 inch) Fillet weld with1.5 mm (0.06 inch) Root penetration
(W3)10 x 35 mm (0.4 x 1.4 inch) Fillet weld with14 mm (0.6 inch) Bevel Groove weld
(W4)10 x 27 mm (0.4 x 1.1 inch) Fillet weld with14 mm (0.6 inch) Bevel Groove weld
(N1) Grind both corners
(N2) No weld from A to B - Weld rocker subassembly (68) to the crossbeam.
Note: Avoid starting and stopping the weld on the corners.
Show/hide tableIllustration 36 g01652994 Show/hide tableIllustration 37 g01652998 - Create additional fillet welds in order to provide a tapered transition between the original fillet weld and the main beam. Use a grinder in order to blend the additional welding area.
Note: Perform the additional welding on the two corners of the rocker assembly that are located toward the outside edge of the chassis.
Show/hide tableIllustration 38 g03881800 (68) Rocker Sub Assembly - Use a grinder to blend any weld that is located by the drain opening in rocker assembly (68).
Note: Ensure that the drain opening is free of obstructions.
Show/hide tableIllustration 39 g01653036 - Check for interference after finish welding and grinding of rocker subassemblies (68). Ensure that there is no interference between the upper rocker pad and the fillet weld on the base. If interference occurs, use a grinder to remove the excess material. Paint all affected weld areas.
- Repeat Step 5 through Step 14 for the opposite side.
Illustration 29 | g03881793 |
(36) 507-1577 Shoe
(37) 8T-4192 Bolt (38) 149-1926 Plate (39) 518-9364 Pin (40) 236-5558 Plate As |
- Raise the truck body to the RAISED position and connect the truck body retaining cables. Refer to Operation and Maintenance Manual, "Cable (Truck Body Retaining)".
- Loosely install all ten pad assemblies (42) using 30 bolts (44), 30 hard washers (43), and 30 nuts (41) to the body rails (no shims, and bolts loose).
- Lower the body slowly until the first pad assembly fully contacts the rails. This pad assembly establishes neutral body down position and requires no additional shims.
Note: Raise the truck body and connect the truck body retaining cables. Refer to Operation and Maintenance Manual, "Cable (Truck Body Retaining)". Or, safely block the body in position while the shims are installed.
- As required, assemble shims (34) on the remaining pad assemblies (42) to minimize the gap between the frame rail and the body rail and maximize the contact area of pad assemblies. Use the shims to fill the gaps.
Note: When lowering the body to establish the neutral down position, if the body landing pads contact the rocker assemblies before the body pads contact the frame rails, then add required shims to the body pad with closest clearance to minimize the gap. With this neutral position established, continue to add shims to the remaining body rail mounting pads.
- Remove the safety device or blocks and lower the body to the DOWN position to visually check for proper shimming along the frame rails.
Note: Check for even contact of mounting pads to frame rails, the following paint/grease transfer procedure can be used. Paint/grease the chassis frame rail body pad contact areas. While the paint/grease is wet, lower the body. Raise the body and examine the contact pattern transferred to the body pads. If needed, reshim the pads one pad at a time to achieve the most complete contact pattern possible.
- Refer to the rocker Install section for welding rocker assemblies to position.
- With the body in the DOWN position, finish shim the rocker assemblies.
- Install one
8 mm (0.32 inch) shim and two2 mm (0.08 inch) shims between pad and rocker, tighten the bolts ( this will give field adjustment for pedestals as the body pads compress during operation). - Place two
2 mm (0.08 inch) shims on top of the rocker pads ( this will establish initial running clearance). - Remove safety device or blocks. Raise and lower the body in order to ensure proper alignment and that all mounted pad assemblies have even contact with the frame.
- At this point, remove the two shims setting on top of rocker pads from the right hand and left-hand rocker shoe and pad assemblies. Removing the shim ensure minimal load transferring to the front tower landing pads after the truck is in service.
- Evenly tighten the rocker mounting pad assembly bolts to a torque of
100 ± 20 N·m (74 ± 15 lb ft) . - Evenly tighten the truck body pad assembly bolts to a torque of
105 ± 20 N·m (77 ± 15 lb ft) . - Ensure that there is adequate clearance to the cab.
- Inspect pad wear (footprint of pads on the frame rails) at first periodical maintenance, and reshim if required.
Note: Verify the body frame rail to body pad contact patterns using the paint/grease transfer method at the first scheduled service interval after the truck has been in service. Reshim pads one pad at a time as needed to achieve the most complete contact pattern possible.
Illustration 40 | g03891867 |
(34) 147-5073 Shim (41) 8T-4244 Nut (42) 173-5403 Pad As (43) 7D-1649 Hard Washer (44) 8T-4910 Bolt |
Note: Do not install the truck body guides until the body pads have been installed.
- Weld guide (30) to the crossbeam. The weight of one guide (30) is approximately
21 kg (47 lb) . - Repeat Step 1 for the remaining guide on the opposite side.
Illustration 41 | g03881803 |
Illustration 42 | g03881804 |
(30) 149-4621 Guide
(B) (C) |
Illustration 43 | g03881805 |
Illustration 44 | g03881806 |
(30) 149-4621 Guide
(W5) (W6) (W7) |
- Remove one bolt (69), two washers (70), and one nut (71) from linkage (72). Retain the hardware.
- Position linkage (72) and install one washer (70) and one bolt (69).
- The body position linkage is calibrated during the commissioning of the truck. Refer to Special Instruction, REHS6122, "Commissioning Procedure for the 797F and the 797F XQ Off-Highway Truck" after the truck has been assembled.
Illustration 45 | g03881807 |
Illustration 46 | g03881808 |
(69) 8T-4195 Bolt
(70) 8T-4121 Hard Washer (71) 344-5675 Nut (72) 158-0488 Rod As |
Install the 351-6650 Automatic Lubrication Gp
- Remove four bolts (73), four washers (74), four washers (75), and four nuts (76) to disconnect grease injector assembly (77) from the mounting bracket, as a unit.
Show/hide table
Illustration 48 g03884642 Show/hide tableIllustration 49 g03884644 (61) 004-6683 Fitting
(77) 269-5346 Lubrication Distribution Valve Gp
(78) 3J-5390 Plug
(79) 203-2059 Connector As - Remove one plug assembly (78) from the right-hand side of grease injector assembly (77). Install one fitting assembly (61).
- Disconnect fitting assembly (79) from the left-hand side of grease injector assembly (77). Install one fitting assembly (61).
Note: Fitting (79) is the supply line connector.
Show/hide tableIllustration 50 g03884643 (62) 269-5346 Lubrication Distribution Valve Gp
(67) 148-8389 Elbow As - Install four elbow assemblies (67) onto two grease injector assemblies (62).
Show/hide table
Illustration 51 g03884659 (62) 269-5346 Lubrication Distribution Valve Gp
(77) 269-5346 Lubrication Distribution Valve Gp - Install two grease injector assemblies (62) onto grease injector assembly (77).
Show/hide table
Illustration 52 g03884660 (62) 269-5346 Lubrication Distribution Valve Gp
(77) 269-5346 Lubrication Distribution Valve Gp
(78) 3J-5390 Plug
(79) 203-2059 Connector As - Connect fitting (79) to the outer grease injector assembly (62) on the left-hand side of grease injector assembly (77). Install one plug assembly (78) to the outer grease injector assembly (62) on the right-hand side of grease injector assembly (77).
Note: Fitting (79) is the supply line connector.
Show/hide tableIllustration 53 g03884661 (63) 8T-6869 Bolt
(64) 8T-4224 Hard Washer
(65) 5P-4116 Hard Washer
(66) 5C-7261 Nut
(73) 8T-6869 Bolt
(74) 8T-4224 Hard Washer
(75) 5P-4116 Hard Washer
(76) 5C-7261 Nut
(77) 269-5346 Lubrication Distribution Valve Gp - Position grease injector assembly (77) onto the mounting bracket as a unit and install four bolts (73), four washers (74), four washers (75), and four nuts (76). Installinstall two bolts (63), two washers (64), two washers (65), and two nuts (66).
Note: The washers (65) and washers (75) are on the back side of the mounting bracket.
Show/hide tableIllustration 54 g03884583 (67) 148-8389 Elbow As
(67A) 148-9947 Hose As
(67B) 350-3509 Hose As
(67C) 4D-6466 Clip
(80) 8T-4133 Nut
(81) 8T-4121 Hard Washer - Install one hose assembly (67A) and one hose assembly (67B) onto four elbow assemblies (67).
- Remove two nuts (80), and two washers (81). Retain the hardware.
- Install two clips (67C), two washers (81) and two nuts (80).
Show/hide table
Illustration 55 g03884639 (67A) 148-9947 Hose As
(67B) 350-3509 Hose As
(67C) 4D-6466 Clip
(67D) 4K-8864 Clip
(80) 8T-4133 Nut
(81) 8T-4121 Hard Washer - Remove two nuts (80), and two washers (81). Retain the hardware.
- Route one hose assembly (67A) to the inside pin retainer plate. Route one hose assembly (67B) to the outside pin retainer plate. Install one clip (67C), one clip (67D), two washers (81) and two nuts (80).
Illustration 47 | g03884529 |
(73) 8T-6869 Bolt
(74) 8T-4224 Hard Washer (75) 5P-4116 Hard Washer (76) 5C-7261 Nut (77) 269-5346 Lubrication Distribution Valve Gp |
Connect the 351-6650 Automatic Lubrication Gp and 272-3252 Central Lubrication Lines Gp
- Install one elbow assembly (57) onto the hoist cylinder.
Show/hide table
Illustration 57 g03881810 Hoist Cylinder
(82) 216-9206 Plug As
(83) 8X-8474 Hose As - Remove one plug assembly (82) from grease hose assembly (83).
Show/hide table
Illustration 58 g03881811 Hoist Cylinder
(15) 8T-4121 Hard Washer
(58) 4K-8864 Clip
(59) 8T-4137 Bolt
(83) 8X-8474 Hose As - Connect grease hose assembly (83). Install one clip (58), one hard washer (15), and one bolt (59).
Show/hide table
Illustration 59 g03881812 Body Rail
(15) 8T-4121 Hard Washer
(58) 4K-8864 Clip
(59) 8T-4137 Bolt - Install five clips (58), five hard washers (15), and five bolts (59).
Show/hide table
Illustration 60 g03881813 Outside Left Hand Side
(67B) 350-3509 Hose As
(84) 216-9206 Plug As - Remove plug assembly (84) from grease hose assembly (67B).
Show/hide table
Illustration 61 g03881814 Outside Left Hand Side
(67B) 350-3509 Hose As - Connect grease hose assembly (67B) to the elbow on the outer side pivot pin retainer plate.
Show/hide table
Illustration 62 g03884640 Inside Left Hand Side
(67A) 148-9947 Hose As
(84) 216-9206 Plug As - Remove plug assembly (84) from grease hose assembly (67A).
Show/hide table
Illustration 63 g03884641 Inside Left Hand Side
(67A) 148-9947 Hose As
(84) 216-9206 Plug As - Connect grease hose assembly (67A) to the elbow on the inner side pivot pin retainer plate.
- Repeat Step 1 through Step 4 for the opposite side of the truck body.
Illustration 56 | g03881809 |
Hoist Cylinder (57) 148-8389 Elbow As |
- After the truck has been fully assembled, commission the truck. Refer to Special Instruction, REHS6122, "Commissioning Procedure for the 797F and the 797F XQ Off-Highway Truck" for the correct procedure.