C18 Marine Engines Caterpillar


Heat Exchanger - Remove and Install - Sea Water

Usage:

C18 DTP

Removal Procedure

  1. Refer to Operation and Maintenance Manual, "Coolant - Change" for the proper draining and filling procedures.


    Illustration 1g03068536

  2. Remove band clamps (3) and band clamps (6).

  3. Disconnect hoses (2) and hose (5).

  4. Remove bolts (4). Use two people to remove heat exchanger (1). The weight of heat exchanger (1) is approximately 24 kg (53 lb).

Installation Procedure

  1. Install heat exchanger (1) in the reverse order of removal.