3608 Engine Caterpillar


Turbocharger - Assemble

Usage:

3608 1ZD

Assembly Procedure For The VTC 254 Turbocharger



Illustration 1g01296512

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
9U-6251  Suspension Yoke(1) 
126-8290  Spanner Wrench(2) 
9U-6248  Guide Bolts(1) 
9U-6243  Extension Handle(3) 
9U-6255  Turbocharger Tool(2) 
503-1854  Hydraulic Puller(2) 
1U-5230  Hand Hydraulic Pump(3) 
8F-0024  Hose Assembly 
9U-6246  Adapter Assembly(3) 
133-8951  Thrust Bearing Screw(3) 
2J-3506  Full Nut 
9U-7262  Plate 
9U-6254  Shaft Assembly 
5P-3931  Anti-Seize Compound 
6V-2055  Grease 
9S-3263  Thread Lock Compound 
2S-3230  Lubricant 
8T-5096  Dial Indicator Test Group 
6V-2012  Depth Micrometer 
(1) This component is a part of the 9U-5105 Basic Engine Tool Group.
(2) This component is a part of the 9U-6249 Cylinder Tool Group.
(3) This component is a part of the 9U-6250 Hydraulic Pump.

Note: Use 8T-0447 Dial Calipers to measure the dimensions in the following procedure.


    NOTICE

    Keep all parts clean from contaminants.

    Contaminants may cause rapid wear and shortened component life.



    NOTICE

    Clean each part with clean solvent. Handle each part carefully in order to prevent damage to the parts. Dry the parts with compressed air.


    Note: Refer to Disassembly and Assembly, "General Information (Reference Material)" for more information. Refer to page 7 for torque values.



    Illustration 2g01294626

  1. Position the cap, nozzle (34), and ring cover (32) on gas inlet housing (30). Apply Tooling (U) onto the bolts and the locking plates that hold the nozzle insert and the cover in position. Use new locking plates for replacement. Do not use the old locking plates.


    Illustration 3g01294696

  2. Attach a suitable lifting device to gas inlet housing (30). The weight of gas inlet housing (30) is approximately 41 kg (90 lb). Install gas inlet housing (30) in the original location on the bearing housing.


    Illustration 4g01294702

  3. Apply Tooling (U) onto the bolts. Install segments (28) to hold gas inlet housing (30) in place. Tighten the bolts to a torque of 58 ± 12 N·m (43 ± 9 lb ft).


    Illustration 5g01294718

  4. Install the insert and diffuser (27) into compressor housing (4). Install diffuser (27) in the original position in compressor housing (4). Tighten the bolts to a torque of 17 ± 3 N·m (13 ± 2 lb ft).


    Illustration 6g01294767

  5. Install cap (26) on the bearing housing.


    Illustration 7g01294795

  6. Assemble turbine bearing assembly (23) in the reverse order of the disassembly. Use a new bushing. Put turbine bearing assembly (23) in position in the bearing housing and install the socket head bolts to hold turbine bearing assembly (23).


    Illustration 8g01294874

  7. Install a new O-ring seal (36) on cover assembly (21). Apply clean engine oil to the O-ring seal. Align the bolt holes in cover assembly (21) with the threaded holes in the bearing housing. Install cover assembly (21).


    Illustration 9g01294888

  8. Apply Tooling (U) onto the bolts. Install cover (19) in position and install the bolts and locking plates that hold cover (19) in place.


    Illustration 10g01294898

  9. Bend locking plates (37) over the bolts.


    Illustration 11g01294959

  10. Apply Tooling (V) in the seal groove. Install a new piston ring seal (18) on shaft assembly (38).

  11. Apply clean engine oil to the turbine end bearing surface of shaft assembly (38).

  12. Carefully install shaft assembly (38) through the turbine bearing assembly.

  13. Do not damage piston ring seal (18) during installation of the end cover. Ensure that piston ring seal (18) is in the center of the groove before piston ring seal (18) is installed into the end cover.


    Illustration 12g01294974


    Illustration 13g01294994

  14. Turn thrust bearing (16) into Tooling (P).

  15. Put thrust bearing (16) and Tooling (P) onto shaft assembly (38) (if equipped). Be sure that the dowels and the notches engage together.

  16. Install Tooling (Q) into shaft assembly (38).

  17. Hold Tooling (P) with Tooling (B) and Tooling (D). Turn Tooling (Q) with a wrench in a counterclockwise direction to install thrust bearing (16).

  18. Install a new thrust bearing (16) onto shaft assembly (38). Take measurements at four locations that are spaced 90 degrees from each other. Ensure that Dimension (X) is 143.00 mm to 143.03 mm (5.630 inch to 5.631 inch).


    Illustration 14g01295012

  19. Apply clean engine oil to the end of the bearing surface that is toward the impeller assembly of shaft assembly (38).


    NOTICE

    Replace the bushing in the compressor bearing assembly with a new part. Apply a light coat of clean engine oil to the bushing.


  20. Assemble compressor bearing assembly (13) in the reverse order of the disassembly. Use a new bushing. Align the oil passage in compressor bearing assembly (13) with the oil passage in the bearing housing and install compressor bearing assembly (13). Use one of the socket head bolts as a guide. Apply Tooling (W) on the bolts.


    Illustration 15g01295502

  21. Install a new O-ring seal (39) on cover (19). Apply clean engine oil to O-ring seal (39).

  22. Align the bolt holes in cover (19) with the bolt holes that are in the compressor bearing assembly. Install cover (19) into the bearing housing.


    Illustration 16g01295558

  23. Apply Tooling (X) in the seal groove in impeller assembly (6) and on piston ring seal (10).


    NOTICE

    The turbine shaft must be clean and dry. Do not use grease, oil or any other lubricant on the turbine shaft.


  24. Carefully put the compressor bearing assembly onto the turbine shaft.


    Illustration 17g01296085

  25. While impeller assembly (6) is being held with Tooling (B), use an extension to tighten Tooling (F) into impeller assembly (6).


    Illustration 18g01296104

  26. Use a 1/4 inch drive extension and a ratchet to install Tooling (T). Install Tooling (H), Tooling (S), and Tooling (R).


    Illustration 19g01296181

  27. Connect Tooling (M) and Tooling (N). Apply pressure with Tooling (M) to install impeller assembly (6) onto the shaft assembly.


    Illustration 20g01296204

  28. When movement stops, install Tooling (H) and Tooling (Y) to check the end clearance. The correct end clearance must be 0.10 to 0.20 mm (0.004 to 0.008 inch).

  29. Remove Tooling (H) and Tooling (Y).


    Illustration 21g01296217

  30. Use Tooling (Z) to measure the dimension from the outside edge of the impeller assembly to the step surface that is inside the impeller assembly. The dimension must be measured at four locations and the measurements must be equal.


    Illustration 22g01296225


    Illustration 23g01296267

  31. Install screw (9) and the disc spring (washer). Install the washer with the concave face away from the screw head.

  32. Use Tooling (B) and Tooling (D) to hold the impeller assembly and tighten screw (9) to a torque of 48 ± 12 N·m (35 ± 9 lb ft).


    Illustration 24g01296292

  33. Install Tooling (C) at three equally spaced locations into the gas outlet housing.


    NOTICE

    Keep the bearing housing in a vertical position so the turbine blades do not contact the insert (see photo inset).


  34. Remove Tooling (C) and install the bolts.


    Illustration 25g01296365

  35. Attach Tooling (A) and a suitable lifting device to compressor housing (4). The weight of compressor housing (4) is approximately 95 kg (209 lb). Be sure that Tooling (A) is engaged with the rib.

  36. Install Tooling (C) at three equally spaced locations in compressor housing (4).

  37. Install a new O-ring seal (40) on the bearing housing. Apply clean engine oil to O-ring seal (40).

  38. Carefully install compressor housing (4) onto the bearing housing in the original position.

  39. Remove Tooling (C) and install the bolts and washers.

  40. Tighten the outer bolts to a torque of 58 ± 12 N·m (43 ± 9 lb ft).

  41. Tighten the inner bolts to a torque of 28 ± 7 N·m (21 ± 5 lb ft).

  42. Remove Tooling (A).


    Illustration 26g01296367

  43. Install elbow (1) and bolts (2).

  44. Install protective covers over all the turbocharger openings to protect the turbocharger before installation.

  45. The turbocharger must be filled with oil prior to operation on the engine. After installation of the turbocharger on the engine, fill the turbocharger with clean engine oil at the oil supply port. Connect the oil supply line after filling.

End By:

  1. Install the turbocharger. Refer to Disassembly and Assembly, "Turbocharger - Install".
Back to top