Crankshaft Rear Seal - Remove
拆卸步骤
Show/hide table
所需工具     | |||
工具     | 零件号     | 零件描述     | 数量     |
A     | 1U-8145     | 钻头     | 1     |
B     | 1U-7600     | 滑锤拉拔器总成     | 1     |
C     | 4C-4869     | 拆卸器环     | 1     |
D     | 5P-7312     | 油封拆卸器     | 1     |
开始:
- 拆下飞轮。 参考拆解和组装, "飞轮 - 拆卸和安装"。
Show/hide table
注意 |
---|
保持所有零件清洁无杂质。 杂质会造成快速磨损和缩短部件寿命。 |
- 利用工具 (A) 在曲轴后密封内钻出 3 个均匀分布的小孔。
- 通过交替改变工具 (B) 在小孔中的位置认真拆下曲轴后密封 (1) 。 这样可以均匀地拆下曲轴后密封 (1) ,而不会损伤曲轴的后法兰面。
Show/hide table
图 1 | g00989088 |
- 利用工具 (C) 和工具 (D) 拆下耐磨套(如果配备)。
注: 新出厂的发动机没有耐磨套。 更换过密封的发动机将配有耐磨套。
Caterpillar Information System:
C175-16 and C175-20 Generator Set Engines Fuel Filter (Primary)
C7 Industrial Engines Housing (Front) - Install
C7 Industrial Engines Pistons and Connecting Rods - Install
C7 Industrial Engines Camshaft Bearings - Remove
C7 On-Highway Engine Vibration Damper and Pulley - Remove and Install
C7 On-Highway Engine Water Pump - Install
C7 On-Highway Engine Water Pump - Remove
C7 PETROLEUM Petroleum Engine Unit Injector Hydraulic Pump - Install
C175-16 Locomotive Engine Engine Design
C7 PETROLEUM Petroleum Engine Unit Injector Hydraulic Pump - Remove
TH31-C9I, TH31-C9P, TH31-C9T, TH35-C11I, TH35-C13I, TH35-C13T, TH35-C15I and TH35-C15T Petroleum Power Train Packages and TH31-E61 and TH35-E81 Petroleum Transmissions Power Train Electronic Control System Programmable Parameters
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies DC Bus Voltage - Calibrate
C7 PETROLEUM Petroleum Engine Electronic Unit Injector Sleeve - Remove
C7 PETROLEUM Petroleum Engine Electronic Unit Injector Sleeve - Install
C7 PETROLEUM Petroleum Engine Engine Oil Pump - Disassemble
C7 Industrial Engines Engine Oil Pump - Assemble
C7 On-Highway Engine Front Cover - Remove
C7 On-Highway Engine Front Cover - Install
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies AC Voltage - Calibrate
C7 On-Highway Engine Housing (Front) - Remove
C175 Generator Sets Walk-Around Inspection
C175-16 and C175-20 Generator Set Engines Fuel Transfer Pump
C7 On-Highway Engine Housing (Front) - Install
SR5 Electric Power Generation Rotor - Remove and Install