Front Cover - Remove
Start By:
- Remove the fan drive mounting group. Refer to Disassembly and Assembly, "Fan Drive Mounting Group - Remove and Install".
- Drain the coolant from the cooling system into a suitable container for storage or for disposal. Refer to Operation and Maintenance Manual, "Cooling System Coolant (ELC) - Change".
Show/hide table
Illustration 1 g01263085 - Remove nut (1). Remove clip (2). Remove tube assembly (3).
Show/hide table
Illustration 2 g01263087 - Remove bolts (4). Remove front cover (5) and the gasket.
Show/hide table
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
Caterpillar Information System:
C7 Industrial Engines Engine Oil Pump - Assemble
C7 PETROLEUM Petroleum Engine Engine Oil Pump - Disassemble
C7 PETROLEUM Petroleum Engine Electronic Unit Injector Sleeve - Install
C7 PETROLEUM Petroleum Engine Electronic Unit Injector Sleeve - Remove
C7 PETROLEUM Petroleum Engine Crankshaft Rear Seal - Remove
C175-16 and C175-20 Generator Set Engines Fuel Filter (Primary)
C7 Industrial Engines Housing (Front) - Install
C7 Industrial Engines Pistons and Connecting Rods - Install
C7 Industrial Engines Camshaft Bearings - Remove
C7 On-Highway Engine Vibration Damper and Pulley - Remove and Install
C7 On-Highway Engine Water Pump - Install
C7 On-Highway Engine Water Pump - Remove
C7 On-Highway Engine Front Cover - Install
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies AC Voltage - Calibrate
C7 On-Highway Engine Housing (Front) - Remove
C175 Generator Sets Walk-Around Inspection
C175-16 and C175-20 Generator Set Engines Fuel Transfer Pump
C7 On-Highway Engine Housing (Front) - Install
SR5 Electric Power Generation Rotor - Remove and Install
C7 On-Highway Engine Camshaft Idler Gear - Remove and Install
SR5 Electric Power Generation Generator - Remove
SR5 Electric Power Generation Generator - Install
SR5 Electric Power Generation Generator - Align
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies AC Output Current - Calibrate