3054E Industrial Engine Caterpillar


Idler Gear (Front) - Install

Usage:

3054E 304

Installation Procedure


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


Standard Idler Gear

  1. Clean all of the components and inspect all of the components that were removed in the previous procedure. If necessary, replace any worn component and/or any damaged component.

    Note: Timing pins are used in order to time the engine at top dead center. The timing pins are a slip fit. Do not use excessive force to install the timing pins. Do not use the timing pins to lock the engine during repairs.

  2. Ensure that the No. 1 cylinder is still at the top center position on the compression stroke. If necessary, refer to the Testing and Adjusting Manual, "Finding Top Center Position for No. 1 Piston". Ensure that the timing pin for the crankshaft is installed and that the timing pin for the camshaft is installed.

    Note: Ensure that the marks on the idler gear (1) face toward the front.



    Illustration 1g01141709
    Typical example

  3. Assemble the idler gear. Refer to this Disassembly and Assembly manual, "Idler Gear (Front) - Assemble".


    Illustration 2g01141715
    Typical example


    Illustration 3g01141747
    Typical example

  4. Lift the assembly (3) of the idler gear and the hub over the housing for the crankshaft front seal (4) and insert the hub into the recess (6) in the cylinder block.

    Note: Ensure that the oil hole (2) is to the top of the hub.

    Note: Ensure that the marks (1) on the idler gear assembly (3) align with the marks on the camshaft gear and with the crankshaft gear.



    Illustration 4g01141734
    Typical example

  5. Align the holes in the plate (8) with the holes in the hub. Insert the setscrews (7) through the plate (8) and into the hub.

  6. Evenly tighten the setscrews (7) to a torque of 44 N·m (32 lb ft).

Heavy-Duty Idler Gear

Note: In order to install the heavy-duty idler gear, use the steps (1 to 3) in the procedure to install the standard idler gear.



    Illustration 5g01141682

  1. Lift the assembly (3) of the idler gear and the hub over the housing for the crankshaft front seal (2) and insert the hub into the recess in the cylinder block. Refer to illustration 3.

  2. Ensure that the word "Top" (1) is at the top of the plate.

  3. Align the holes (4) in the assembly to the holes in the cylinder block. Install the three setscrews and tighten the setscrews to a torque of 44 N·m (32 lb ft).

End Play



    Illustration 6g01141765
    Typical example

  1. Check the end play of the idler gear. Refer to illustration 6. Also refer to the Specifications, "Gear Group - Front".

  2. Install the fuel pump gear. Refer to this Disassembly and Assembly Manual, "Fuel Injection Pump - Install".

  3. Ensure that all timing pins are removed.

  4. Check the backlash of the gear train. Refer to Specifications Manual, "Gear Group (Front)" for more information.

End By:

  1. Install the rocker shaft. Refer to this Disassembly and Assembly Manual, "Rocker Shaft and Pushrod - Install".

  2. Install the glow plugs if the glow plugs were previously removed. Refer to this Disassembly and Assembly Manual, "Glow Plugs - remove and Install".

  3. Install the front cover. Refer to this Disassembly and Assembly Manual, "Front Cover - Remove and Install".

Caterpillar Information System:

3054E Industrial Engine Idler Gear (Front) - Assemble
3054E Industrial Engine Idler Gear (Front) - Disassemble
994F Wheel Loader Hydraulic System Electronic Control Module (ECM) - Replace
784C and 785C Off-Highway Truck/Tractors Air Tank - Inspect
C7 and C9 Engines for Caterpillar Built Machines Injection Actuation Pressure Control Valve Circuit - Test
C9 On-highway Engine Exhaust Manifold
C7 and C9 Marine Engines Injection Actuation Pressure Control Valve Circuit - Test
C27 and C32 Generator Set Engines Crankshaft Main Bearings - Install
GENSET, SR4, SR4 HV, SR4B and SR4B HV Electric Power Generation, 3126, 3176B, 3176C, 3196, 3408E, 3412C, 3412E, 3508, 3508B, 3512, 3512B, 3516, 3516B and G3616 Engines, 3406E GEN SET Generator Set, 3406E IND, 3408C IND and 3456 IND Industrial Engines Sea Water Module Interface
C27 and C32 Generator Set Engines Crankshaft Main Bearings - Remove
2005/03/01 New Serial Number Prefix {1000}
C9 Generator Set Engines Turbocharger
C27 and C32 Generator Set Engines Crankshaft - Remove
C9 Engines for Caterpillar Built Machines Unit Injector Hydraulic Pump - Remove
C3.3 and C4.4 Generator Sets Fuel System Secondary Filter - Replace
C27 and C32 Generator Set Engines Crankshaft - Install
C9 Generator Set Engines Engine Oil Pan
C9 Engines for Caterpillar Built Machines Unit Injector Hydraulic Pump - Install
C9 Engines for Caterpillar Built Machines Turbocharger - Remove
D Series Excavator Monitoring System Password Entry
303.5E2 CR, 304E2 CR, 305E2 CR and 305.5E2 CR Mini Hydraulic Excavators Quick Coupler - Lubricate - If Equipped
C9 Engines for Caterpillar Built Machines Turbocharger - Install
2005/03/14 A New Engine Oil is Used for the Factory Fill in Gas Engines {1348}
C27 and C32 Engines for Caterpillar Built Machines Atmospheric Pressure Sensor - Remove and Install
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.