CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Caterpillar


Track Carrier Roller - Assemble

Usage:

OEMS L5E

Assembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
(A)     1P-0510     Driver Group     1    
(B)     9U-5985     Seal Installer     1    
(C)     8T-5096     Dial Indicator     1    

  1. Thoroughly clean all parts of the track carrier roller prior to assembly.

    Note: Do not reuse bearings (12) and (13). Use new parts for replacement.




    Illustration 1g00367312

    Note: Bearing (13) is a straight bearing.

  1. Lower the temperature of bearing (13). Use Tooling (A) and a press to install bearing (13) in the inside bore of the carrier roller. Install the bearing until the bearing is even with the shaft counterbore in the carrier roller.



    Illustration 2g00367133

    Note: Bearing (12) has a flange.

  1. Lower the temperature of bearing (12). Use Tooling (A) and a press to install bearing (12) in the outside bore of the carrier roller. The outside bore can be identified by three threaded holes (H) in the track carrier roller. Install the bearing until the flange on the bearing makes contact with the counterbore in the track carrier roller.



    Illustration 3g00367112

  1. Check the condition of the O-ring seal that is used in collar (11). If the seal is damaged, use a new part for replacement. Install the O-ring seal in the collar. Put clean oil on the O-ring seal.

  1. Use a press to install collar (11) on shaft (8). Install collar (11) until dimension (X) is 129.2 ± 0.2 mm (5.09 ± .01 inch).

  1. Use the following procedure to determine shaft end play.

      Note: Do not install the Duo-Cone seal kits in the track carrier roller or collar (11) at this time.

    1. Install shaft assembly (8) in the track carrier roller without Duo-Cone seal kits.

    1. Install retainer (7) and socket head bolts (5) and (6) on the end of shaft assembly (8) .

    1. Use Tooling (C) to measure the end play of shaft assembly (8). The end play of the shaft assembly must be 0.20 mm (.008 inch) to 0.75 mm (.030 inch). Bearing (12) controls the amount of shaft end play.

    1. Disassemble the track carrier roller, but do not remove collar (11) from shaft (8) .

    Note: Refer to Disassembly and Assembly Manual, "Duo-Cone Conventional Seals - Install" for more information.

    Note: The rubber seal and all surfaces that make contact with the seals must be clean and dry. After installation of the seals, apply clean SAE 30 oil on the contact surfaces of the metal seals.




    Illustration 4g00367057

  1. Install Duo-Cone seal kit (10) in collar (11) with Tooling (B) .



    Illustration 5g00365965

  1. Install Duo-Cone seal kit (9) in the track carrier roller on the side without three threaded holes with Tooling (B) .



    Illustration 6g00365960

  1. Carefully install shaft assembly (8) in the track carrier roller. Install retainer (7) and socket head bolts (5) and (6) .



    Illustration 7g00365954

  1. Check the condition of O-ring seal (4) that is used on cover (3). If the O-ring seal is damaged, use a new part for replacement. Put clean oil on O-ring seal (4). Install the O-ring seal on cover (3) .



    Illustration 8g00365386

  1. Install cover (3) on the track carrier roller and three socket head bolts (1) .

  1. Put the track carrier roller in a vertical position. Fill the track carrier roller with 85 ± 5 mL (2.89 ± .17 oz) of clean SAE 30 oil. Apply 5P-3413 Pipe Sealant on the threads of plug (2). Install plug (2) .

End By: Install the track carrier rollers. Refer to Disassembly and Assembly, "Track Carrier Roller - Install" in this manual.

Caterpillar Information System:

C7 and C9 On-Highway Engines 0186-04 PTO Engine Shutdown Switch voltage low
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Carrier Roller - Disassemble
Power Module Switchgear (Low Voltage and Medium Voltage) General Maintenance Information
3126 Truck Engine Flywheel Housing
Power Module Switchgear (Low Voltage and Medium Voltage) Initial Startup Procedure
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Carrier Roller - Install
2001/11/01 Changes were made in the Communication Link for the Marine Monitoring System II (MMS II) and the Generator Monitoring System (GMS) {7490}
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Carrier Roller - Remove
3126B and 3126E On-highway Engines 0128-04 Secondary Fuel Level voltage low
3126B and 3126E On-highway Engines 0128-03 Secondary Fuel Level voltage high
Power Module Switchgear (Low Voltage and Medium Voltage) Initial Startup Safety Check
Power Module Switchgear (Low Voltage and Medium Voltage) Installation
3126 Truck Engine Engine Oil Pan
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Roller - Remove
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Roller - Disassemble
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Roller - Assemble
3126B and 3126E On-highway Engines 0186-14 PTO Engine Shutdown Switch Occurrence (47)
SCT673 Truck Mounted PumperPOD Hydraulic System Oil Filter - Replace - Gear Case
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Roller - Install
3054 and 3056 Marine Generator Set Engines Alternator and Regulator
3126B and 3126E On-highway Engines 0231-11 J1939 Data Link Fault (58)
G3500B Engines Plate Locations and Film Locations
3054 and 3056 Engines 520 Generator Set Control Panel Control Module - Configure
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track - Separate
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.