Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 4C-6486 | Stand | 2 |
8S-7641 | Tube | 2 | |
8S-8048 | Saddle | 2 | |
8S-7615 | Pin | 2 | |
B | 6V-2074 | Puller Stud | 1 |
- | Fast Runner Nut Assembly (1 1/2 - 12) | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
9U-6751 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
C | 4C-9634 | Puller Stud | 1 |
9U-6832 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Washer | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
1P-1838 | Bearing Puller Adapter | 1 | |
8M-9010 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
D | 4C-9634 | Puller Stud | 1 |
9U-6832 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Washer | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
5P-7399 | Bearing Puller Adapter | 1 | |
8M-9010 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
E | 4C-9634 | Puller Stud | 1 |
9U-6832 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Washer | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
1P-1842 | Bearing Puller Adapter | 1 | |
8M-9010 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
F | 1P-0520 | Driver Group | 1 |
G | 518-0684 | Sleeve | 1 |
5P-4184 | Puller Stud | 1 | |
5P-8623 | Adapter | 1 | |
7H-7539 | Full Nut | 1 | |
9U-6832 | Nut | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 |
Start By:
- Remove the bucket.
- Remove the tilt lever and the tilt link.
- Remove the front fenders.
- Remove the lift position control.
When you are using hydraulic cylinders and puller studs, always ensure that the rated capacity of the puller stud meets or exceeds the rated capacity of the hydraulic cylinder. If the puller stud does not meet or exceed the rated capacity of the hydraulic cylinder, a sudden failure of the puller stud could occur. The sudden failure of the puller stud could result in personal injury or death. |
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, PERJ1017, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
- Attach a suitable lifting device to tilt cylinder (1). The weight of tilt cylinder (1) is approximately
228 kg (503 lb) . Raise tilt cylinder (1) until tilt cylinder (1) is clear of the lift arm. - Use a suitable lifting sling to secure tilt cylinder (1) to the cab as shown in Illustration 1.
- Repeat Step 1 and Step 2 for the other tilt cylinder.
Show/hide table
Illustration 2 g06396437 - Start the machine and raise lift arm (2).
- Place Tooling (A) in position under lift arm (2). Lower lift arm (2) on Tooling (A) as shown in Illustration 2. The weight of lift arm (2) is approximately
2310 kg (5093 lb) - Shut off the Machine. Release the pressure in the hydraulic system. Refer to Disassembly and Assembly, "System Pressure - Release".
Show/hide table
Illustration 3 g06396447 - Disconnect harness assembly (5) and remove the cable straps. Remove bolts (4) and clamps (3). Reposition harness assembly (5) away from the frame assembly.
Show/hide table
Illustration 4 g06396477 - Disconnect hose assemblies (6).
Show/hide table
Illustration 5 g06396478 - Remove cable strap (9) and disconnect hose assembly (7).
- Remove bolt (8) and reposition hose assembly (7) away from the lift arm.
Note: If any of the hose assemblies, the tube assemblies, and the harness assemblies attached to the lift arm could get damage during the removal of the lift arm, then remove the hose assemblies, the tube assemblies, and the harness assemblies from the lift arm.
Show/hide tableIllustration 6 g06396484 Show/hide tableIllustration 7 g06396989 - Place suitable blocks between the frame and lift cylinder rod as shown in the Illustration 6. The weight of the lift cylinder is approximately
260 kg (573 lb) . - Remove bolt (10) and the washer.
- Attach Tooling (G) and a suitable lifting device to remove pin assembly (11). The combined weight of Tooling (G) and pin assembly (11) is approximately
50 kg (110 lb) . Remove pin assembly (11). - Repeat Step 11 through Step 13 for the other side.
Show/hide table
Illustration 8 g06396491 - Disconnect tube assemblies (13) and remove adapter assemblies (12).
Show/hide table
Illustration 9 g06396494 Show/hide tableIllustration 10 g06396508 - Attach a suitable lifting device to lift arm (2). The weight of lift arm (2) is approximately
2310 kg (5093 lb) . - Remove bolt (15) and the washer.
- Attach Tooling (B) and a suitable lifting device to remove pin assembly (14). The combined weight of Tooling (B) and pin assembly (14) is approximately
96 kg (212 lb) . Remove pin assembly (14) and the shims. - Repeat Step 17 and Step 18 for the other side.
- Remove lift arm (2) and place lift arm (2) on suitable blocks or on a suitable work place.
Show/hide table
Illustration 11 g06396525 Show/hide tableIllustration 12 g06396536 - Remove lip seals (16) from the bucket pin bore.
- Use Tooling (C) and a suitable lifting device to remove bearing (17). The weight of Tooling (C) is approximately
33 kg (73 lb) . Remove bearing (17). - Repeat Step 21 and Step 22 for the other side.
Show/hide table
Illustration 13 g06396541 Show/hide tableIllustration 14 g06396543 - Remove lip seals (18) from the lift cylinder pin bore.
- Use Tooling (D) and a suitable lifting device to remove bearing (19). The weight of Tooling (D) is approximately
33 kg (73 lb) . Remove bearing (19). - Repeat Step 24 and Step 25 for the other side.
Show/hide table
Illustration 15 g06396550 Show/hide tableIllustration 16 g06396552 - Remove lip seals (20) from the pivot pin bore.
- Use Tooling (E) and a suitable lifting device to remove bearing (21). The weight of Tooling (E) is approximately
35 kg (77 lb) . Remove bearing (21). - Repeat Step 27 and Step 28 for the other side.
Illustration 1 | g06396435 |
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 4C-6486 | Stand | 2 |
8S-7641 | Tube | 2 | |
8S-8048 | Saddle | 2 | |
8S-7615 | Pin | 2 | |
B | 6V-2074 | Puller Stud | 1 |
- | Fast Runner Nut Assembly (1 1/2 - 12) | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
9U-6751 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
C | 4C-9634 | Puller Stud | 1 |
9U-6832 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Washer | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
1P-1838 | Bearing Puller Adapter | 1 | |
8M-9010 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
D | 4C-9634 | Puller Stud | 1 |
9U-6832 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Washer | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
5P-7399 | Bearing Puller Adapter | 1 | |
8M-9010 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
E | 4C-9634 | Puller Stud | 1 |
9U-6832 | Fast Runner Nut Assembly | 1 | |
4K-0684 | Washer | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
1P-1842 | Bearing Puller Adapter | 1 | |
8M-9010 | Sleeve | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
F | 1P-0520 | Driver Group | 1 |
G | 518-0684 | Sleeve | 1 |
5P-4184 | Puller Stud | 1 | |
5P-8623 | Adapter | 1 | |
7H-7539 | Full Nut | 1 | |
9U-6832 | Nut | 1 | |
6V-3175 | Double Acting Cylinder | 1 | |
350-7768 | Electric Hydraulic Pump Gp (115V) | 1 | |
350-7769 | Electric Hydraulic Pump Gp (230V) | 1 | |
H | - | Multipurpose Grease | - |
J | - | Loctite 648 | - |
K | - | Loctite C5-A(1) | - |
Loctite 8008(2) | |||
L | - | Loctite 536 | - |
(1) | North America |
(2) | Outside North America |
- Use Tooling (E) and a suitable lifting device to install bearing (21). The weight of Tooling (E) is approximately
35 kg (77 lb) . Install bearing (21) in the pivot pin bore. Install bearing (21) to a depth of Dimension (M) below the surface of the lift arm. Repeat for the other side.Note: Make sure that the lubrication holes are aligned during the installation of the bearings.
Show/hide tableIllustration 19 g06396941 Show/hide tableIllustration 20 g06396940 Orientation of lip seal (20). - Apply Tooling (J) to the lip seal bore. Use Tooling (F) to install lip seals (20). Install lip seals (20). Repeat for the other side.
Note: Make sure that the lip of the lip seal is facing outward. The lip seals should not protrude beyond bore face.
Show/hide tableIllustration 21 g06396543 Show/hide tableIllustration 22 g06396910 Dimension (N) is 8.5 ± 1.0 mm (0.33 ± 0.04 inch) - Use Tooling (D) and a suitable lifting device to install bearing (19). The weight of Tooling (D) is approximately
33 kg (73 lb) . Install bearing (19) in the lift cylinder pin bore. Install bearing (21) to a depth of Dimension (N) below the surface of the lift arm. Repeat for the other side.Note: Make sure that the lubrication holes are aligned during the installation of the bearings.
Show/hide tableIllustration 23 g06396939 Show/hide tableIllustration 24 g06396936 Orientation of lip seal (18). - Apply Tooling (J) to the lip seal bore. Use Tooling (F) to install lip seals (18). Install lip seals (18). Repeat for the other side.
Note: Make sure that the lip of the lip seal is facing outward. The lip seals should not protrude beyond bore face.
Show/hide tableIllustration 25 g06396536 Show/hide tableIllustration 26 g06396908 Dimension (P) is 10.0 ± 1.0 mm (0.39 ± 0.04 inch) - Use Tooling (C) and a suitable lifting device to install bearing (17). The weight of Tooling (C) is approximately
33 kg (73 lb) . Install bearing (17) in the bucket pin bore. Install bearing (17) to a depth of Dimension (P) below the surface of the lift arm. Repeat for the other side.Note: Make sure that the lubrication holes are aligned during the installation of the bearings.
Show/hide tableIllustration 27 g06396933 Show/hide tableIllustration 28 g06396935 Orientation of lip seal (16). - Apply Tooling (J) to the lip seal bore. Use Tooling (F) to install lip seals (16). Install lip seals (16). Repeat for the other side.
Note: Make sure that the lip of the lip seal is facing outward. The lip seals should not protrude beyond bore face.
Show/hide tableIllustration 29 g06396962 Show/hide tableIllustration 30 g06397041 - Attach a suitable lifting device to lift arm (2). The weight of lift arm (2) is approximately
2310 kg (5093 lb) . - Lubricate the pin bores of lift arm (2) with Tooling (H). Lubricate the pin bores of the front loader frame with Tooling (K).
Note: Make sure that the Tooling (A) is in position.
- Position lift arm (2) in alignment with the pin bores of the front loader frame and Tooling (A).
Note: Do not damage the lip seals when installing the pin assemblies.
- Use two people to install pin assembly (14). The weight of pin assembly (14) is approximately
34 kg (75 lb) . Install the shims, pin assembly (14), the washer, and bolt (15). Repeat for the other side.Show/hide tableIllustration 31 g06396491 - Apply Tooling (L) to the threads of adapter assemblies (12) and tube assemblies (13). Install adapter assemblies (12) and connect tube assemblies (13).
Show/hide table
Illustration 32 g06397079 - Attach a suitable lifting device to position the rod end of the lift cylinders in alignment with the pin bores of the lift arm. The weight of the lift cylinder is approximately
260 kg (573 lb) .Note: Do not damage the lip seals when installing the pin assemblies.
- Apply Tooling (K) to the pin bores of the lift cylinder. Install pin assembly (11), the washer, and bolt (10).
- Repeat Step 12 and Step 13 for the other side.
Show/hide table
Illustration 33 g06396478 - Position hose assembly (7) and install bolt (8).
- Connect hose assembly (7) and install cable strap (9).
Show/hide table
Illustration 34 g06396477 - Connect hose assemblies (6).
Show/hide table
Illustration 35 g06396447 - Position harness assembly (5). Install clamps (3) and bolts (4). Tighten bolts (4) to a torque of
6 ± 1 N.m (53 ± 9 lb in) . - Connect harness assembly (5) and install the cable straps.
- Start the machine. Raise the lift arms and remove the blocks from the frame and the lift cylinder rods. Remove Tooling (B) and lower the lift arm to the floor.
Show/hide table
Illustration 36 g06396435 - Attach a suitable lifting device to lower tilt cylinder (1). The weight of tilt cylinder (1) is approximately
228 kg (503 lb) . Lower tilt cylinder (1) on the lift arm. Repeat for the other tilt cylinder.
Illustration 17 | g06396552 |
Illustration 18 | g06396913 |
Dimension (M) is |
End By:
- Install the lift position sensor.
- Install the front fenders.
- Install the tilt lever and the tilt link.
- Install the bucket.