980L Tier 3 Wheel Loader Machine System Caterpillar


Piston Pump (Implement) - Assemble

Usage:

980L D8Z

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
439-3940  Link Bracket 
1U-5449  Bearing Puller Gp 
1P-0510  Driver Gp 
192-5092  Removal Tool 
Loctite 648 
Loctite 263 
8T-0372  Bolt 
8T-5096  Dial Indicator 
9U-5719  Tubing 


    Illustration 1g03687208

  1. Use Tooling (C) to install shims (62) and bearing cups (61) into center section (3).


    Illustration 2g03687131

  2. Use Tooling (C) and a suitable press to install bearing cup (59). Install bearing cup (59).

  3. Install bearings (58) into front pump housing (27).

    Note: There are two (2) Brass Pins (which are used to hold the bearings in place) in the front pump housing.



    Illustration 3g03687122

  4. Apply Tooling (E) to the outer diameter of lip seal (57). Use Tooling (C) and a suitable press to install lip seal (57) into retainer (55). Install lip seal (57)


    Illustration 4g03687069

  5. Install O-ring seal (56) onto retainer (55).


    Illustration 5g03687012

  6. Install retainer (55) and bolts (54) onto front pump housing (27). Tighten bolts (54) to a torque of 9.5 ± 0.2 N·m (84.1 ± 1.8 lb in).


    Illustration 6g03688748

  7. Install sleeves (53) into the swashplate.

  8. Use the following procedure to determine the shim requirements needed between the retainers and the swashplate :


      Illustration 7g03717223

    1. Install piston (52) and retaining ring (51) onto actuator (47).


      Illustration 8g03717243


      Illustration 9g03717210

      ------ WARNING! ------

      Improper assembly of parts that are spring loaded can cause bodily injury.

      To prevent possible injury, follow the established assembly procedure and wear protective equipment.


    2. Use Tooling (D) and a suitable press to install retainer (50), spring (49), and retainer (48) onto actuator (47).


      Illustration 10g03688741

    3. Install ring (42) onto shaft (43). Install shaft (43), actuator assembly (44), plate (45), and shims (46) onto swashplate (37).


      Illustration 11g03688737

    4. Install pistons (40) into plate (41).


      Illustration 12g03688733


      Illustration 13g03688725


      Illustration 14g03688714

    5. Install pistons (40) and plate (41) onto swashplate (37).

    6. Use a feeler gauge to measure the gap between retainer (38) and plate (41). Add shims (39) to achieve a clearance of 0.010 to 0.030 mm (0.0004 to 0.0012 inch).

    7. Apply Tooling (F) to bolts (36). Install shims (39), retainer (38), and bolts (36).

    8. Repeat Steps 8.f and 8.g for the remaining rotating group.


    Illustration 15g03715525
    Front pump shaft assembly


    Illustration 16g03718409
    Rear pump shaft assembly

  9. Raise temperature of bearing cone (30) to 121 °C (250 °F). Install bearing cone (30) onto shaft assembly (29).

  10. Apply Tooling (E) to the outer diameter of guide (31). Install guide (31) with the tapered edge facing away from bearing cone (30).

  11. Use the following procedure to determine the end play for the shaft:


      Illustration 17g03689822

    1. Install shaft assembly (29) into the housing.

    2. Raise the temperature of bearing (24) to 121 °C (250 °F). Install ring (25) and bearing (24) onto the shaft.


      Illustration 18g03687208

    3. Install the shims (61) and bearing cups (60) into center section (3).


      Illustration 19g03689827

    4. Install center section (3) and Tooling (G). Tighten Tooling (G) to a torque of 110 N·m (80 lb ft).


      Illustration 20g00682185

    5. Use a rubber mallet to seat the shaft into the bearing cup.


      Illustration 21g06131423

    6. Install a suitable bolt into the end of the shaft. Install Tooling (H), as shown. Use a lever to measure the amount of end play in the shaft. Add the appropriate thickness of shims to achieve an end play of 0.020 to 0.070 mm (0.0008 to 0.0028 inch).

      Note: The shims are located in the center section under the bearing cup.

    7. Remove the center section.


      Illustration 22g03689822

    8. Remove shaft assembly (29) from the housing.

    9. Use Tooling (B) to remove ring (25) and bearing (24) from shaft (29).

    10. Repeat Steps 11.a through 11.i for the driven end of the pump.


    Illustration 23g03738105


    Illustration 24g06069965

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  12. Install washers (34), spring (35), and inner and outer bushings (33) into barrel assembly (16).

  13. Use a suitable press to compress spring (35).

  14. Install retaining ring (32) into barrel assembly (16).

  15. Repeat Steps 12 through 14 for the remaining barrel assembly.

  16. Use the following procedure to determine the sliding block play:


      Illustration 25g03718035

    1. Install the pins and bearings (58).

      Note: The pins must be installed to a depth below the bearings.



      Illustration 26g03719080
      Dimension (A)

    2. Install the swashplate assembly into the pump housing.

    3. Use a depth gauge to level the swashplate assembly inside the pump housing. Take several measurements to make sure that the swashplate is level.

    4. Install a 5.0 mm (0.02 ft) ball bearing into each spherical hole on the swashplate assembly.

    5. Use the depth gauge to measure the distance from the face of the pump housing to the top of the ball bearings. This measurement will be referred to as Dimension (A).


      Illustration 27g03717960
      Dimension (B)

    6. Measure the length of lubrication tubes (17). This measurement will be referred to as Dimension (B).


      Illustration 28g03719155
      Dimension (C)

    7. Remove the shims from the holes in the head assembly. Use the depth gauge to measure the depth of the holes. This measurement will be referred to as Dimension (C).

    8. Use the following formula to determine the number of shims needed:

      A + C + 5 mm (0.19685 inch) = B + 0.01 to 0.15 mm (0.00039 to 0.00590 inch)



    Illustration 29g03718031

  17. Install pistons (40) into barrel assembly (16).


    Illustration 30g03718034

  18. Install shaft (29) into barrel assembly (16).


    Illustration 31g06132601


    Illustration 32g00669010

  19. Install Tooling (J) on the shaft. Tooling (J) is used to prevent damage to the lip seal.

  20. Raise the temperature of Tooling (J) to shrink into place.


    Illustration 33g06075456


    Illustration 34g06075460

  21. Install spacer (25) and bearing cone (24).

  22. Repeat Steps 16 through 21 for the other rotating group.


    Illustration 35g06073901

  23. Apply a paint mark on one drive shaft spline that aligns with the center of one of the kidney slots on the cylinder barrel.


    Illustration 36g06073916

  24. On the coupling, select any spline and apply a paint mark along the root of the spline. Apply a paint mark on each end of the coupling as well.


    Illustration 37g06073923
    Use the rotating group for the rear pump for this step.

  25. Install the coupling onto the drive shaft at various positions, until the paint mark on the coupling aligns between two kidney slots on the cylinder barrel.


    Illustration 38g06073933

  26. Slightly lift the Coupling, and then apply a paint mark on the drive shaft spline that aligns with the paint mark on the Coupling.


    Illustration 39g06074244

  27. The cylinder barrels for the front pump and rear pump must be properly “timed” to insure smooth, quiet operation of the pump. Illustration 39 shows how the two cylinder barrels are set in properly “timed” positions. Use the paint marks to ensure that the front pump and rear pump must be properly “timed” during final assembly.


    Illustration 40g06075941

  28. Install the O-ring seals and the back-up rings on lubrication tubes (20).


    Illustration 41g06075970

  29. Install lube tubes (20) and the shims determined in Step 16.h.


    Illustration 42g06075990

  30. Install port plate (21).


    Illustration 43g06076008

  31. Install rotating group (26) for the front pump onto center section (3).


    Illustration 44g06076026

  32. Make sure that both actuator pistons and lube tubes (20) are in the appropriate cavities on center section (3).


    Illustration 45g06076039

  33. Install front pump housing (27).


    Illustration 46g03689827

  34. With the pump still oriented as shown in Step 33, install Tooling (G). Do not clamp firmly - you only need to hold them together to reposition the pump. Reposition pump as shown.

  35. Remove Tooling (G).


    Illustration 47g06076158

  36. Install coupling (22) onto the tail-splines of the front pump drive shaft. Orient the coupling so that the paint marks on the coupling and the drive shaft align with each other.


    Illustration 48g03670277

    Note: Install the lubrication tubes and the shims determined in Step 16.h.

  37. Install lube tubes (17) and the shims.

  38. Install port plate (18) onto center section (3).


    Illustration 49g03670005

  39. Install rotating group (11) onto center section (3). Orient the rotating group so that the paint marks on the coupling and the drive shaft align with each other.


    Illustration 50g06074722

  40. Install connection rods (10).

  41. Install new self-adhesive dampener strips to the connection rods marked (10A).


    Illustration 51g03669361

  42. Install bearing (8) and bearing cup (9) into rear pump housing (7).

    Note: There are two Brass Pins (which are used to hold the bearings in place) remaining in the front pump housing. If undamaged, leave the brass pins in the front pump housing.



    Illustration 52g03669360

  43. Use Tooling (A) and a suitable lifting device to install rear pump housing (7). Install rear pump housing (7).


    Illustration 53g06128833

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  44. Install the O-ring seals and nuts (6). Tighten nuts (6) to a torque of 110 N·m (81 lb ft).

  45. Apply Tooling (F) to bolts (4). Install bolts (4).


    Illustration 54g06128816

  46. Install the O-ring seals, valve group (2), the washers, and bolts (1) to center section (3).

End By:

  1. Install the piston pump (implement).

Caterpillar Information System:

980L Tier 3 Wheel Loader Machine System Lift Arms - Remove and Install
980M Tier 4 and 982M Tier 4 Wheel Loaders Machine Systems Lift Arms - Remove and Install
980M Tier 4 and 982M Tier 4 Wheel Loaders Machine Systems Instrument Panel (Lower) - Remove and Install
980L Tier 3 Wheel Loader Machine System Loader Frame from Rear Frame - Separate
785G IV Off-Highway Truck Field Assembly Assembly Preparation
785G IV Off-Highway Truck Field Assembly Introduction
An Improved Transmission Pump is Now Available For Certain 700 C-Series Articulated Trucks {3030, 3066} An Improved Transmission Pump is Now Available For Certain 700 C-Series Articulated Trucks {3030, 3066}
2570D and 2670D Wheel Feller Buncher Engine Supplement Diesel Exhaust Fluid Tank - Remove and Install
980L Tier 3 Wheel Loader Machine System Electrohydraulic Control - Remove and Install
R1700 Load Haul Dump Engine Water Pump - Inspect
CP74B, CS74B, CS76B and CS78B Vibratory Soil Compactors Machine Systems Smooth Drum Scraper
New Implement, Steering, Pilot, and Braking Pump Now Used on R1600G and R1600H Load Haul Dump Machines {4014, 4257, 4268, 4304, 4306, 5055, 5057, 5073, 5084, 5085} New Implement, Steering, Pilot, and Braking Pump Now Used on R1600G and R1600H Load Haul Dump Machines {4014, 4257, 4268, 4304, 4306, 5055, 5057, 5073, 5084, 5085}
980L Tier 3 Wheel Loader Machine System Tilt Cylinder - Remove and Install
R1700 Load Haul Dump Power Train, Steering, Braking, Hydraulic, and Machine Systems Brake Accumulator - Test and Charge
Procedure to Rework the Axle Housing on R1600G and R1600H Load Haul Dump Machines {3260} Procedure to Rework the Axle Housing on R1600G and R1600H Load Haul Dump Machines {3260}
980L Tier 3 Wheel Loader Machine System Control Valve (Auxiliary) - Disassemble
R1700 Load Haul Dump Power Train, Steering, Braking, Hydraulic, and Machine Systems Lift and Tilt Cylinder Drift - Check
980L Tier 3 Wheel Loader Machine System Control Valve (Auxiliary) - Assemble
980M Tier 4 and 982M Tier 4 Wheel Loaders Machine Systems Combination Valve (Brake Accumulator Charge, Fan Supply, Steering Pilot, Implement Pilot) - Assemble
A New Transmission Output Speed Sensor Mounting Bracket is Now Used on Certain 797F Large Off-Highway Truck {1408, 1439, 3160, 3175, 3258} A New Transmission Output Speed Sensor Mounting Bracket is Now Used on Certain 797F Large Off-Highway Truck {1408, 1439, 3160, 3175, 3258}
994K Wheel Loader Machine Systems Lift Arms - Remove and Install
3524B Engine for Caterpillar Built Machines Water Pump - Remove
Proper Quick Coupler Actuator Orientation for Compact Track Loaders, Skid Steer Loaders, and Multi Terrain Loaders {6129} Proper Quick Coupler Actuator Orientation for Compact Track Loaders, Skid Steer Loaders, and Multi Terrain Loaders {6129}
CB2.5, CB2.7, CB2.9 and CC2.6 Vibratory Utility Compactors Engine Supplement System Pressure - Release
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.