Assembly Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned thoroughly in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. All disassembly and all assembly procedures must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have the same sealing properties as a new O-ring.
Note: Apply a light film of hydraulic oil to all components before assembly.
Show/hide table
|
|
|
Illustration 1 | g03699439 |
- Install valve assembly (29) and solenoid valve assembly (28) .
Show/hide table
|
|
|
Illustration 2 | g03699434 |
- Install outlet manifold group (27) .
Show/hide table
|
|
|
Illustration 3 | g03699387 |
- Install O-ring (4) .
Show/hide table
|
|
|
Illustration 4 | g03700629 |
Show/hide table
|
Improper assembly of parts that are spring loaded can cause bodily injury. To prevent possible injury, follow the established assembly procedure and wear protective equipment. |
|
- Install O-ring (18) and tongue (17). Tighten tongue (17) to a torque of 10 ± 1 N·m (89 ± 6 lb in).
- Install spool (19) .
Show/hide table
|
|
|
Illustration 5 | g03700627 |
- Install seal (14), wiper (15), and plate (16) .
Show/hide table
|
|
|
Illustration 6 | g03700626 |
- Install retainers (9) and spring (10). Install adaptor (11) to a torque of 10 ± 1 N·m (89 ± 6 lb in).
- Install spool cap (12) and screws (13). Tighten screws (13) torque of 10 ± 1 N·m (89 ± 6 lb in).
Show/hide table
|
|
|
Illustration 7 | g03700625 |
- Install seal (8), wiper (7), plate (6), and screws (5). Tighten screws (5) torque of 10 ± 1 N·m (89 ± 6 lb in)
Show/hide table
|
|
|
Illustration 8 | g03699399 |
- Install right-hand stabilizer (26) .
Show/hide table
|
|
|
Illustration 9 | g03699395 |
Show/hide table
|
|
|
Illustration 10 | g03699405 |
- Install O-ring (22). Install valve group (21). Tighten valve group (21) to a torque of 45 ± 5 N·m (33 ± 4 lb ft).
- Repeat Steps 3 and 9.
Show/hide table
|
|
|
Illustration 11 | g03699398 |
- Install stick control valve (25) .
Show/hide table
|
|
|
Illustration 12 | g03699397 |
- Install bucket control valve (24) .
- Repeat Steps 11 and 12.
Show/hide table
|
|
|
Illustration 13 | g03699396 |
- Install swing control valve (23) .
- Repeat Steps 11 and 12.
Show/hide table
|
|
|
Illustration 14 | g03699393 |
- Install boom control valve (20) .
- Repeat Steps 11 and 12.
Show/hide table
|
|
|
Illustration 15 | g03699386 |
- Repeat Steps 3 to 9.
Show/hide table
|
|
|
Illustration 16 | g03699527 |
- Install inlet manifold (2).
- Install nuts (1) and (25). Tighten two nuts (1) to a torque of 45 ± 5 N·m (33 ± 4 lb ft). Tighten four nuts (25) to a torque of 24 ± 3 N·m (212 ± 27 lb in).
End By:
Install the bank valve (backhoe).