Footshaft - Assemble
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 140-3073 | Spanner Wrench | 1 |
- Install shaft (10), washer (12), and nut (13). Tighten nut (13) to a torque of
410 N·m (300 lb ft) .Show/hide tableIllustration 2 g00776995 - Install shim (1) and spacer (11) on shaft 10.
Show/hide table
Illustration 3 g00776994 - Install bearing cone (9) on shaft (10).
Show/hide table
Illustration 4 g00776993 - Install two bearing cups (8) in roller (3).
Show/hide table
Illustration 5 g00776992 - Install roller (3) and bearing cone (7).
Show/hide table
Illustration 6 g00776991 - Install washer (6).
Show/hide table
Illustration 7 g00776990 - Install lockwasher (5).
Show/hide table
Illustration 8 g00776988 - Install locknut (4). Use Tooling (A) and torque locknut (4) to a rolling torque of
23 N·m (200 lb in) . Loosen locknut (4) and torque to a rolling torque of8.5 N·m (75 lb in) . Bend one of the tabs on lockwasher (5) into one of the slots on the locknut.Show/hide tableIllustration 9 g00776987 - Install plug (2) in roller (3).
Show/hide table
Illustration 10 g01056855 - Bend the corners on shim (1).
- Repeat Steps 1 through 10 and assemble the opposite side of the footshaft.
Show/hide table
Illustration 1 | g01056892 |
End By:
- Install the footshaft. Refer to Disassembly and Assembly, "Footshaft - Install".
Caterpillar Information System:
AP555E and BG555E Asphalt Pavers Machine Systems Footshaft - Disassemble
AP-655C and BG-2255C Asphalt Pavers Machine Systems Footshaft - Remove
C13, C15, and C18 Generator Set Engines Engine Pressure Sensor Open or Short Circuit - Test
R1300G Load Haul Dump Power Train Oscillating Axle (Rear) to Output Transfer Gears - Connect
AP-1000B and BG-260C Asphalt Pavers Conveyor Systems Cooling Manifold
R1300G Load Haul Dump Power Train Oscillating Axle (Rear) from Output Transfer Gears - Separate
M325D L MH and M325D MH Material Handlers Hydraulic System Travel Brake Valve
CP-323C and CS-323C Paving Compactors Engine Supplement Air Cleaner - Remove and Install
247B, 247B2, 257B and 257B2 Multi Terrain Loaders Power Train Bogie Wheel - Install
247B and 257B Multi Terrain Loaders Machine Systems General Information
248B and 268B Skid Steer Loaders Piston Motor (Hydrostatic) - Assemble
248B and 268B Skid Steer Loaders Piston Motor (Hydrostatic) - Disassemble
AP-655C and BG-2255C Asphalt Pavers Machine Systems Footshaft - Install
CB-334E and CB-335E Vibratory Compactors Propel System Case Drain Flow for Piston Motor (Wheel Propel) - Test
914G and 914G2 Compact Wheel Loaders and IT14G and IT14G2 Integrated Toolcarriers Power Train Limited Slip Differential - Disassemble - If Equipped
2004/03/15 Addition to Operation and Maintenance Manual , "Every 500 Service Hours or 3 Months" {4251}
914G and 914G2 Compact Wheel Loaders and IT14G and IT14G2 Integrated Toolcarriers Power Train Limited Slip Differential - Assemble - If Equipped
2004/03/08 Improved Gasket for the Engine Oil Cooler {1378, 7555}
2004/03/01 Improved Gasket for the Engine Oil Cooler {1378, 7555}
914G and 914G2 Compact Wheel Loaders and IT14G and IT14G2 Integrated Toolcarriers Power Train Oscillating Axle (Rear) and Trunnion Support - Remove
914G and 914G2 Compact Wheel Loaders and IT14G and IT14G2 Integrated Toolcarriers Power Train Oscillating Axle (Rear) and Trunnion Support - Install
TH350B, TH360B, TH460B and TH560B Telehandlers Machine Systems Hydraulic Tank
2004/06/14 A New Hoist Pump Is Now Available {5083}
AP-1055B and BG-2455C Asphalt Pavers Equipment Lowering with Engine Stopped