IT28G Integrated Toolcarrier and 928G Wheel Loader Hydraulic System Caterpillar


Pilot Oil Accumulator - Test and Charge

Usage:

IT28G DBT

------ WARNING! ------

Hydraulic oil pressure can remain in the hydraulic system on this machine after the engine and pump have been stopped. Serious injury can result if this pressure is not released before any service is done on the hydraulic systems. In order to prevent possible injury, release the hydraulic system pressure before working on any fitting, hose, or hydraulic component.

Lower all attachments to the ground before service is started. If the hydraulic system must be serviced, tested, or adjusted with the attachment in the raised position, the attachments and lift cylinders must be supported properly.

Always move the machine to a location away from the travel of other machines. Be sure that other personnel are not near the machine when the engine is running and tests or adjustments are being made.

----------------------

------ WARNING! ------

Personal injury or death can result from improper accumulator charging.

Dry Nitrogen is the only gas approved for use in the accumulator. Charging the accumulator with oxygen will cause an explosion. This danger will not happen if nitrogen cylinders with standard CGA (Compressed Gas Association, Inc.) Number 580 connections are used.

When ordering nitrogen gas, be sure that the cylinders are equipped with CGA Number 580 connections. Do not use color codes or other methods of identification to tell the difference between nitrogen and oxygen cylinders

Never use an adapter to connect your nitrogen charging group to a valve outlet used on both nitrogen, oxygen, or other gas cylinders. BE SURE YOU USE DRY NITROGEN (99.8% purity).

----------------------

Pilot Accumulator

The following procedure can be used in order to test the pilot accumulator. The pilot accumulator maintains pressure in the pilot hydraulic system. The accumulator allows you to lower the boom, and the work tools with a stopped engine.

When you test or you charge the pilot accumulator, the pressure in the pilot hydraulic system must be released. The temperature of the nitrogen gas must also be taken into account. The pressure and volume of nitrogen gas varies with temperature.

Discharging the Accumulator

  1. Ensure that the oil in the hydraulic system is at normal operating temperature. Park the machine on a smooth, level surface.

  1. Install the steering frame lock. Block the wheels. Stop the engine.

  1. Turn the engine start switch to the ON position. Move the joystick, the third function lever and the fourth function control through the full range of travel.

    Note: Moving the joystick and moving the levers will release the pressure in the pilot hydraulic system.




    Illustration 1g00902710



    Illustration 2g00902707

  1. Remove the access panels (A) under the platform on the right side of the machine in order to access the pilot accumulator (B) .



    Illustration 3g00282181

  1. Remove guard (1) which protects nitrogen charging valve (2) .

  1. Remove the protective cap on nitrogen charging valve (2) .



    Illustration 4g00282185

    (3) Nipple. (4) Coupling assembly. (5) Pressure gauge. (6) Hose assembly. (7) Coupling assembly. (8) Nipple. (9) Valve. (10) Pressure gauge. (11) Regulator assembly. (12) Pressure regulating screw. (13) Chuck for the nitrogen cylinder valve. (14) Valve handle. (15) Nitrogen charging chuck. (16) Hose assembly. (17) Tee.

  1. Identify the correct nitrogen charging chuck.

    Note: For a nitrogen charging valve with a .305 inch -32 THD, use a 1S-8938 Nitrogen Charging Chuck and a 1U-5551 Extension Assembly. For a nitrogen charging valve with a .482 inch -26 THD, use a 7S-5106 Nitrogen Charging Chuck and a 7S-5439 Extension Assembly .

  1. Attach hose assembly (16) to nitrogen charging chuck (15) .

  1. Turn the valve handle (14) on nitrogen charging chuck (15) all the way in the counterclockwise direction. This will ensure that nitrogen charging valve (2) will not be opened when nitrogen charging chuck (15) is attached to the nitrogen charging valve.

  1. Attach nitrogen charging chuck (15) and hose assembly (16) to nitrogen charging valve (2) .

  1. Attach nitrogen charging chuck (15) and hose assembly (16) to nitrogen charging valve (2) .

  1. Place the open end of hose assembly (16) away from the work area and away from other personnel.

  1. Turn valve handle (14) on nitrogen charging chuck (15) all the way in the clockwise direction in order to open nitrogen charging valve (2). This will release all of the compressed gas from the accumulator through hose assembly (16). Now, the accumulator can be removed from the machine.

  1. Disconnect the hydraulic lines for servicing, as needed.

Nitrogen Charging Procedure

Table 1
Required Tools    
Part Number     Description     Quantity    
7S-5437     Nitrogen Charging Group     1    
8T-0854     Pressure Gauge     1    



    Illustration 5g00107133

    Nitrogen Charging Group

    (1) Nipple. (2) Coupling assembly. (3) Pressure gauge. (4) Hose assembly. (5) Coupling assembly. (6) Nipple. (7) Valve. (8) Pressure gauge. (9) Regulator assembly. (10) Pressure regulating screw. (11) Chuck for the nitrogen cylinder valve. (12) Valve handle. (13) Chuck. (14) Hose assembly.

  1. Ensure that valve (7) is closed. Install chuck (13) onto the pilot accumulator. Turn valve handle (12) completely in the clockwise direction.

  1. If the reading on pressure gauge (8) is too high, slowly open valve (7) in order to lower the pressure. If the reading on the pressure gauge is too low, use the following procedure to charge the accumulator:

    1. Connect a hose from the nitrogen cylinder to chuck (11) .

    1. Open the valve on the nitrogen cylinder. Adjust screw (10) on regulator assembly (9) until pressure gauge (3) is at the correct charging pressure.

    1. Slowly open valve (7) and charge the accumulator. Charge the accumulator to 862 ± 35 kPa (125 ± 5 psi) at a temperature of 21 °C (70 °F). Then, close valve (7). If pressure gauge (8) and pressure gauge (3) show the same reading and the readings do not change, the accumulator has the correct charge.

      If the pressure reading on gauge (8) decreases, open valve (7) and allow more nitrogen to fill the accumulator.

      Perform this procedure until pressure gauge (8) and pressure gauge (3) show the same reading. Make sure that neither reading changes when valve (7) is closed.

  1. Close valve (7). Close the valve on the nitrogen cylinder.

  1. Turn valve (12) on chuck (13) outward in the counterclockwise direction. Remove the test equipment.

Caterpillar Information System:

R1700G Load Haul Dump Joystick Control
2002/06/17 Bushings for the Grapple and the Grapple Cylinder are Now Available {6307}
2002/08/12 Manual Retraction of the Hydraulic Coupler Pins {6129}
Field Installation of the 223-8416 Installation Arrangement (Air Conditioner Conversion) {7304, 7320} Field Installation of the 222-5722 Installation Arrangement (Air Conditioner and Heater) {7304, 7320}
814F Wheel Dozer, 815F Soil Compactor and 816F Landfill Compactor Power Train MID 081 - CID 1693 - FMI 13
814F Wheel Dozer, 815F Soil Compactor and 816F Landfill Compactor Power Train MID 081 - CID 1693 - FMI 04
RM-350B Road Reclaimer/Soil Stabilizer Machine Systems Transmission Hydraulic Control (Rotor) - Remove and Install
814F Wheel Dozer, 815F Soil Compactor and 816F Landfill Compactor Power Train MID 081 - CID 1693 - FMI 03
IT28G Integrated Toolcarrier and 928G Wheel Loader Hydraulic System Tilt Cylinder
814F Wheel Dozer, 815F Soil Compactor and 816F Landfill Compactor Power Train MID 081 - CID 1693 - FMI 01
814F Wheel Dozer, 815F Soil Compactor and 816F Landfill Compactor Power Train MID 081 - CID 1693 - FMI 00
Air Conditioning and Heating R-12 All Caterpillar Machines Identifying the Air Conditioning System
IT28G Integrated Toolcarrier and 928G Wheel Loader Hydraulic System Hydraulic Oil Contamination - Test
2002/09/30 Correction to Disassembly and Assembly , "Compensating Cylinder" {5816}
216, 226, 232 and 242 Skid Steer Loaders Machine Systems Pilot Operated Hydraulic Control - Disassemble
574B Forwarder Brake Discs - Check
574B Forwarder Towing the Machine
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Steering System Articulated Hitch
3056E Industrial Engine Air Inlet Heater - Test
2002/07/01 Improved Track Press Tools are Available for Positive Pin Retention Track {4150}
928H and 928HZ Wheel Loader Steering System System Pressure - Release
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers 5 Volt Engine Pressure Sensor Supply Circuit - Test
2002/07/01 Thread Lock Compound and a New Torque is Used on the Bolt for the Front Drive Shaft {3253}
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers Engine Pressure Sensor Open or Short Circuit - Test
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.