988G Wheel Loader Power Train Caterpillar


Final Drive and Wheel - Disassemble

Usage:

988G 2TW

Disassembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
138-7573  Link Bracket 
1U-8222  Lifting Sling 
1D-4574 Bolt (1/2 - 13 × 6 NC) 
138-7575  Link Bracket 

Start By:

  1. Remove the final drive and the wheel. Refer to Disassembly and Assembly, "Final Drive, Brake, and Wheel - Remove" for the machine that is being serviced.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products.

Dispose of all fluids according to local regulations and mandates.




    Illustration 1g00687223

  1. Place the final drive and the wheel in a vertical position on a hard, level surface. The combined weight of the final drive and of the wheel is 770 kg (1700 lb).


    Illustration 2g00687224

  2. Remove four bolts (1) that fasten the planetary carrier to the wheel.


    Illustration 3g00687225

  3. Attach Tooling (A), a suitable hoist, and suitable lifting slings to planetary carrier (2), as shown.

  4. Use the hoist in order to remove planetary carrier (2). The weight of the planetary carrier is 213 kg (470 lb).

    Note: Steps 5 through 10 are used for the disassembly of the planetary carrier.



    Illustration 4g00687226

  5. Remove O-ring seal (3) from planetary carrier (2).


    Illustration 5g00687227

  6. Place the planetary assembly on suitable wood blocks, as shown.


    Illustration 6g00687228

  7. Use a soft faced hammer in order to remove planetary shaft (4) from planetary carrier (2).

    Note: The planetary shaft is a slip fit to the planetary carrier.



    Illustration 7g00687229

  8. Remove two thrust washers (5) and planetary gear (6) from the carrier.


    Illustration 8g00687230

  9. Remove ring (8) and two bearings (7) and (9) from planetary gear (6).

  10. Repeat Steps 6 through 9 for the remaining two planetary gears.


    Illustration 9g00687231

  11. Remove bolts (10) and retainer (11).


    Illustration 10g00687232

  12. Remove shim pack (12).


    Illustration 11g00687233


    Illustration 12g00687234

  13. Install Tooling (B) in the hole of hub (13). Repeat this step for the two remaining holes, as shown.

  14. Attach a suitable hoist to the lifting slings.

  15. Use the hoist in order to remove hub (13) and gear (14) as a unit. The combined weight of the hub and of the gear is 143 kg (315 lb).


    Illustration 13g00687235

  16. Place hub and gear (14) on suitable wood blocks, as shown.

    Note: Leave the lifting slings and the hoist attached to the hub and the gear.



    Illustration 14g03847194

  17. Remove eight bolts (15) and four plates (16).

  18. Use the hoist in order to lift hub (13) from ring gear (14). The weight of the hub is 68 kg (150 lb). Remove bushing (13A) if needed.


    Illustration 15g00687237


    Illustration 16g00370585
    Typical Example

  19. To remove bearing cone (17) from hub (13), turn the hub so that the bearing cone is facing downward, as shown.

    Note: Do not apply heat directly to the hub. Excessive heat may reduce the service life of the hub.

  20. Use a suitable torch in order to heat the bearing cone evenly around the circumference. Continue to heat the bearing cone until the bearing cone falls from the hub.


    Illustration 17g00687238

  21. Install Tooling (C) to wheel (18).

  22. Attach a suitable hoist and lifting slings to Tooling (C).

  23. Use the hoist in order to carefully remove wheel (18) from the spindle. The weight of the wheel is 222 kg (490 lb).


    Illustration 18g00687239

  24. Remove Duo-Cone seal (19).

  25. Use a hammer and a punch in order to remove bearing cups (20) and (21).


    Illustration 19g00687240


    Illustration 20g00370585
    Typical Example

  26. Remove Duo-Cone seal (23) from spindle (24).

  27. To remove bearing cone (25) from spindle (24), turn the spindle onto the opposite side so that the bearing cone is facing downward, as shown.

    Note: Do not apply heat directly to the spindle. Excessive heat may reduce the service life of the spindle.

  28. Use a suitable torch in order to heat the bearing cone evenly around the circumference. Continue to heat the bearing cone until the bearing cone falls from the spindle.

Caterpillar Information System:

988G Wheel Loader Power Train Final Drive Spindle - Assemble
988G Wheel Loader Power Train Final Drive Spindle - Disassemble
2000/03/20 Improved Exhaust Manifolds {1059}
988G Wheel Loader Power Train Final Drive, Brake and Wheel - Install
834G Wheel Dozer and 836G Landfill Compactor Braking System Service Brakes - Test
988G Wheel Loader Braking System Service Braking System Pressure - Test
2000/03/20 Changes to Operation and Maintenance Manuals, SEBU7207 and SEBU7255 {3261, 7000}
3508B Engine for 854G Wheel Dozers and 992G Wheel Loaders MID 036 - CID 0298 - FMI 02 Incorrect Service Brake Pedal Switch inputs
325D and 329D Excavators Fuel Tank Cap and Strainer - Clean
3176C, 3196 and 3406E Engines for 725, 730, 735, 740, and 740 Ejector Articulated Trucks E025 High Inlet Air Temperature Derate
3176C, 3196 and 3406E Engines for 725, 730, 735, 740, and 740 Ejector Articulated Trucks E015 High Engine Coolant Temperature Derate
988G Wheel Loader Power Train Axle Oil Cooler - Assemble
320C Excavator Hydraulic System Pump Control (Main Hydraulic) - Main Pump Regulator
3508B Engine for 854G Wheel Dozers and 992G Wheel Loaders MID 036 - CID 0548 - FMI 05 Throttle Lock Lamp open circuit
3508B Engine for 854G Wheel Dozers and 992G Wheel Loaders MID 036 - CID 0548 - FMI 06 Throttle Lock Lamp short
3508B Engine for 854G Wheel Dozers and 992G Wheel Loaders MID 036 - CID 0650 - FMI 12 Harness Code invalid
2000/03/13 New Pump Drives with An Improved Seal Are Now Available {3108}
988G Wheel Loader Power Train Final Drive and Wheel - Assemble
3524B Engines for 797 and 797B Off-Highway Trucks General Information (Fuel System) - Diesel
14H Motor Grader Ether Starting Aid Cylinder - Replace
3054 Engine Compression - Test
8-16B, 10-20B and 10-20WB Extend-A-Mat<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> Screed Beginning to Pave
140H and 160H Motor Graders Ether Starting Aid Cylinder - Replace
TH62, TH63, TH82 and TH83 Telehandlers Braking System Service Brake Discs - Check