Shift Cylinder - Remove and Install

Usage:

D250E II 4PS

Removal Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1U-8233     Nylon Lifting Sling     2    

------ WARNING! ------

At operating temperature, the hydraulic tank is hot and under pressure.

Hot oil and components can cause personal injury. Do not allow hot oil or components to contact skin.

Remove the filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand. Remove the filler cap slowly in order to relieve pressure.

----------------------


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the machine. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide", for tools and supplies suitable to collect and contain fluids in Caterpillar machines.

Dispose of all fluids according to local regulations and mandates.


  1. Put identification marks on all lines, hoses, wires, and tubes for installation purposes. Plug all lines, hoses and tubes. This helps prevent fluid loss and contamination of the oil system.



    Illustration 1g00523861

  1. Remove three bolts (1) and place transmission oil filter assembly (2) aside. Remove nuts (3) that secure the accumulator to the crossbeam. Remove the accumulator from the crossbeam. Check for any other obstructions to the removal of the crossbeam.



    Illustration 2g00523925

    The cab has been removed for photographic clarity.

  1. Remove U-bolt (4) that secures the exhaust pipe to the mounting bracket. Use Tooling (A) in order to attach crossbeam (6) to a suitable hoist. Remove eight bolts (5) and remove crossbeam (6) from the frame. Crossbeam (6) has a weight of 50 kg (110 lb) .



    Illustration 3g00523927

  1. Disconnect the following components: two wire clamps (7), electrical connector (8), electrical connector (9) and electrical connectors (10)



    Illustration 4g00523965

  1. Disconnect line (11) from the speed shift solenoid.

    Note: The transmission has been removed from the machine in the following photos. This is for photographic clarity. The transmission does not need to be removed from the machine in order to remove the shift cylinder.




    Illustration 5g00523999



    Illustration 6g00524004

  1. Remove ten bolts, the washers, cover (13) and the gasket. Remove two bolts (15) . Disconnect electronic control group (14) and remove electronic control group (14) . Remove eleven bolts, cover (12) and that gasket.



    Illustration 7g00524029

  1. Loosen nut (16) and remove rod (18) . Disconnect hose (17) from the flange.



    Illustration 8g00524032

  1. Remove three bolts (19) that hold shift cylinder (20) to the transmission. Remove shift cylinder (20) .

Installation Procedure

Note: The transmission has been removed from the machine in the following four photos. This is for photographic clarity. The transmission does not need to be removed from the machine in order to install the shift cylinder.




    Illustration 9g00524032

  1. Use three bolts (19) in order to install shift cylinder (20) .



    Illustration 10g00524029

  1. Connect hose (17) to the flange. Install rod (18) and tighten nut (16) . Make sure that the eye on the end of rod (18) is over the pin.



    Illustration 11g00524125

  1. Install cover (12) and the gasket without installing the bolts.



    Illustration 12g00524082

  1. Remove plug (21) in order to view the alignment of the gears.

  1. Lift cover (12) and rotate the gear in order to align the ""V"" that is stamped on the sector gear with the tooth space between the adjacent teeth that are marked with ""V's"". Install plug (21) after the alignment has been completed.



    Illustration 13g00524004



    Illustration 14g00523999

  1. Use eleven bolts in order to install cover (12) . Be sure to install the gasket. Use two bolts (15) in order to install electronic control group (14) . Connect the electrical connector to electronic control group (14) . Use ten bolts in order to install cover (13) . Be sure to install the gasket.



    Illustration 15g00523965

  1. Connect line (11) to the speed shift solenoid.



    Illustration 16g00523927

  1. Connect the following components: two wire clamps (7), electrical connector (8), electrical connector (9) and electrical connectors (10)



    Illustration 17g00523925

  1. Use Tooling (A) in order to attach crossbeam (6) to a suitable hoist. Crossbeam (6) has a weight of 50 kg (110 lb). Use eight bolts (5) in order to install crossbeam (6) to the frame. Install U-bolt (4) that secures the exhaust pipe to the mounting bracket.



    Illustration 18g00523861

  1. Use nuts (3) in order to attach the accumulator to the crossbeam. Use three bolts (1) in order to install transmission oil filter assembly (2) .

Note: See Operation and Maintenance Manual, "Transmission Oil - Change" for the fluid capacities and the proper filling procedures.

Caterpillar Information System:

CB-434C, CB-534C and CB-634C Vibratory Compactors Water Spray System Water Spray System Troubleshooting
D250E Series II and D300E Series II Articulated Trucks Power Train Output Transfer Gears - Disassemble
D250E Series II and D300E Series II Articulated Trucks Power Train Output Transfer Gears - Assemble
D250E Series II and D300E Series II Articulated Trucks Power Train Main Drive Shaft - Remove and Install
D250E Series II and D300E Series II Articulated Trucks Power Train Front Drive Shaft - Remove and Install
3406E On-Highway Engine Camshaft Bearings - Remove
Challenger 35, Challenger 45 and Challenger 55 Agricultural Tractors Drawbar Wearplates, Swing Stops - Replace
527 Track-Type Skidder Power Train Idlers (Track)
CB-434C, CB-534C and CB-634C Vibratory Compactors Water Spray System Visual Inspection (Water Spray System)
3412E Engine Supplement for 773D Off-Highway Trucks and 775D Off-Highway Quarry Trucks Engine Oil Filter and Oil Filter Base - Remove and Install
515 Wheel Skidder and 525 Wheel Skidder Steering Frame Lock
D250E Series II and D300E Series II Articulated Trucks Power Train Center Drive Axle - Install
D250E Series II and D300E Series II Articulated Trucks Power Train Spindle - Install
D250E Series II and D300E Series II Articulated Trucks Power Train Spindle - Remove
D250E Series II and D300E Series II Articulated Trucks Power Train Transmission and Transfer Gears - Separate
D250E Series II and D300E Series II Articulated Trucks Power Train Transmission and Transfer Gears - Connect
D250E Series II and D300E Series II Articulated Trucks Power Train Wheel Bearings and Duo-Cone Seals - Install
D250E Series II and D300E Series II Articulated Trucks Power Train Wheel Bearings and Duo-Cone Seals - Remove
IT14G Integrated Toolcarrier and 914G Wheel Loader Power Train General Information
5130, 5130B and 5230 Excavators, 784B, 785B, 785C, 789B, 789C, 793B and 793C Off-Highway Truck/Tractors and 992G, 994 and 994D Wheel Loaders Vital Information Management System (VIMS) Chip Detector - Test
773D Off-Highway Truck and 775D Quarry Truck Differential and Bevel Gear
938G Wheel Loader and IT38G Integrated Toolcarrier Hydraulic System Ride Control System
3406C Engines for Caterpillar Built Machines Water Pump
3306B Industrial Engine Cold Weather Starting
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.