Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 439-3939 | Link Bracket | 2 |
B | 1P-0520 | Driver Group | 1 |
C | 2P-8312 | Retaining Ring Pliers | 1 |
D | 2D-1201 | Eyebolt | 2 |
E | 2D-1201 | Eyebolt | 1 |
F | - | LOCTITE 242 | - |
- Check all of the O-ring seals and the components for wear or damage. Replace the components, if necessary.
- Lubricate all of the O-ring seals lightly with the lubricant that is being sealed.
Show/hide table
Illustration 1 g00494202 - Heat ring carrier (67), ball bearing (68), and ring carrier (65) to a maximum temperature of
135°C (275°F) . Install ring carrier (67), ball bearing (68), and ring carrier (65) onto output shaft (31). - Install two ring seals (64) onto ring carrier (67). Install ring seal (66) onto ring carrier (65).
Show/hide table
Illustration 2 g00494747 - Heat inner bearing (69) to a maximum temperature of
135°C (275°F) . Install inner bearing (69) onto stator carrier (56). - Install retaining ring (70) onto stator carrier (56).
Show/hide table
Illustration 3 g00494681 - Position stator carrier (56), as shown. Install Tool (E) to the end of output shaft (31). Attach Tool (E) to a suitable lifting device and a hoist. Use Tool (E) and the hoist in order to position output shaft (31) into stator carrier (56). The weight of output shaft (31) is
25 kg (55 lb) . - Remove Tool (E) from the end of output shaft (31).
Show/hide table
Illustration 4 g00494712 Show/hide tableNOTICE Make sure that the oil passages in the fluid distributor are aligned with the fluid passages in the stator carrier. Failure to align the fluid passages may damage the torque converter.
- If necessary, install O-ring plug (63) and the O-ring seal onto fluid distributor (61).
- Install lip seal (62) into fluid distributor (61). Refer to Reuse and Salvage Guidelines, "Lip Type Seals"SEBF9247 for the proper lip seal installation procedure.
Note: Make sure that the lip of the lip seal is down. Lubricate the sealing lip lightly with the lubricant that is being sealed.
- Use 11 bolts (60) to install fluid distributor (61) and the gasket onto stator carrier (56). Tighten 11 bolts (60) to a torque
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 5 g00494123 - Position yoke (59) onto the output shaft. Install bolt (57), retainer (58) and the O-ring seal. Tighten bolt (57) to a torque of
240 ± 25 N·m (175 ± 20 lb ft) .Show/hide tableIllustration 6 g00494080 - Rotate stator carrier (56). Install two ring seals (55) onto stator carrier (56).
- Position freewheel race (53) and split washer (54) onto stator carrier (56).
- Use six bolts (52) to install split washer (54) and freewheel race (53) to stator carrier (56). Tighten six bolts (52) to a torque of
30 ± 5 N·m (22 ± 4 lb ft) .Show/hide tableIllustration 7 g00494822 - Use eight twelve point bolts (50) to install pump drive gear (49) to converter impeller assembly (41). Tighten eight twelve point bolts (50) to a torque of
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 8 g00494017 - Position converter impeller assembly (41) onto housing (7). Install 24 bolts (48) and the washers. Hand tighten 24 bolts (48).
Show/hide table
Illustration 9 g00494840 - Position converter impeller assembly (41), as shown. Lower the temperature of wear sleeve (51) to a temperature of
−40°C (−40°F) . Use Tooling (B) (not shown) to install wear sleeve (51) into the bore of converter impeller assembly (41).Show/hide tableIllustration 10 g00495825 - Use eight bolts (43) to install impeller hub assembly (44) to converter impeller assembly (41). Tighten eight bolts (43) to a torque of
50 ± 7 N·m (37 ± 5 lb ft) . - Install wear sleeve (45) and thrust race (46) onto impeller hub assembly (44).
- Apply 4C-4030 Thread Lock Compound to the threads of two hex socket screws (47). Install two hex socket screws (47) and the retaining washers.
Show/hide table
Illustration 11 g00494017 - Position housing (7) and converter impeller assembly (41), as shown. Tighten 24 bolts (48) to a torque of
80 ± 10 N·m (59 ± 7 lb ft) .Show/hide tableIllustration 12 g00493823 - Position housing (7), as shown. Install Tooling (A) to housing (7). Attach Tooling (A) to a suitable lifting device and a hoist. Use Tooling (A) and the hoist to position housing (7) and converter impeller assembly (41) onto output shaft (31). The weight of housing (7) and converter impeller assembly (41) as an assembly is
80 kg (176 lb) . - Remove Tooling (A) from housing (7).
Show/hide table
Illustration 13 g00494885 - Install thrust bearing (42).
Show/hide table
Illustration 14 g00559412 - Install retaining ring (35) into converter stator (32).
- Rotate converter stator (32). Lower the temperature of freewheel cam (40) to a temperature of
−40°C (−40°F) . Raise the temperature of converter stator (32) to a maximum temperature of135°C (275°F) . - Use Tooling (B) (not shown) to install freewheel cam (40) into converter stator (32), as shown.
Show/hide table
Illustration 15 g00559423 - Install side plate (39) into converter stator (32). Stake two opposite teeth of side plate (39) to hold side plate (39) in position.
Show/hide table
Illustration 16 g00559448 - Position converter stator (32), as shown. Install roller cage (37) into converter stator (32), as shown. Install two new springs (38).
Note: Only new springs (38) should be used.
Show/hide tableIllustration 17 g00494889 - Install 22 freewheel rollers (36) into roller cage (37).
Note: Apply 1P-0808 Multipurpose Grease to freewheel rollers (36) to hold freewheel rollers (36) in position.
Show/hide tableIllustration 18 g00494900 - Install side plate (34) onto converter stator (32).
- Install retaining ring (35) onto converter stator (32).
Show/hide table
Illustration 19 g00493762 Show/hide tableIllustration 20 g00493753 - Install converter stator (32) and thrust bearing (33) onto output shaft (31), as shown.
Note: The converter stator should only rotate in the clockwise direction.
- Use Tool (C) to install retaining ring (30) onto output shaft (31).
Show/hide table
Illustration 21 g00494972 - Install sleeve bearing (27) into turbine hub assembly (26).
- Install sleeve (28) and thrust race (29) into turbine hub assembly (26).
Show/hide table
Illustration 22 g00495054 Show/hide tableIllustration 23 g00493639 Show/hide tableIllustration 24 g00495256 - Install turbine hub assembly (26) onto converter turbine (25). Use two 1/2 inch - 13 NC guide bolts (X) to align the splines of turbine hub assembly (26) with the splines of converter turbine (25).
- Position converter turbine (25), as shown. Use six bolts (24) to install clutch hub (20) onto converter turbine (25).
- Remove two 1/2 inch - 13 NC guide bolts (X).
- Install ring carrier (22) and race (23) onto converter turbine (25).
- Install seal ring (21) onto ring carrier (22).
- Install Tooling (D) to converter turbine (25). Attach Tooling (D) to a suitable lifting device and a hoist. Use Tooling (D) and the hoist to install converter turbine (25) onto housing (7). The weight of converter turbine is
34 kg (75 lb) . - Remove Tooling (D) from converter turbine (25). Install the remaining two bolts (24) to clutch hub (20). Tighten eight bolts (24) to a torque of
120 ± 15 N·m (89 ± 11 lb ft) .Show/hide tableIllustration 25 g00493626 - Install ball bearing (18) and wear sleeve (17) into clutch carrier (3).
- Install seal ring (19) onto clutch carrier (3). Install seal ring (16) onto lockup clutch piston (15).
Show/hide table
Illustration 26 g00493625 Note: Two bolts (1) may be installed to provide a lifting point for the lockup clutch piston.
- Install lockup clutch piston (15) into clutch carrier (3).
Show/hide table
Illustration 27 g00493623 - Install three friction discs (13) and two clutch plates (14) into clutch carrier (3).
Note: Start with a friction disc. Alternate the friction discs and the clutch plates.
Show/hide tableIllustration 28 g00495384 - Install backing plate (10) into clutch carrier (3). Use 12 bolts (12) to install four split washers (11). Tighten 12 bolts (12) to a torque of
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 29 g00507749 - Position clutch carrier (3), as shown. Install Tooling (A) to clutch carrier. Attach Tooling (A) to a suitable lifting device and a hoist. Use Tooling (A) and the hoist to install clutch carrier (3) onto housing (7), as shown. The weight of clutch carrier (3) is
104 kg (229 lb) .Note: The internal splines of the friction discs will need to be aligned with the clutch hub that is on the turbine assembly.
- Remove Tooling (A) from clutch carrier (3).
Show/hide table
Illustration 30 g00495482 - Install 24 bolts (6) to install clutch carrier (3) to the housing. Tighten 24 bolts (6) to a torque of
240 ± 25 N·m (175 ± 20 lb ft) . - Use a brass drift to ensure that wear sleeve (17) and ball bearing (18) are fully seated.
Show/hide table
Illustration 31 g00495526 - Use three bolts (4) to install retainer (5) to the end of the output shaft. Tighten three bolts (4) to a torque of
25 N·m (18 lb ft) .Note: Do not install the O-ring seal and the shims now.
- Remove three bolts (4) and retainer (5).
Show/hide table
Illustration 32 g00495491 Show/hide tableIllustration 33 g00495531 - Use a depth micrometer to measure the distance from the top of ball bearing (18) to the top of output shaft (31). Record this measurement.
- Use the measurement that was recorded in Step 56 to determine the thickness of shim pack (71). Use a micrometer to assemble shim pack (71) so that there is a total gap of
.005 mm (0.0002 inch) to.13 mm (0.0051 inch) . - Position shim pack (71) onto the end of output shaft (31).
Show/hide table
Illustration 34 g06365711 - Use three bolts (4) to install retainer (5) and the O-ring seal to the end of the output shaft. Tighten three bolts (4) to a torque of
120 ± 15 N·m (89 ± 11 lb ft) . Install pipe plug (8) and orifice plug (9).Show/hide tableIllustration 35 g00493378 - Use 12 bolts (1) to install flywheel pilot (2) to clutch carrier (3). Tighten 12 bolts (1) to a torque of
120 ± 15 N·m (89 ± 11 lb ft) .
Note: Cleanliness is an important factor. Before the assembly procedure, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble.
End By:
- Install the torque converter.