Valve (Suspension Cylinder Charging) - Disassemble
Disassembly Procedure
Start By:
- Remove the charging valve (suspension cylinder). Refer to Disassembly and Assembly, "Valve (Suspension Cylinder Charging - Remove and Install" for the correct procedure.
- Position charging valve (1) on a suitable work bench.
Show/hide table
Illustration 1 | g00462790 |
- Remove two O-ring seals (2) from manifold (3) .
- Remove valve assembly (4) and washer (5) from manifold (3) .
Show/hide table
Illustration 2 | g00462847 |
- Remove valve assembly (6) and washer (7) from manifold (3) .
- Loosen two bolts (8) in order to separate manifold (3) from pressure sensor (9) of VIMS for the suspension cylinder.
Show/hide table
Illustration 3 | g00462867 |
- Remove check valve assembly (10) from manifold (3) .
Show/hide table
Illustration 4 | g00462868 |
- Remove O-ring seal (11), O-ring seal (13), and ring (14) from check valve (12) .
Show/hide table
Illustration 5 | g00462869 |
Caterpillar Information System:
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Lift Cylinder - Remove
CP-563D, CS-563D, CS-573D and CS-583D Vibratory Compactors Propel System Propel System Troubleshooting
784C, 785C and 785C HAA Off-Highway Truck/Tractors Power Train Rotary Actuator (Transmission)
793B Off-Highway Truck Power Train Transmission Clutch Engagement
IT14G Integrated Toolcarrier and 914G Wheel Loader Braking System Inching Valve - Test
CP-563D, CS-563D, CS-573D and CS-583D Vibratory Compactors Vibratory System Piston Motor Case Drain Flow - Test and Adjust
966G Wheel Loader and 972G Wheel Loader Power Train Relief Valve (Torque Converter Inlet)
793C Off-Highway Truck Machine Systems Truck Body Retaining Cable - Remove and Install
793C Off-Highway Truck Machine Systems Suspension Seat - Remove and Install
550, 570 and 580 Wheel Harvesters Piston Motor (Swing Drive) - Install
550, 570 and 580 Wheel Harvesters Piston Motor (Swing Drive) - Remove
CP-563D, CS-563D, CS-573D and CS-583D Vibratory Compactors Vibratory System Pump Servo Neutral - Adjust
793C Off-Highway Truck Machine Systems Valve (Suspension Cylinder Charging) - Assemble
789C Off-Highway Truck Machine Systems Resistor - Remove and Install
793C Off-Highway Truck Machine Systems Resistor Assembly - Remove and Install
D250E Series II and D300E Series II Articulated Trucks Machine Systems Hoist Control Valve - Remove
793C Off-Highway Truck Machine Systems Switch Assembly (Main Power) - Remove and Install
793B Off-Highway Truck Power Train Rear Axle and Final Drive System
789C Off-Highway Truck Power Train Electronic Control Module (Power Train)
IT14G Integrated Toolcarrier and 914G Wheel Loader Braking System General Information
IT14G Integrated Toolcarrier and 914G Wheel Loader Braking System General Information
IT14G Integrated Toolcarrier and 914G Wheel Loader Braking System Parking Brake - Manual Release
65E, 75E, 85E and 95E Agricultural Tractors Safety Signs and Labels
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Lift Cylinder - Install