326F Excavator Machine System Caterpillar


Relief Valve (Line) - Test and Adjust

Usage:

326F EBK

Specification

Table 1
"Relief Valve (Line) - Test and Adjust" 
  Machine Settings  Main Relief Pressure(1) 
Standard 35000 ± 500 kPa (5076 ± 73 psi)
Heavy lift 38000 ± 500 kPa (5512 ± 73 psi)
Cylinder  Cylinder Position  Engine Speed  Relief Pressure Setting  Actual 
Boom  Extended  Speed Dial "10"
AEC switch OFF 
40000 ± 500 kPa (5802 ± 73 psi)   
Retracted 37000 ± 500 kPa (5366 ± 73 psi) 
Stick  Extended  Speed Dial "10"
AEC switch OFF 
37000 ± 500 kPa (5366 ± 73 psi)   
Retracted 40000 ± 500 kPa (5802 ± 73 psi) 
Bucket  Extended  Speed Dial "10"
AEC switch OFF 
37000 ± 500 kPa (5366 ± 73 psi)   
Retracted  
VA Boom  Extended  Speed Dial "10"
AEC switch OFF 
37000 ± 500 kPa (5366 ± 73 psi)   
Retracted 40000 ± 500 kPa (5802 ± 73 psi) 
(1) System pressure setting before temporary setting adjustment

Introduction

The line relief valves are located between each cylinder and the respective control valve. The line relief valve limits the overload pressures that can be created in the implement cylinders. The line relief valves are located on the left side and right side of the main control valve. The line relief valves are accessible from above the main control valve and below the machine after removal of the access plate.

Required Tools



Illustration 1g02571852
Tooling group "A"
198-4240 Digital Pressure Indicator Gp

Table 2
Tool  Item  Part Number  Description  Qty 
198-4240  Digital Pressure Indicator Gp   
  A1  198-4234  Indicator 
A2 198-4239  Pressure Sensor 41,368 kPa (6,000 psi) 
A3 198-4236  Extension Cable 
  311-1362  Vacuum Transducer 

Machine Preparation

  1. Position the machine on level ground and stop the engine.

  2. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".


    Illustration 2g06234630
    Pump compartment
    (1) Pressure tap (delivery pressure for drive pump)
    (2) Pressure tap (delivery pressure for idler pump)

  3. Attach both 41,368 kPa (6,000 psi) pressure sensors to pressure tap (1) and pressure tap (2).

Test Procedure

Note: A temporary setting of the main relief valve is required before any line relief valves can be adjusted. Refer to Table 3 for temporary main relief setting for the function being tested.

Table 3
Function  Temporary Main Relief Setting 
Boom Cylinder Rod End  37000 ± 500 kPa (5366 ± 73 psi) 
Stick Cylinder Head End 
Bucket Cylinder Head End 
Bucket Cylinder Rod End 
VA Boom Cylinder Head End 
Boom Cylinder Head End  40000 ± 500 kPa (5802 ± 73 psi) 
Stick Cylinder Rod End 
VA Boom Cylinder Rod End 

Table 4
Relief Valve  Pressure Change With One Turn Of Adjustment Screw 
Main relief valve  14400 kPa (2100 psi) 
Line relief valves  19800 kPa (2871 psi) 

Note: Pressure values in Table 4 are approximate values. Use a pressure gauge for adjustment.

Bucket Cylinder Head End, Stick Cylinder Head End, and Bucket Cylinder Rod End

Note: A continuous relief of the valve for more than 10 seconds is not allowed.



Illustration 3g03688041
Main control valve
(3) Main relief valve
(4) Line relief valve for the boom cylinder rod end
(5) Line relief valve for the stick cylinder head end
(6) Line relief valve for the bucket cylinder rod end
(7) Line relief valve for the bucket cylinder head end

  1. Start the engine.

  2. Place the hydraulic activation control lever in the UNLOCKED position.

  3. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  4. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  5. Move the joystick for the stick until the stick is at the full STICK OUT position (full retraction of the stick cylinder).

  6. Check the main relief valve pressure setting at pressure tap (1) or pressure tap (2). The main relief valve pressure setting should be 35000 + 500 - 1000 kPa (5076 + 73 - 145 psi).


    Illustration 4g02102305
    Main relief valve (standard)
    (A) Adjustment screw
    (L) Locknut


    Illustration 5g02102306
    Main relief valve (heavy lift)
    (A) Adjustment screw
    (L) Locknut

  7. Loosen the locknut. Set the main relief pressure to 37000 ± 500 kPa (5366 ± 73 psi). Tighten the locknut.

    Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the adjustment screw counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  8. Verify the temporary main relief pressure setting with a second function. Move the joystick for the boom until the boom is at full BOOM RAISE position (full extension of the boom cylinder). The main relief pressure should be 37000 ± 500 kPa (5366 ± 73 psi).

  9. Mark the original position of the line relief for the bucket cylinder head end (7).

  10. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position (full extension of bucket cylinder).

  11. Check the pressure setting of the line relief for the bucket cylinder head end (7).

  12. Loosen the locknut of the bucket line relief valve. Turn adjustment screw of the bucket line relief valve until the pressure reading at pressure tap (1) is 35000 kPa (5076 psi).

  13. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position (full extension of bucket cylinder).

  14. Check the pressure setting of the line relief for the bucket cylinder head end (7).

  15. Turn the adjustment screw of the bucket line relief valve until the pressure reading at pressure tap (1) is 37000 ± 500 kPa (5366 ± 73 psi).

    Note: Always make final pressure adjustments on the pressure rise.

    Note: In order to prevent over setting, the adjustment should be stopped immediately after the pressure becomes within specification.

  16. Repeat Step 9 to Step 13 for the following line relief valves:

    • Line relief valve for stick cylinder head end

    • Line relief valve for bucket cylinder rod end

Boom Cylinder Rod End

Line Relief Valve Exchange

Note: This procedure can be used to adjust the boom rod line relief (4) when the boom cannot be retracted fully. This procedure will use the BUCKET OPEN circuit to adjust the line relief to proper specification.

Note: A continuous relief of the valve for more than 10 seconds is not allowed.



Illustration 6g03712283
Main control valve
(3) Main relief valve
(4) Line relief for the boom cylinder rod end
(6) Line relief for the bucket cylinder rod end

  1. Stop the engine.

  2. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".

  3. Attach 311-1362 Vacuum Cap onto the hydraulic tank. Attach an air supply onto the assembly. Apply 276 - 414 kPa (40 - 60 psi). This procedure will pull a vacuum on the hydraulic system.

  4. Remove the line relief valves for boom cylinder rod end (4) and bucket cylinder rod end (6) in order to exchange the valve locations.

  5. Install the line relief for the bucket cylinder rod end (6) into the BOOM DOWN circuit.

  6. Install the line relief for the boom cylinder rod end (4) into the BUCKET OPEN circuit.

  7. Start the engine.

  8. Place the hydraulic activation control lever in the UNLOCKED position.

  9. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  10. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  11. Move the joystick for the bucket until the bucket is at the full BUCKET OPEN position (full retraction of bucket cylinder).

  12. Check the pressure setting of the line relief for the bucket cylinder rod end (6).

  13. Loosen the locknut of the bucket line relief valve. Turn adjustment screw of the bucket line relief valve until the pressure reading at pressure tap (1) is 35000 kPa (5076 psi).

  14. Move the joystick for the bucket until the bucket is at the full BUCKET OPEN position (full retraction of bucket cylinder).

  15. Check the pressure setting of the line relief for the bucket cylinder rod end (6).

  16. Turn the adjustment screw of the bucket line relief valve until the pressure reading at pressure tap (1) is 37000 ± 500 kPa (5366 ± 73 psi).

    Note: Always make final pressure adjustments on the pressure rise.

    Note: In order to prevent over setting, the adjustment should be stopped immediately after the pressure becomes within specification.

  17. Tighten the locknut on the line relief valve.

  18. Stop the engine.

  19. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".

  20. Return the line relief valves to the original line relief locations.

  21. Reset main relief valve pressure setting to the normal operating condition after the completion of the line relief test and adjust. Refer to Testing and Adjusting, "Relief Valve (Main) - Test and Adjust".

Boom Cylinder Head End and Stick Cylinder Rod End

Note: A continuous relief of the valve for more than 10 seconds is not allowed.



Illustration 7g03700449
Main control valve
(3) Main relief valve
(8) Line relief valve for the boom cylinder head end
(9) Line relief valve for the stick cylinder rod end

  1. Mark the original position of the line relief valve for the stick cylinder rod end (9).

  2. Loosen the locknut for line relief valve (9). Turn the adjustment screw clockwise by one quarter turn. Tighten the locknut.

  3. Start the engine.

  4. Place the hydraulic activation control lever in the UNLOCKED position.

  5. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  6. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  7. Move the joystick for the stick until the stick is at the full STICK OUT position (full retraction of stick cylinder).

  8. Check the main relief valve pressure setting at pressure tap (1) or pressure tap (2). The main relief pressure setting should be 35000 + 500 - 1000 kPa (5076 + 73 - 145 psi).


    Illustration 8g02102305
    Main relief valve (standard)
    (A) Adjustment screw
    (L) Locknut


    Illustration 9g02102306
    Main relief valve (heavy lift)
    (A) Adjustment screw
    (L) Locknut

  9. Loosen the locknut. Set the main relief pressure to 40000 ± 500 kPa (5802 ± 73 psi). Tighten the locknut.

    Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the adjustment screw counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  10. Mark the original position of the line relief valve for the boom cylinder head end (8).

  11. Move the joystick for the boom until the boom is at the full BOOM RAISE position (full extension of boom cylinders).

  12. Check the pressure setting of the line relief valve for the boom cylinder head end (8).

  13. Loosen the locknut of the boom line relief valve. Turn adjustment screw of the boom line relief valve until the pressure reading at pressure tap (1) is 38000 kPa (5512 psi).

  14. Move the joystick for the boom until the boom is at the full BOOM RAISE position (full extension of boom cylinders).

  15. Check the pressure setting of the line relief valve for the boom cylinder head end (8).

  16. Turn the adjustment screw of the boom line relief valve until the pressure reading at pressure tap (1) is 40000 ± 500 kPa (5802 ± 73 psi).

    Note: Always make final pressure adjustments on the pressure rise.

    Note: In order to prevent over setting, the adjustment should be stopped immediately after the pressure becomes within specification.

  17. Move the joystick for the stick until the stick is at the full STICK OUT position (full retraction of stick cylinder).

  18. Check the pressure setting of the line relief for the stick cylinder rod end (9).

  19. Loosen the locknut for the stick line relief valve (9). Turn adjustment screw of the stick line relief valve counterclockwise until the pressure reading at pressure tap (1) is 38000 kPa (5512 psi).

  20. Move the joystick for the stick until the stick is at the full STICK OUT position (full retraction of stick cylinder).

  21. Check the pressure setting of the line relief for the stick cylinder rod end (9).

  22. Turn the adjustment screw of the stick line relief valve until the pressure reading at pressure tap (1) is 40000 ± 500 kPa (5802 ± 73 psi).

    Note: Always make final pressure adjustments on the pressure rise.

    Note: In order to prevent over setting, the adjustment should be stopped immediately after the pressure becomes within specification.

  23. Reset main relief valve pressure setting to the normal operating condition after the completion of the line relief test and adjust. Refer to Testing and Adjusting, "Relief Valve (Main) - Test and Adjust".

VA Boom Cylinder Head End

Note: A continuous relief of the valve for more than 10 seconds is not allowed.



Illustration 10g03328024
Main control valve
(3) Main relief valve
(10) Line relief valve for the va boom cylinder head end

  1. Mark the original position of the line relief valve for the va boom cylinder head end (10).

  2. Loosen the locknut for line relief valve (10). Turn the adjustment screw clockwise by one quarter turn. Tighten the locknut.

  3. Start the engine.

  4. Place the hydraulic activation control lever in the UNLOCKED position.

  5. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  6. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  7. Move the foot pedal for the va boom until the va boom is at the full VA BOOM UP position (full extension of va boom cylinder).

  8. Check the main relief valve pressure setting at pressure tap (1) or pressure tap (2). The main relief pressure setting should be 35000 ± 500 kPa (5076 ± 73 psi).


    Illustration 11g02102305
    Main relief valve (standard)
    (A) Adjustment screw
    (L) Locknut


    Illustration 12g02102306
    Main relief valve (heavy lift)
    (A) Adjustment screw
    (L) Locknut

  9. Loosen the locknut. Set the main relief pressure to 37000 ± 500 kPa (5366 ± 73 psi). Tighten the locknut.

    Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the adjustment screw counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  10. Move the foot pedal for the va boom until the va boom is at the full VA BOOM RAISE position (full extension of the va boom cylinder).

  11. Check the pressure setting of the line relief valve for the va boom cylinder head end (10).

  12. Loosen the locknut of the va boom line relief valve. Turn adjustment screw of the boom line relief valve until the pressure reading at pressure tap (1) is 35000 kPa (5076 psi).

  13. Move the foot pedal for the va boom until the va boom is at the full VA BOOM RAISE position (full extension of va boom cylinder).

  14. Check the pressure setting of the line relief valve for the va boom cylinder head end (10).

  15. Turn the adjustment screw of the boom line relief valve until the pressure reading at pressure tap (1) is 37000 ± 500 kPa (5366 ± 73 psi).

    Note: Always make final pressure adjustments on the pressure rise.

    Note: In order to prevent over setting, the adjustment should be stopped immediately after the pressure becomes within specification.

  16. Reset main relief valve pressure setting to the normal operating condition after the completion of the line relief test and adjust. Refer to Testing and Adjusting, "Relief Valve (Main) - Test and Adjust".

VA Boom Cylinder Rod End

Note: A continuous relief of the valve for more than 10 seconds is not allowed.



Illustration 13g03400855

  1. Mark the original position of the line relief valve for the va boom cylinder rod end (11).

  2. Loosen the locknut for line relief valve (11). Turn the adjustment screw clockwise by one quarter turn. Tighten the locknut.

  3. Start the engine.

  4. Place the hydraulic activation control lever in the UNLOCKED position.

  5. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  6. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  7. Move the foot pedal for the va boom until the va boom is at the full VA BOOM DOWN position (full retraction of va boom cylinder).

  8. Check the main relief valve pressure setting at pressure tap (1) or pressure tap (2). The main relief pressure setting should be 35000 ± 500 kPa (5076 ± 73 psi).


    Illustration 14g02102305
    Main relief valve (standard)
    (A) Adjustment screw
    (L) Locknut


    Illustration 15g02102306
    Main relief valve (heavy lift)
    (A) Adjustment screw
    (L) Locknut

  9. Loosen the locknut. Set the main relief pressure to 40000 ± 500 kPa (5802 ± 73 psi). Tighten the locknut.

    Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the adjustment screw counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  10. Move the foot pedal for the va boom until the va boom is at the full VA BOOM DOWN position (full retraction of the va boom cylinder).

  11. Check the pressure setting of the line relief valve for the va boom cylinder rod end (10).

  12. Loosen the locknut of the va boom line relief valve. Turn adjustment screw of the boom line relief valve until the pressure reading at pressure tap (1) is 38000 kPa (5511 psi).

  13. Move the foot pedal for the va boom until the va boom is at the full VA BOOM DOWN position (full retraction of va boom cylinder).

  14. Check the pressure setting of the line relief valve for the va boom cylinder rod end (10).

  15. Turn the adjustment screw of the boom line relief valve until the pressure reading at pressure tap (1) is 40000 ± 500 kPa (5802 ± 73 psi).

    Note: Always make final pressure adjustments on the pressure rise.

    Note: In order to prevent over setting, the adjustment should be stopped immediately after the pressure becomes within specification.

  16. Reset main relief valve pressure setting to the normal operating condition after the completion of the line relief test and adjust. Refer to Testing and Adjusting, "Relief Valve (Main) - Test and Adjust".

Adjustment Procedure



Illustration 16g02068598
Line relief valve (typical example)
(L) Locknut
(A) Adjustment screw

  1. Loosen locknut and turn adjustment screw in order to increase or decrease pressure.

    Note: Turn the adjustment screw clockwise in order to increase pressure. Turn adjustment screw counterclockwise in order to decrease pressure.

    Note: Always make final pressure adjustments on the pressure rise.

  2. Tighten the locknut to specification once adjustments are complete.

Caterpillar Information System:

326F Excavator Machine System Relief Valve (Main) - Test and Adjust
323F LN Excavator Machine Systems Solenoid Valve (Proportional Reducing) - Calibrate - Negative Flow Control
323F LN Excavator Machine Systems Solenoid Valve (Proportional Reducing) - Calibrate - Power Shift Pressure
797F Off-Highway Truck Air Dryer Desiccant - Replace
C32 Generator Set Engines Vibration Damper - Check
C32 Generator Set Engines Engine Oil Pressure - Test
797F Off-Highway Truck Air Dryer - Check
C32 Generator Set Engines Basic Engine
797F Off-Highway Truck Magnetic Plug (High Pressure Fuel Pump) - Check
C32 Generator Set Engines Cooling System
C32 Generator Set Engines Lubrication System
C32 Generator Set Engines Air Inlet and Exhaust System
336, 336 GC and 340 Excavator Systems Main Pump (Flow) - Test - Hydraulic Power
323F LN Excavator Machine Systems Relief Valve (Swing) - Test and Adjust
323F LN Excavator Machine Systems Main Pump (Flow) - Test - Hydraulic Power
323F LN Excavator Machine Systems Pump Control (Output Flow) - Test - One Pump Calibration (Optional Test)
336 Excavators (Powered by C9.3 Tier 4 Engine) Engine Supplement Electronic Control Module - Remove and Install
Improved Crankshafts are Now Used on Certain Cat® Engines {1202} Improved Crankshafts are Now Used on Certain Cat® Engines {1202}
Rain Water May Enter in Muffler/Silencers on Certain 3516 Power Modules {1062} Rain Water May Enter in Muffler/Silencers on Certain 3516 Power Modules {1062}
797F Off-Highway Truck Towing the Machine
C7.1 Commercial Marine Engine Cooling System
Procedure to Selection of Parts for Right Turbocharger to Clean Emissions Module (CEM) Inlet for Certain C175 Engines {1052, 1061, 108D} Procedure to Selection of Parts for Right Turbocharger to Clean Emissions Module (CEM) Inlet for Certain C175 Engines {1052, 1061, 108D}
Improved Bellows Fins and Exhaust Elbows are Now Used on Certain Cat® C175 Engines {1061} Improved Bellows Fins and Exhaust Elbows are Now Used on Certain Cat® C175 Engines {1061}
New Engine Software Is Now Used for Certain C32 Marine Engines {1920} New Engine Software Is Now Used for Certain C32 Marine Engines {1920}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.