C175-16 Locomotive Engine Caterpillar


High Pressure Fuel Rails - Remove and Install

Usage:

C175-16 3A9

Removal Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     339-9354     Cap Kit     1    
265-2256 Lint Free Wipes     1    

Start By:

  1. Remove the air inlet manifold.
  2. Remove Install the flow limiters.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products.

Dispose of all fluids according to local regulations and mandates.


------ WARNING! ------

Do not open the high pressure fuel system without allowing the fuel system to purge. After the engine has shut down, allow the fuel system to purge for ten minutes. This operating fuel system contains high pressure. Exposure to high pressure fuel can result in personal injury.

----------------------

Note: Do not remove all the quills at one time. To maintain alignment, leave a minimum of two quills attached to the fuel rail at all times. If necessary, replace with new quill.




    Illustration 1g01285837

  1. Remove bolt (1) and the clamp from tube assembly (2) .



    Illustration 2g03348199



    Illustration 3g01443406

    Note: Use Tooling (A) to cap tube assemblies, fittings, ports, and any opening in the fuel system to prevent contamination.

  1. Disconnect tube assembly (3) and remove the bolts on tube assembly (2) . Remove bolts (5) . Disconnect tube assembly (4) . Remove tube assembly (2) and the O-ring seals. Remove bolts (6) .

    Note: If necessary, remove secondary fuel filter lines in order to remove tube assembly (2) .




    Illustration 4g01285008



    Illustration 5g01822394

  1. Remove bolts (9) . Remove bolts (10) and bolts (11) . Repeat for the opposite side.

  1. Remove tube assembly (7) . Remove tube assembly (8) and the O-ring seal.



    Illustration 6g01822395

  1. Attach a suitable lifting device to fuel rail (13) . The weight of fuel rail (13) is approximately 60 kg (131 lb). Remove bolts (12) . Remove fuel rail (13) .

  1. Place the high-pressure fuel rail on a clean surface. Support the rail so the weight is not resting on the quills. All openings should be capped or plugged to prevent contamination.

  1. Repeat Steps 5 and 6 for the opposite side.

Installation Procedure

Note: Carefully remove Tooling (A) to prevent contamination.




    Illustration 7g01822395

  1. Attach a suitable lifting device onto fuel rail (13) . The weight of fuel rail (13) is approximately 60 kg (131 lb). Install fuel rail (13) . Install bolts (12) .



    Illustration 8g01443632

  1. Tighten bolts (12) in the sequence that is shown in Illustration 8. Tighten bolts (12) to a torque of 100 ± 20 N·m (74 ± 15 lb ft).



    Illustration 9g01822394



    Illustration 10g01285008

  1. Install the new O-ring seals. Lubricate the ends of tube assembly (8) and the O-ring seals with clean engine oil. Install new bolts (9) and the washers. Hand tighten new bolts (9) evenly to assemble tube assembly (8) to prevent cutting or damage to the O-ring seals. Install tube assembly (7) . Install and bolts (10) and (11) tighten by hand. Tighten new bolts (9) evenly to a torque of 20 N·m (177 lb in).

    Note: Do not rotate new bolts (9) more than 90 degrees at a time.

  1. Tighten new bolts (9) evenly to a torque of 40 ± 5 N·m (30 ± 4 lb ft).

    Note: Do not rotate new bolts (9) more than 45 degrees at a time.

  1. Tighten bolts (10) and (11) to a torque of 40 ± 10 N·m (30 ± 7 lb ft).



    Illustration 11g01443406



    Illustration 12g01822393

    Note: If necessary, secondary fuel filter lines may need installed after tube assembly (2) has been installed. Do not attempt to push the flanges past O-ring seals by hand in order to prevent cutting or damage.

  1. Install the new O-ring seals into the pump outlet, the inlet, and the junction block. Lubricate O-ring seals and the end of tube assemblies (2) and (4) with clean engine oil.

    Note: Do not rotate the bolts in tube assembly (2) more than 90 degrees at a time.

    1. Install new bolts (5) and the washers. Hand tighten new bolts (5) evenly to engage tube assemblies (2) and (4) to prevent damage of the O-ring seal.

    1. Install bolts (6) and tighten by hand. Hand tighten bolts (5) evenly. Tighten bolts (6) evenly to a torque of 20 N·m (15 lb ft).

    1. Tighten new bolts (5) evenly to a torque of 20 N·m (177 lb in).

    1. Tighten bolts (6) evenly to a final torque of 55 ± 10 N·m (41 ± 7 lb ft).

    1. Tighten bolts (5) evenly to a final torque of 40± 10 N·m (30± 7 lb ft).

    Note: Do not rotate the bolts in tube assembly (2) more than 45 degrees at a time.

  1. Tighten the bolts in tube assembly (2) evenly to a torque of 40 N·m (30 lb ft).



    Illustration 13g01285837

  1. Install the bracket, the clamp, and bolt (1) onto tube assembly (2) . Use the bracket to adjust the position of the clamp and bolt (1) for alignment to tube assembly (2) .

  1. Repeat this process on the opposite side.

End By:

  1. Install the flow limiters.
  2. Install the air inlet manifold.
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.