Modulating Valve (Transmission Clutch Engaging) - Assemble
组装步骤
- 将线圈组件 (3) 安装到调制阀 (1) 上。 将垫圈 (4) 和螺母 (5) 安装到调制阀 (1) 上。 拧紧螺母 (5) 至扭矩 13.0 ± 1.5 N·m (115.06 ± 13.28 lb in)。
Show/hide table
图 1 | g01433227 |
- 将接头 (2) 和 O 形密封圈安装到调制阀 (1) 上。 将接头 (2) 拧紧至扭矩为 14 ± 4 N·m (10 ± 3 lb ft)。
End By: 安装调节阀。
Caterpillar Information System:
320D Excavator System Pressure Release
C9 Petroleum Engines Engine Oil Pump - Disassemble
797F Off-Highway Truck Power Train Modulating Valve (Transmission Clutch Engaging) - Disassemble
C15 and C18 Petrolem Generator Set Engines Engine Top Speed Is Not Obtained
797F Off-Highway Truck Power Train Modulating Valve (Transmission Clutch Engaging) - Install
3176C Engine for Caterpillar Built Machines Diagnostic Capabilities
C15 and C18 Petrolem Generator Set Engines Engine Monitoring System
797F Off-Highway Truck Power Train Modulating Valve (Transmission Clutch Engaging) - Remove
3176C, 3406E and 3456 Industrial Engines ECM/Personality Module - Test
C9 Petroleum Engines Engine Oil Filter Base and Oil Cooler - Install
797F Off-Highway Truck Power Train Transmission Hydraulic Control - Assemble
797F Off-Highway Truck Power Train Transmission Hydraulic Control - Disassemble
C9 Petroleum Engines Engine Oil Pump - Assemble
797F Off-Highway Truck Power Train Relief Valve (Transmission Lubrication) - Remove
797F Off-Highway Truck Power Train Relief Valve (Transmission Lubrication) - Install
2008/08/01 An Improved Stud Is Now Used on High Pressure Turbochargers {1059}
G3500 Engines Vibration Damper Guard
G3500B Engines Vibration Damper Guard
C13 and C15 On-highway Engines Air System Verification Test
C9 Petroleum Engines Engine Oil Pump - Remove
C32 Petroleum Generator Sets Fuel System - Prime
C9 Petroleum Engines Engine Oil Pump - Install
C15 and C18 Petroleum Generator Sets Product Lifting
797F Off-Highway Truck Power Train Relief Valve (Transmission Main) - Remove