Introduction

Table 1
Revision History 
Revision  Summary of Changes 
03  Added prefixes K2D, HFB, D5T, LW5 

------ WARNING! ------

Do not operate or work on this machine unless you have read and understand the instructions and warnings in the Operation and Maintenance Manual. Failure to follow the instructions or heed the warnings could result in injury or death. Contact any Caterpillar dealer for replacement manuals. Proper care is your responsibility.


The following Special Instruction details the installation procedure for the 422-3309 Valve Kit (High Flow).

Note: If machine is currently equipped with a two-button only Right-Hand Joystick, the customer would need to purchase the two-button and thumb roller 379-1613 Joystick Control Gp (Right-Hand) separately as a serviceable part. This 379-1613 Joystick Control Gp (Right-Hand) will allow the customer to control the flow of operation of the machine with the thumb roller proportional feature.

Reference: Refer to Special Instruction, REHS8704 for instructions on installing the Right-Hand Joystick.

Removal Procedure of the Standard Flow Pump

  1. Raise the cab. Lock the cab into the upright position.

    Reference: Refer to the Operations and Maintenance Manual for further instruction.

    Note: The Machine must remain off during this entire procedure.

  2. Drain the fluid tank in order to avoid spills or injuries.

  3. Remove the 373-8426 Gear Pump Gp (Standard Flow).


      Illustration 1g03425436

    1. Remove the 345-5726 Hose As and the 148-8347 Elbow As from the right-hand side of the pump. Discard removed components.


    Illustration 2g03425472

  4. Disconnect the 388-8050 Hose As and the 148-8390 Elbow Gp in front of the Pump. Retain these components for reinstallation later in this procedure.

    Note: If the machine is equipped with ride control, remove the 345-5786 Hose As and the 148-8390 Elbow Gp in front of the pump. Retain these components for reinstallation later in this procedure.



    Illustration 3g03425477

  5. Remove the 343-6821 Clamps from both sides of the 435-8881 Hose.

  6. Remove the 435-8881 Hose and discard all of these components.


    Illustration 4g03466817

  7. Remove the 423-0437 Adapter As by removing the 8T-4121 Hard Washers and 8T-4195 Bolts. Retain the 423-0437 Adapter As for reinstallation.


    Illustration 5g03467002

  8. Remove the 8T-4956 Bolts and the 8T-4223 Hard Washers that attach the 373-8426 Gear Pump Gp (Standard Flow) to the 258-2405 Piston Pump Gp (HYDROSTATIC).

  9. Remove the 373-8426 Gear Pump Gp (Standard Flow) and discard.

Installation of the New High Flow Pump Group



    Illustration 6g03426020

  1. Install the 8T-5049 O-Ring Seal onto the face of the implement pump that connects to the hydrostatic pump.

  2. Install the 5P-3863 O-Ring Seal onto the face of the Implement Pump that connects to the Charge Pump.

    Note: Steps 1 and 2 must be completed before further installation.



    Illustration 7g03425942

  3. Mount the 358-5002 Piston Pump Gp onto the 258-2405 Piston Pump Gp (HYDROSTATIC). Use the 8T-4956 Bolts and the 8T-4223 Hard Washers to mount the pumps together.

  4. Verify that Pressure Port B and the Case Drain Port L2 on the Implement Pump face the right-hand side of the Machine. Verify that the Deutsch Connector faces the bottom of the Machine.


    Illustration 8g03426041

  5. Mount the 258-2555 Gear Pump Gp (HIGH FLOW) onto the implement pump. Use the two 101-7404 Bolts and two 8T-4121 Hard Washers. Verify that the Pressure Port B on the Pump faces the right-hand side of the Machine.


    Illustration 9g03426047

  6. Reinstall the 423-0437 Adapter As onto the Left-Hand side of the High Flow Pump using the provided 8T-4195 Bolts and 8T-4121 Hard Washers.


    Illustration 10g03426091

  7. Install the 435-8880 Hose with the widest end of the hose installed on the strainer port on the hydraulic tank and the other end installed on the adapter.


    Illustration 11g03426118

  8. Secure the hose to the strainer port on the hydraulic tank using the 343-6821 Band Clamp. Secure the hose to the adapter using a 347-4163 Band Clamp. Tighten both clamps to 7.5 ± 1 N·m (66 ± 9 lb in). Cap both clamps with a 323-3308 Cap after tightening.


    Illustration 12g03426136

  9. Reinstall the 388-8050 Hose As and the 148-8390 Elbow Gp onto Port B on the Charge Pump.

    Note: If the Machine is equipped with ride control, reinstall the 345-5786 Hose As and the 148-8390 Elbow Gp onto "Port B" on the pump.



    Illustration 13g03426156

  10. Install the 385-5779 Flange onto Port B of the implement pump. Use four 8T-6466 Bolts and four 8T-4121 Hard Washers to attach the flange to the pump.


    Illustration 14g03426164

  11. Connect the 345-4835 Hose As containing the 6V-9972 Permanent Coupling As onto the flange installed in Step 10.

  12. Connect the 6V-9969 Permanent Coupling As from the hose to the 148-8347 Elbow As located on the lower port of the implement valve. This location is nearest to the left-hand side of the machine.

High Flow Harness Connection Procedure



    Illustration 15g03426218

  1. Remove the 378-1029 Front Harness As connected to the implement valve. Discard the harness.


    Illustration 16g03615060

  2. Install the 378-1030 Solenoid Harness As onto the implement valve.


    Illustration 17g03426261

  3. Route the harness down towards the tubes from the tilt lines group in front of the firewall.


    Illustration 18g03426320

  4. Continue routing the harness along the 345-4835 Hose As so the harness reaches towards the bottom of the high flow pump.


    Illustration 19g03426326

  5. Plug the PV-C2 connector onto the deutsch connector Port on the pump.

    Note: Verify that the connections correspond to the ones shown on Table 2 below.

    Table 2
    High Flow Wire Harness 
    Connectors On Harness As.  Wire Number  Wire Color and Gauge  Position  Connects To 
    PV-C3  P978-PV5  GREEN-18  AUX A (3A) 
    H802-PV23 GRAY-18 
    PV-C4  P979-PV6  YELLOW-18  AUX B (3B) 
    H802-PV39 GRAY-18 
    PV-C5  P831-PV3  BROWN-18  LIFT HE-WORK PORT (RAISE) (2A) 
    H803-PV18 BLUE-18 
    PV-C6  P832-PV4  WHITE-18  LIFT RE-WORK PORT (LOWER) (2B) 
    H803-PV20 BLUE-18 
    PV-C7  P845-PV9  WHITE-18  TILT RE-WORK PORT (RACK) (1A) 
    H803-PV19 BLUE-18 
    PV-C8  P846-PV10  PINK-18  TILT HE-WORK PORT (DUMP) (1B) 
    H803-PV32 BLUE-18 
    PV-C2  A588-PV1  BLUE-18  PORT ON HIGH FLOW PUMP 
    200-PV2 BLACK-18 


    Illustration 20g03426328

  6. Mount the 4P-8134 Clip onto the existing bracket on the firewall. Attach the ladder clip to the bracket by using the existing bolt that is used to support the Bracket.


    Illustration 21g03426583

  7. Plug the 344-1678 Connector Plug As from the harness assembly onto the 344-1653 Receptacle As from the rear cab harness assembly. Secure this connection with one 7K-1181 Cable Strap.

    Note: Verify that the connections match the connections shown in Table 3.

    Table 3
    Control Valve to Cab Harness 
    IMPLEMENT VALVE HARNESS (PV-C1)  Position  CAB HARNESS (C-C3) 
    Wire Number  Wire Color and Gauge  Wire Number Wire Color and Gauge 
    A588-PV1  BLUE-18  A588-C110  GREEN-18 
    200-PV2  BLACK-18  200-C33  BLACK-18 
    P831-PV3  BROWN-18  P831-C14  BROWN-18 
    P832-PV4  WHITE-18  P832-C15  WHITE-18 
    P978-PV5  GREEN-18  P978-C22  GREEN-18 
    P979-PV6  YELLOW-18  P979-C23  YELLOW-18 
    H802-PV7  GRAY-16  H802-C137  GRAY-18 
    H803-PV8  BLUE-14  H803-C17  BLUE-16 
    H845-PV9  WHITE-18  H845-C12  WHITE-18 
    H846-PV10  PINK-18  10  H846-C13  PINK-18 


    Illustration 22g03426588

  8. Continue strapping the pump harness onto the rear cab harness using one 7K-1181 Cable Strap. Strap the harness to the added ladder clip using 3S-2093 Cable Strap.


    Illustration 23g03426633

  9. Use one 3S-2093 Cable Strap to attach the harness to the lower tube assembly from the tilt lines group.


    Illustration 24g03426642

  10. Continue strapping the harness onto the top portion of the previously installed 345-4835 Hose As with one 7K-1181 Cable Strap. Also strap the harness onto the end of the hose with one 3S-2093 Cable Strap.


    Illustration 25g03426688

  11. Finish by attaching the harness to the fitting on the 345-4835 Hose As that is connected to the implement pump.

Installation of Relay

  1. Remove the 345-6144 Cover As from the rear liner on the right-hand side of the cab in order to expose the fuse boxes.


    Illustration 26g03426183

  2. Insert the 146-9439 Relay As in the R5 position in the lower fuse box.

  3. Reinstall the fuse box cover.

Installation of Machine Film

  1. Ensure that the surface is clean and dry before placing the film.

  2. Install one 388-8112 Film right underneath the existing Film that contains the machine number on the right-hand side of the machine.


    Illustration 27g03426169

  3. Verify that the upper left corner of the film intersects the lower end of the diagonal line from the red stripe on the machine number film. Repeat this procedure on the left-hand side of the machine.

  4. Refill the hydraulic tank when installation is completed.

Machine Configuration

Note: Ensure that the 379-1613 Joystick Control Gp (Right Hand Joystick) , which contains the roller wheel for proportional flow control, is already installed on the machine. If changing the control group is necessary, refer to Special Instruction, REHS8704 for installation instructions.

The 422-3309 Valve Kit (High Flow) must be configured using Cat® Electronic Technician (Cat ET).

  1. With the key ON and engine off, using Cat ET, select the machine ECM.


    Illustration 28g03618997

  2. From the menu, select "Service", then "Configuration", and then "Implement Configuration".


    Illustration 29g03619020

  3. In the configuration screen, doubleclickon the "Auxiliary Hydraulic High Flow System Installation Status" link.


    Illustration 30g03619037

  4. In the pop-up window, change the New Value field to Installed. Click "OK".

  5. Turn the start key to the OFF position and wait at least 15 seconds. Turn the start key back to the ON position.

    Note: The new feature will be activated on the next power cycle.

  6. From the Cat ET menu, select "Service", then "Configuration", and then "Implement Configuration".


    Illustration 31g03620727

  7. In the configuration screen, doubleclickon the "Auxiliary Hydraulic High Flow System Installation Status" link. Ensure that the feature is set to Installed.

Caterpillar Information System:

D9T Track-Type Tractor Machine Systems Rollover Protective Structure (ROPS) - Remove and Install
PL83 and PL87 Pipelayers Machine Systems Piston Pump (Hydraulic Fan) - Assemble
PL83 and PL87 Pipelayers Machine Systems Piston Pump (Hydraulic Fan) - Disassemble
D10T2 Track-Type Tractor Engine Supplement Exhaust Cooler (NRS) - Remove and Install
980M Tier 4 and 982M Tier 4 Wheel Loaders Power Train Carrier Bearing (Drive Shaft) - Remove and Install
621K, 623K, and 627K Wheel Tractor-Scrapers Systems Hood - Front
980H Wheel Loader Power Train Power Train Guard (Transmission) - Remove and Install
980H Wheel Loader Power Train Crankcase Guard - Remove and Install
D6N Track-Type Tractor TA2 Technical Inspection{0372, 1000, 7000, 753T, 7565} D6N Track-Type Tractor TA2 Technical Inspection{0372, 1000, 7000, 753T, 7565}
836K Landfill Compactor, 834K Wheel Dozer and 988K Wheel Loader Power Train Gear Pump (Axle Oil Cooler) - Remove and Install
980H Wheel Loader Engine Supplement Engine Oil Pan - Remove and Install - In Chassis
901C, 902C and 903C Compact Wheel Loaders PowerTrain Differential (Limited Slip) - Remove
621K, 623K, and 627K Wheel Tractor-Scrapers Systems Battery and Wiring Group
349F and 352F Excavators ECM - Replace
966H and 972H Wheel Loaders PowerTrain Oscillating Axle (Rear) - Remove and Install
980M Tier 3, 982M Tier 3 and 980L Tier 3 Wheel Loader Power Train Drive Shaft (Center) - Remove and Install
854K Wheel Dozer and 992K Wheel Loader Power Train Sequence Valve - Test and Adjust
966H and 972H Wheel Loaders PowerTrain Fixed Axle (Front) - Remove and Install
980H Wheel Loader Engine Supplement Fuel Filter (Secondary) and Fuel Filter Base - Remove and Install
836K Landfill Compactor, 834K Wheel Dozer and 988K Wheel Loader C18 Engine Supplement Fuel Tank - Remove and Install
2013/08/26 New Software Is Now Used on Certain Medium Wheel Loaders {7610, 7620}
966H and 972H Wheel Loaders PowerTrain Heat Exchanger (Axle Oil Cooler) - Remove and Install
966H and 972H Wheel Loaders PowerTrain Control Manifold (Axle Oil Flow Divider) - Remove and Install
966H and 972H Wheel Loaders PowerTrain Modulating Valve (Transmission Clutch) - Remove and Install
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.