UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Caterpillar


4 Wire Out Voltage - Calibrate

Usage:

ES12F CZE
The following instructions explain the procedure that is used in order to calibrate the 4-Wire Out Voltages for the UPS 1200. These voltages are measured at the 4-Wire Transformer cabinet.

The calibration needs to be done when the External Source Sync (ESS) board has been replaced.

------ WARNING! ------

Personal injury or death can result from high voltage.

When power generation equipment must be in operation to make tests and/or adjustments, high voltage and current are present.

Improper test equipment can fail and present a high voltage shock hazard to its user.

Use electrical safety gloves when you are working in the cabinets.

Make sure the testing equipment is designed for and correctly operated for high voltage and current tests being made.

----------------------



Illustration 1g01304449

Perform the following steps in order to calibrate the AC voltages.

  1. Connect a PC to the UPS. Refer to Systems Operation, Test and Adjust, REHS7654, "Personal Computer to UPS Connection" .

  1. Open the doors to the 4-Wire Transformer cabinet.



    Illustration 2g01300850

    4-Wire Out Voltages Selection

  1. Open the "Calibrate" drop-down menu in UPS View.

  1. Select "4 Wire Out Voltages" from the "Calibrate" drop-down menu.

    The "Calibration of a Channel" dialog which is shown in Illustration 3 appears.




    Illustration 3g01300851

    "Calibration of a channel"

  1. Click the "Use Defaults"button in the "Calibration of a Channel" dialog.

  1. Attach the positive probe from a multimeter to the Phase A bus bar in the 4-Wire transformer cabinet. Attach the negative probe to the Phase B bus bar.

    Referencerefer to illustration 5 in order to identify the bus bars.




    Illustration 4g01298244

    Multimeter Probes

    Note: Attach the probes to any flat section of the bus bar. Do not attach the probes to bolts. Some bolts may be insulated.




    Illustration 5g01300855

    (1) Phase C

    (2) Phase B

    (3) Phase A

    (4) Neutral

  1. Enter the value that is indicated by the multimeter in the "Enter Calibration Point" field.



    Illustration 6g01300897

    Entering the Calibration for Phase A and Phase B

  1. Click the "OK" button.

  1. Move the positive probe to the Phase C bus bar.

  1. Enter the value that is indicated by the multimeter in the "Enter Calibration Point" field.



    Illustration 7g01300894

    Enter the value for Phase C.

  1. Click the "OK" button.

  1. Move the positive probe to the neutral bus bar.

  1. Enter the value that is indicated by the multimeter in the "Enter Calibration Point" field.



    Illustration 8g01300898

  1. Click the "OK" button.

  1. Click the "View Status" button.



    Illustration 9g01300901

    Completed "Calibration status"

  1. Click the "Save" button.

The 4-Wire Out Voltage calibration is now complete.

Caterpillar Information System:

2006/10/23 Improved Head Gasket {1100, 1124}
2006/09/04 A New Torque Specification For the Cap Nuts on Fuel Injectors is Now Used {1120, 1290, 1408}
CX31 On-Highway Transmission Power Train Pump Drive - Remove - Rear PTO Shaft
2007/10/01 Correct Installation Procedure for the 235-1448 Tube As {1304, 1306}
307D, 311D, 312D, 313D, 315D, 318D, 319D, 320D, 323D, 324D, 325D, 326D, 328D, 329D, 330D, 336D, 340D, 345D, 349D, 374D, 390D and M325D Excavators Air Conditioning and Heating Actuator (Air Conditioner Control)
2006/09/11 A New Clamp for the Air Cleaner is Used {1051}
TH31-C9I, TH31-C9P, TH31-C9T, TH35-C13I, TH35-C13T, TH35-C15I and TH35-C15T Petroleum Power Train Packages and TH31-E61 and TH35-E81 Petroleum Transmissions Transmission Solenoid and Relief Valve (Output Transfer Gears) - Drop Box) (12 Volt
C0.5, C0.7, C1.1, C1.5, C1.6 and C2.2 Industrial Engines Fuel System - Prime
C280-12 and C280–16 Marine Engines Cylinder Head - Remove
3516C Locomotive Engine Speed Sensor - Clean/Inspect
3500 Engines Fumes Disposal System
3516C Locomotive Engine Engine Air Cleaner Service Indicator - Inspect
C175-16 Locomotive Engine ECM - Replace
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys In Current - Calibrate
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys AC Output Current - Calibrate
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys 4 Wire Output Current - Calibrate
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Flywheel DC Bus Voltage - Calibrate
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Flywheel Load Cell - Calibrate
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Flywheel Field Coil Current - Calibrate
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Flywheel DC Bus Current - Calibrate
C280-12 and C280–16 Marine Engines Cylinder Head - Install
C11 and C13 Engines and 14M and 16M Motor Graders Electronic Service Tool Does Not Communicate
2006/10/02 Improved Instrument Panels are Used {7451}
C11 and C13 Engines and 14M and 16M Motor Graders System Overview
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.