Idler
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 1U-7498 | Support Stand As | 2 |
B | 1U-9200 | Lever Puller Hoist | 1 |
Note: Cleanliness is an important factor. Before you begin the removal procedure, thoroughly clean the exterior of the components. This will help to prevent dirt from entering the internal mechanism.
- Place suitable blocking under track assembly (1).
Show/hide table
Illustration 2 g01361773 - Raise the blade . Position Tooling (A) under the blade and lower the blade onto Tooling (A).
Show/hide table
Illustration 3 g01361776 - Separate track assembly (1). Refer to Disassembly and Assembly, "Track".
- Attach Tooling (B) and a suitable strap to track assembly (1). Use Tooling (B ) and a suitable strap in order to position track assembly (1) away from the idler assembly.
Show/hide table
Illustration 4 g01361791 - Remove plates (2). Remove guard (3).
Show/hide table
Illustration 5 g01411026 - Remove brackets (4).
Show/hide table
Illustration 6 g01361802 - Attach a suitable lifting device to front idler (5) in order to position front idler (5) forward. The weight of front idler (5) is approximately
159 kg (350 lb) .Show/hide tableIllustration 7 g01361807 - Attach an additional suitable lifting device and Tooling (B) to front idler (5). Remove front idler (5).
Show/hide table
Illustration 8 g01361824 Note: Note the location and the number of shims for installation purposes.
- If necessary, remove bolts (6), shims (7), and wear strips (8).
Show/hide table
Illustration 1 | g01361771 |
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 1U-7498 | Support Stand As | 2 |
B | 1U-9200 | Lever Puller Hoist | 1 |
- If necessary, install wear strips (8), shims (7), and bolts (6).
- Position the shims in order to obtain approximately
2.0 mm (0.08 inch) clearance for Dimension (X).Show/hide tableIllustration 11 g01361807 - Attach suitable lifting devices and Tooling (B) to front idler (5). The weight of front idler (5) is approximately
159 kg (350 lb) . - Install front idler (5).
Show/hide table
Illustration 12 g01361802 - Remove Tooling (B) and continue installing front idler (5). Remove the suitable lifting device.
Show/hide table
Illustration 13 g01411026 - Install brackets (4).
Show/hide table
Illustration 14 g01361791 - Install guard (3). Install plates (2).
Show/hide table
Illustration 15 g01361776 - Use Tooling (B ) and a suitable strap in order to position track assembly (1) onto the idler assembly.
- Connect track assembly (1). Refer to Disassembly and Assembly, "Track".
Show/hide table
Illustration 16 g01361773 - Raise the blade . Remove Tooling (A). Lower the blade.
Show/hide table
Illustration 17 g01361771 - Remove suitable blocking under track assembly (1).
Show/hide table
Illustration 9 | g01361824 |
Show/hide table
Illustration 10 | g01361764 |
Note: To position the front idler, refer to Operation and Maintenance Manual, "Front Idler Position - Check and Adjust".
Caterpillar Information System:
Updated Ride Control Accumulator Test and Charge Instructions for Large Wheel Loaders{5077, 5077} Updated Ride Control Accumulator Test and Charge Instructions for Large Wheel Loaders{5077, 5077}
992K Wheel Loader and 854K Wheel Dozer Steering System Steering Control Valve
992K Wheel Loader and 854K Wheel Dozer Steering System Piston Pump (Steering)
C3.4B Engines For Caterpillar Built Machines Fuel Filter Base - Primary Fuel Filter Base
992K Wheel Loader Engine Oil Level - Check
320E and 323E Excavators Machine System Specifications Relief Valve (Negative Flow Control)
950K and 962K Wheel Loaders Power Train Torque Converter Stall - Test
C13, C15, and C18 Tier 4 Final Engines Turbocharger
(Custom) Log Fork Specifications
Installation of 9SU (S/N: DKX) and 9U (S/N: DKZ) Bulldozer with Single and Dual Tilt Cylinder {5057, 5104, 6050, 6053, 6060, 6078} Installation of 9SU (S/N: DKX) and 9U (S/N: DKZ) Bulldozer with Single and Dual Tilt Cylinder {5057, 5104, 6050, 6053, 6060, 6078}
854K Wheel Dozer and 992K Wheel Loader Hood and Engine Enclosure - Install
992K Wheel Loader and 854K Wheel Dozer Steering System Steering Pilot System
793F CMD Off-Highway Truck Steering Electronic Control System Electronic Control Module (ECM) - Flash Program
992K Wheel Loader and 854K Wheel Dozer Steering System Hydraulic Oil Contamination - Test
854K Wheel Dozer and 992K Wheel Loader Air Cleaner - Remove and Install
992K Wheel Loader and 854K Wheel Dozer Steering System Pressure Tap Locations
621H, 623H and 627H Wheel Tractor-Scrapers Power Train Transmission Oil Pump Pressure - Test - Rear Power Train
950M, 962M, 950M Z and 962M Z Wheel Loaders Radiator Top Tank - Remove and Install
2470C, 2570C and 2670C Wheel Feller Bunchers Power Train Pressure Switch (Parking Brake)
992K Wheel Loader and 854K Wheel Dozer Steering System Steering System Pressure (High Pressure Stall) - Test and Adjust
C32 Auxiliary Engine Cold Weather Starting
994F and 994H Wheel Loaders Automatic Lubrication System Pressure Sensor (Automatic Lubrication)
621H, 623H and 627H Wheel Tractor-Scrapers Power Train Transmission Lubrication Oil Pressure - Test
992K Wheel Loader Engine Oil and Filter - Change