Installation of No. 9 Ripper (1NH, 1PH){6311, 6312} Caterpillar


Installation of No. 9 Ripper (1NH, 1PH){6311, 6312}

Usage:

D9N ( 1JD1-Up)

Introduction

This Special Instruction provides the necessary procedure for installing a single-shank ripper (1PH) and mechanical or hydraulic pin puller on a D9N Tractor. Installation of a multishank ripper (1NH) is similar.

NOTE: Each section contains the related parts list.

After the assembly is complete, prepare the machine for service as shown in the machine's Operation & Maintenance Manual.

Do not perform any procedure, outlined in this publication, or order any parts until you read and understand the information contained within.

Reference: Service Manual, Parts Manual and Operation & Maintenance Manual.

------ WARNING! ------

Do not attempt to assemble this machine until you have read and understand the assembly instructions. Improper procedures could result in injury or death.

-------WARNING!-------


NOTICE

Do not let any dirt or foreign material get into the hydraulic system during assembly or maintenance operation. Keep the oil in the hydraulic system at the correct level to prevent pump cavitation.


Weights


NOTICE

When a hoist is used to lift any part or assembly, stand clear of the area. Always make sure the hoist has the correct capacity. Approximate weights of the components are shown in the chart which follows.


Installation of Ripper

Necessary Parts

NOTE: Clean all surfaces where parts are to be installed, including removal of paint from mating surfaces.

Installation Procedure

1. Remove the draw bar and the guard assembly from the machine (if equipped). The guard assembly is not reused and may be discarded.

2. Install four seals (1) (with the lips to the outside) to case assembly (A).

3. Install frame assembly (2) to case assembly (A) with eight washers (3) (see note below), two pin assemblies (4), two plates (5), and four bolts (6). Assemble two plugs (2A) (not shown) to (bosses) frame assembly (2).

NOTE: To eliminate side movement of frame assembly (2) during operation, use washers (3) evenly on both sides as required between case assembly (A) and frame assembly (2).

4. Place stands (supports) under frame assembly (2) to hold it in a level position during assembly.

5. Install plug (7) and washer (8) to pin assembly (4). Install elbow (9) to plug (7) with seal (10). Tighten plug (7) to a torque of 370 ± 50 N·m (270 ± 37 lb ft).

6. Connect hose assembly (11) to elbow (9) with seal (12).

7. Repeat Steps 5 and 6 for the other side of the machine.

8. Install two fittings (13) and two elbows (9) with two seals (10) to guard assembly (17).

9. Install guard assembly (14) to case assembly (A) with six washers (15) and six bolts (16).

10. Connect other end of hose assembly (11) [during installation of guard assembly (17) Step 12] to elbow (9) with seal (12).

11. Repeat Step 10 for the other side of the machine.

12. Install guard assembly (17) to guard assembly (14) with four washers (15) and four bolts (16).

13. Install two blocks (18) to guard assembly (17) with four washers (19) and four bolts (16).

NOTE: Remove all paint and dirt from the mounting faces of plate assemblies (20) and (23), and the mounting area on the rear of case assembly (A).

14. Install plate assembly (20) to case assembly (A) with six washers (21) and six bolts (22). Tighten bolts (22) to a torque of 3100 ± 350 N·m (2280 ± 260 lb ft).

15. Install plate assembly (23) to case assembly (A) with six washers (21) and six bolts (22). Tighten bolts (22) to a torque of 3100 ± 350 N·m (2280 ± 260 lb ft).

16. Install plate (24) to guard assembly (17) with four washers (25) and four bolts (26).

17. Install four seals (27) (with the lips to the outside in both ends) to cylinder group (28).

NOTE: The lift cylinders should be installed so that the hose connections are face up.

18. Install lift cylinder group (28) to plate assembly (23) (left side) with pin assembly (29), tube (30), plate (31), and two bolts (32).

19. Repeat Steps 17 and 18 for [plate assembly (20)] the right side of the machine.



(B) Rod end. (C) Head end.

20. Connect hose assemblies (33) and (34) to lift cylinder-RH (28) with two seals (37), four flanges (38), eight washers (39), and eight bolts (40). Tighten bolts (40) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

21. Connect hose assemblies (33) and (34) to the ripper control valve with two seals (37), four flanges, eight washers, and eight bolts. Tighten bolts to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

NOTE: The items not numbered are part of the ripper control valve.



(B) Rod end. (C) Head end. (right side shown)



(B) Rod end. (C) Head end.

22. Connect hose assemblies (35) and (36) to lift cylinder-LH (28) with two seals (37), four flanges (38), eight washers (39), and eight bolts (40). Tighten bolts (40) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

23. Connect hose assemblies (35) and (36) to the ripper control valve with two seals (37), four flanges, eight washers, and eight bolts. Tighten eight bolts to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

NOTE: The items not numbered are part of the ripper control valve.

24. Install lift cylinder (28) to frame assembly (2) with pin assembly (41), plate (5) and two bolts (6).

25. Repeat Step 24 for the other side of the machine.

26. Install four seals (27) (with the lips to the outside in both ends) to tilt cylinder group (42).

NOTE: The tilt cylinders should be installed so that the hose connections are face up.

27. Install tilt cylinder group (42) to plate assembly (20) (left side) with pin assembly (43), plate (31) and two bolts (32).

28. Repeat Steps 26 and 27 for [plate assembly (23)] the right side of the machine.



(D) Head end. (E) Rod end.

29. Connect hose assemblies (44) and (45) to tilt cylinder-RH (42) with two seals (48), four flanges (49), eight washers (39), and eight bolts (40). Tighten bolts (40) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).



(D) Head end. (E) Rod end.

30. Connect hose assemblies (44) and (45) to the ripper control valve with two seals (37), four flanges, eight washers, and eight bolts. Tighten eight bolts to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

NOTE: The items not numbered are part of the ripper control valve.



(D) Head end. (E) Rod end. (right side shown)



(D) Head end. (E) Rod end.

31. Connect hose assemblies (46) and (47) to tilt cylinder-LH (42) with two seals (48), four flanges (49), eight washers (39), and eight bolts (40). Tighten bolts (40) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).



(D) Head end. (E) Rod end.

32. Connect hose assemblies (46) and (47) to the ripper control valve with two seals (37), four flanges, eight washers, and eight bolts. Tighten eight bolts to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

NOTE: The items not numbered are part of the ripper control valve.

33. Install four seals (1) (with the lips to the outside) to frame assembly (2).

34. Install carriage assembly (50) to frame assembly (2) with eight washers (51) (see note below), two pin assemblies (52), two plates (5), and four bolts (6).

NOTE: To eliminate side movement of carriage assembly (50) during operation, use washers (51) evenly on both sides as required between frame assembly (2) and carriage assembly (50).

35. Install tilt cylinder (42) to carriage assembly (50) with pin assembly (53), plate (5), and two bolts (6).

36. Repeat Step 35 for the other side of the machine.

NOTE: Install the hydraulic pin puller before installing tooth group (54). (See Installation of Pin Puller in this Special Instruction).

37. Install tooth group (54) to carriage assembly (50) with pin (55) and two pin assemblies (56).

38. Lubricate 12 fittings on the ripper with multipurpose-type grease (MPGM). Refer to the Operation and Maintenance Manual for maintenance intervals.

39. Cycle lift and tilt cylinders full stroke in both directions several times. Check all connections for leaks and make repairs if necessary.

40. Check hydraulic oil tank level. If necessary, add oil to maintain the level at the FULL mark on the sight gauge.

Installation of Pin Puller

Necessary Parts

1. Remove pin assemblies (A) and pin (B). These parts are not reused and may be discarded.


Typical Example (earlier model shown)

2. Install bracket assembly (1) to ripper group (C) with six washers (2), four bolts (3), and two bolts (4). Tighten bolts (3) and (4) to a torque of 240 ± 40 N·m (175 ± 30 lb ft).

3. Install pin (5) to ripper group (C).

4. Install lever (6) to bracket assembly (1) with pin (7), washer (8) and ring (9).

5. Connect lever (6) to pin (5) with two links (10), two pins (11), four washers (2), and four bolts (12). Tighten bolts (12) to a torque of 240 ± 40 N·m (175 ± 30 lb ft).

6. Install cylinder group (13) to bracket assembly (1) and lever (6) with two pins (14), two washers (15), and two rings (16).

NOTE: Some or all of Steps 7 through 19 may have been previously installed, if so skip to Step 20.

7. Install bracket (17) to transmission cover (D) with two washers (18) and two bolts.

NOTE: The item not numbered is part of transmission cover (D).

8. Install valve group (19) to bracket (17) with four washers (18), four bolts (20) and four locknuts (21).

9. Assemble elbows (22) to steering valve (E) and valve group (19) with two seals (23).

10. Connect hose assembly (24) to elbows (22) at steering valve (E) and valve group (19) with two seals (25).

11. Assemble connector (26) and adapter (27) to power train oil filter (F) with seal (28).

12. Assemble elbow (29) to valve group (19) with seal (23).

13. Connect hose assembly (30) to connector (26) at power train oil filter (F) and elbow (29) at valve group (19) with two seals (25).

14. Assemble clips (31) and (32) to hose assembly (30) and transmission cover with washer (33) and bolt (34).

15. Connect harness (35) to valve group (19) and battery and wiring harness (cab) (G) with two clip assemblies (36).

16. Assemble three clips (37) to: harness assembly (35) at valve group (19) with locknut (21) (Step 8), to oil filter (existing bolt) (H), and transmission cover [boss] (D) with washer (18) and bolt (38).

17. Assemble strap (39) to harness assembly (35) at battery and wiring harness [cab] (G).



(K) #1-purple. (L) #2-green. (M) #3-white.

18. Install switch assembly (40) to cab control deck (J). Attach wires (K), (L) and (M) to switch assembly (40).

19. Remove two plugs (41) and two seals (42). These parts are not reused and can be discarded (view A-A).



(N) Head end. (O) Rod end.

20. Install two connectors (43) to cylinder group (13) with two seals (44).

21. Install elbow (45) and elbow (46) to valve group (19) with two seals (47).

22. Connect hose assemblies (48) to connectors (43) at cylinder group (13) with two seals (49).

23. Connect the other ends of hose assemblies (48) to elbows (45) and (46) at valve group (19) with two seals (49).

24. Install five grommets (50) to hose assemblies (48).

25. Install five clips (51) and (52) to grommets (50).

26. Assemble eight washers (53) and eight bolts (54) to clips (51) and (52) at bosses on ripper group.

27. Assemble two washers (53), two bolts (56) and plate (55) to clips (51) and (52) at boss on ripper group (view D-D).

28. Cycle pin puller cylinder and lift, tilt cylinders full stroke in both directions several times. Check all connections for leaks and make repairs if necessary.

29. Check hydraulic oil tank level. If necessary, add oil to maintain the level at the FULL mark on the sight gauge.

Caterpillar Information System:

Installation of 935B Governor Control Conversion Kit 8Y0156{1265} Installation of 935B Governor Control Conversion Kit 8Y0156{1265}
Procedure for Repairing/Improving Scraper Retarder and Transfer Gear Group{3117} Procedure for Repairing/Improving Scraper Retarder and Transfer Gear Group{3117}
Radiator Grill Modification to Install Light Group{1381, 7309} Radiator Grill Modification to Install Light Group{1381, 7309}
Installation Of Swinging Drawbar{7119} Installation Of Swinging Drawbar{7119}
Conversion From Folded Core To Conventional Radiator{1353} Conversion From Folded Core To Conventional Radiator{1353}
Rebuilding Wheel Tractor-Scraper Hitches, Brackets, and Scraper Kingbolt Housings{7100} Rebuilding Wheel Tractor-Scraper Hitches, Brackets, and Scraper Kingbolt Housings{7100}
Installation Of 4N9001 And 4N9002 Connecting Rods{1218} Installation Of 4N9001 And 4N9002 Connecting Rods{1218}
Installation and Machining Procedure for 1U2975 and 1U2976 Support Assemblies{7115} Installation and Machining Procedure for 1U2975 and 1U2976 Support Assemblies{7115}
Installation of 9X3289 Solenoid Assembly on Machines Equipped with Dual Horsepower Control{1000} Installation of 9X3289 Solenoid Assembly on Machines Equipped with Dual Horsepower Control{1000}
Assembly and Operation of 1U5999 Spindle Group Used for Testing Transmissions on Hydraulic Test Bench{0783} Assembly and Operation of 1U5999 Spindle Group Used for Testing Transmissions on Hydraulic Test Bench{0783}
Assembly and Installation of Duo-Cone Track Idler Seals with "L" Shaped Sealing Ring Cross-Section{7561} Assembly and Installation of Duo-Cone Track Idler Seals with "L" Shaped Sealing Ring Cross-Section{7561}
Installation of 3W1323 Fuel Tank Guard Group{7150} Installation of 3W1323 Fuel Tank Guard Group{7150}
Installation of 9SU (7NH) and 9U (7PH) Bulldozers{6078, 6053} Installation of 9SU (7NH) and 9U (7PH) Bulldozers{6078, 6053}
Installation of 8SU (1KH) and 8U (1JH) Bulldozers{6051, 6053} Installation of 8SU (1KH) and 8U (1JH) Bulldozers{6051, 6053}
Installation of No. 8 Ripper (1FH){6311} Installation of No. 8 Ripper (1FH){6311}
Installation of D7H "Su" Bulldozer (3G5435) Spill Plates{6078} Installation of D7H "Su" Bulldozer (3G5435) Spill Plates{6078}
Installation of No. 10 Ripper (1WH, 1XH){6311, 6312} Installation of No. 10 Ripper (1WH, 1XH){6311, 6312}
Installation of 10S (1RH) and 10U (1SH) Bulldozer{6051, 6053} Installation of 10S (1RH) and 10U (1SH) Bulldozer{6051, 6053}
Installation of D7H "S" Bulldozer (4T2434) Spill Plates{6051} Installation of D7H "S" Bulldozer (4T2434) Spill Plates{6051}
Installation of Hydraulic Tank{5056} Installation of Hydraulic Tank{5056}
Installation of 7C9760 (12V) or 8N3569 (24V) Fuel Boost Pump Group{1250, 1256, 1260} Installation of 7C9760 (12V) or 8N3569 (24V) Fuel Boost Pump Group{1250, 1256, 1260}
Installation of D6H Bulldozer (1U1274, 4T1533, 9W3092) Spill Plates{6078} Installation of D6H Bulldozer (1U1274, 4T1533, 9W3092) Spill Plates{6078}
Adjustable Arm Rest for D4H and D5H Tractors{7300} Adjustable Arm Rest for D4H and D5H Tractors{7300}
Reconditioning Ripper Pin Bores{6310, 6311, 6312, 6313, 6314, 6315, 6316} Reconditioning Ripper Pin Bores{6310, 6311, 6312, 6313, 6314, 6315, 6316}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.