Assembly Procedure For The Track Carrier Roller On CIPI Undercarriage Arrangements Which Are Based On 325 and 325B Track Type Excavators

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-0510     Driver Gp     1    
B     1U-8843     Duo-Cone Seal Installer As     1    
C     8T-5096     Dial Indicator Gp     1    

Note: For additional information on the assembly of track carrier rollers, refer to Undercarriage Reconditioning Bulletin, SEBF8599.

  1. Thoroughly clean all of the parts of the track carrier roller prior to assembly.

    Note: Do not reuse bearings (12) and (13). Use new parts for replacement.




    Illustration 1g00367312

    Note: Bearing (13) is a straight bearing.

  1. Lower the temperature of bearing (13) .

  1. Use Tooling (A) and a press to install bearing (13) in the inside bore of the track carrier roller.

  1. Install the bearing until the bearing is even with the shaft counterbore in the track carrier roller.



    Illustration 2g00489523

    Note: Bearing (12) has a flange.

  1. Lower the temperature of bearing (12) .

  1. Use Tooling (A) and a press to install bearing (12) in the outside bore of the track carrier roller. The outside bore can be identified by three threaded holes "H" in the track carrier roller.

  1. Install the bearing until the flange on the bearing contacts the counterbore in the track carrier roller.



    Illustration 3g00489522

  1. Check the condition of the O-ring seal that is used in collar (11). If the O-ring seal is damaged, use a new part for replacement. Install the O-ring seal in the collar. Apply clean oil on the O-ring seal.

  1. Use a press to install collar (11) on shaft (8) .

    1. For track carrier rollers on CIPI undercarriage arrangements which are based on 325 track type excavators, install collar (11) until dimension "X" is 132.4 ± 0.20 mm (5.21 ± .008 inch).

    1. For track carrier rollers on CIPI undercarriage arrangements which are based on 325B track type excavators, install collar (11) until dimension "X" is 129.2 ± 0.20 mm (5.09 ± 0.008 inch).

  1. Use the following procedure to determine shaft end play.

      Note: Do not install the Duo-Cone seals in the track carrier roller or collar (11) at this time.

    1. Install shaft assembly (8) in the track carrier roller without Duo-Cone seals.

    1. Install retainer (7) and socket head bolts (6) on the end of shaft assembly (8) .

    1. Use Tool (C) to measure the end play of shaft assembly (8). For track carrier rollers on CIPI undercarriage arrangements which are based on 325 track type excavators, the end play of the shaft assembly must be 0.25 mm (.010 inch) to 1.25 mm (.049 inch). For track carrier rollers on CIPI undercarriage arrangements which are based on 325B track type excavators, the end play of the shaft assembly must be 0.20 mm (0.008 inch) to 0.75 mm (0.030 inch). Bearing (12) controls the amount of shaft end play.

    1. Disassemble the track carrier roller, but do not remove collar (11) from shaft (8) .

    Note: The rubber seals and all surfaces that make contact with the seals must be clean and dry. After installation of the seals, apply clean SAE 30 oil on the contact surfaces of the metal seals. For more information concerning the assembly and installation of Conventional Duo-Cone Seals, refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install" in this manual.




    Illustration 4g00489499

  1. Install Duo-Cone seal (10) in collar (11) with Tooling (B) .



    Illustration 5g00489497

  1. Install Duo-Cone seal (9) in the track carrier roller on the side without the three threaded holes with Tooling (B) .



    Illustration 6g00489493

  1. Carefully install shaft assembly (8) in the track carrier roller.

  1. Install retainer (7) and two socket head bolts (6) .



    Illustration 7g00489486

  1. Install washer (5), as shown.



    Illustration 8g00489481

  1. Check the condition of O-ring seal (4) that is used on cover (3). If the O-ring seal is damaged, use a new part for replacement. Apply clean oil on O-ring seal (4). Install the O-ring seal on cover (3) .



    Illustration 9g00489477

  1. Install cover (3) on the track carrier roller and three socket head bolts (1) .

    Note: There are two types of track carrier rollers: The track carrier rollers are welded or the track carrier rollers are cast. The track carrier rollers that are welded will have a weld bead. The track carrier rollers that are cast will have no welds.

  1. Put the track carrier roller in a vertical position. Fill the track carrier roller with clean SAE 30 oil.

    1. For track carrier rollers on CIPI undercarriage arrangements which are based on 325 track type excavators, the capacity of the welded track carrier roller is 180 ± 10 mL (6.12 ± 0.34 oz).

    1. For track carrier rollers on CIPI undercarriage arrangements which are based on 325B track type excavators, the capacity of the welded track carrier roller is 120 ± 5 mL (4.08 ± 0.17 oz). The capacity of the cast track carrier roller is 85 ± 5 mL (2.89 ± 0.17 oz).

  1. Apply a thin coat of 5P-3413 Pipe Sealant on the threads of plug (2) .

  1. Install plug (2) .

End By: Install the track carrier rollers. Refer to Disassembly and Assembly, "Track Carrier Roller - Install" in this manual.

Caterpillar Information System:

325, 325B and 325L Excavators Track Carrier Roller - Disassemble
325, 325B and 325L Excavators Track Carrier Roller - Remove
3176C and 3196 Engines For Caterpillar Built Machines Fuel Filter Base - Install
3500B Engines Auxiliary Water Pump - Assemble - Auxiliary Pump (Type 1)
2000/05/01 Corrections To Disassembly and Assembly Modules, G3600 Engines , "Pistons and Connecting Rods - Install" {1225}
3176C and 3196 Engines For Caterpillar Built Machines Fuel Filter Base - Remove
325, 325B and 325L Excavators Hydraulic System Pressure - Release
Alternator - Delco 21SI Alternator - Assemble
2000/05/01 Service Manual Module, RENR2484, "Electronic Modular Control Panel II+ (EMCP II+)" is Now Available {4490}
3126B Engines for Caterpillar Built Machines Pistons and Connecting Rods - Disassemble
3176C and 3196 Engines for Caterpillar Built Machines Fuel Dilution of Engine Oil
EMCPII+ for Gas Engines GSC CID 0100 - FMI 03
325, 325B and 325L Excavators Track Carrier Roller - Install
325, 325B and 325L Excavators Track Roller - Remove
325, 325B and 325L Excavators Track Roller - Disassemble
325, 325B and 325L Excavators Track Roller - Assemble
325, 325B and 325L Excavators Track Roller - Install
G3406 Engine Overhaul (Major)
325, 325B and 325L Excavators Track - Separate
325, 325B and 325L Excavators Track - Connect
325, 325B and 325L Excavators Front Idler and Recoil Spring - Remove
325, 325B and 325L Excavators Front Idler and Recoil Spring - Install
G3406 Engine Overhaul (Top End)
325, 325B and 325L Excavators Front Idler - Disassemble
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.