Illustration 1 | g00464408 |
NOTICE |
---|
Improper lifting and improper tie-downs can allow the load to shift and cause injury or damage. |
The shipping weight that is listed is the weight of the most common configuration of the machine. If attachments have been installed on your machine, the weight of your machine and the center of gravity of your machine may vary.
Refer to Operation and Maintenance Manual, "Specifications" for specific weight information.
- Use proper rated cables and slings for lifting. The crane should be positioned so that the machine is lifted parallel to the ground.
- To prevent contact with the machine, lifting cables should have sufficient length.
- Use the rear eyes and the front eyes that are provided on the lower frame to fasten tie-downs. Use corner protectors for sharp corners.
- Move the hydraulic lockout control to the LOCKED position.
Lifting the Machine Segments
Bucket
Illustration 2 | g00115251 |
(1) Pin (2) Sleeve (3) Bolts (4) Nuts |
Install pin (1) and sleeve (2) in the brackets of the bucket. Illustration 2 indicates the method to secure pin (1) with bolts (3) and nuts (4). Fasten two proper rated wire cables to pin (1) .
Super Long Demolition (If Equipped)
Use the lifting points on the boom nose.
Illustration 3 | g01152985 |