312B Excavator Attachments Caterpillar


Lowering Control Valve (Boom) - Test

Usage:

312B L 2KW

Boom Cylinder Drift

Refer to Testing and Adjusting, RENR1105 for information on testing the boom cylinder drift.

Manual Boom Lower Operation

  1. Start the engine.

  1. Fully extend the bucket cylinder (close bucket).

  1. Fully retract the bucket cylinder (open bucket).

  1. Raise the boom until the upper surface of the boom at the stick end becomes parallel to the ground. Stop the engine.



    Illustration 1g00292938

    (1) Cap

    (2) Locknut

    (3) Adjustment screw

  1. Remove cap (1) .

  1. Measure distance (A) .

  1. Loosen locknut (2) of one boom lowering control valve.

  1. Slowly turn adjustment screw (3) clockwise until the boom starts to lower.

    Note: The adjustment screw on either boom lowering control valve may be used in order to lower the boom. However, both adjustment screws may be used together in order to increase the speed of lowering.

    Note: The adjustment screw must be replaced after three uses.

  1. When the front equipment has been completely lowered onto the ground, turn adjustment screw (3) counterclockwise until distance (A) is reached.

  1. Tighten locknut (2) .

  1. Replace cap (1) .

  1. Before you put the machine into operation, make any necessary repairs.

For additional information, consult your Caterpillar dealer.

Relief Valves For Boom Cylinder Head End

Preparation




    Illustration 2g00379772

    (1) Tap (power shift pressure)

    (2) Tap (front pump delivery pressure)

  1. Place the machine on level ground and stop the engine.

  1. Release the pressure in the hydraulic system. Refer to Testing And Adjusting, "Release of Pressure in the Hydraulic System" for information on releasing the hydraulic pressure.

  1. Connect a 60000 kPa (8700 psi) pressure gauge to main pump pressure tap (2) .

  1. Connect a 4000 kPa (580 psi) pressure gauge to tap (1) .

  1. Start the engine and raise the hydraulic oil temperature to 55 ± 5°C (131 ± 9°F) .

  1. Place the power mode selector switch in the POWER MODE position.

  1. Place the engine speed dial at position 10 and maintain the maximum engine speed with no load on the engine. After the engine has been running for 3 seconds, check the engine speed.

    Note: The engine speed with no load should be 1980 ± 50 rpm.

  1. Temporarily set the main relief valve pressure. Refer to Testing and Adjusting for information on temporarily setting the main relief valve pressure.

  1. Start the "Service Mode" and keep the power shift pressure constant at 2450 kPa (355 psi) .

    Note: Normal operations of the engine and pumps is necessary for the pressure adjustment. If the pressure adjustments are not correct, check the characteristic curve for the engine and the pump. If the pump flow is lower than the specification, verify that there is no air in the hydraulic system. Refer to Testing And Adjusting, "Release of Air from Main Pumps" for information on releasing air from the main pump.

Test




    Illustration 3g00379819

  1. Fully extend the boom cylinders. Hold the implement control lever in the BOOM RAISE position.

  1. Check the pressure at pressure tap (2) .

  1. Fully extend the boom cylinders. Hold the implement control lever in the BOOM RAISE position.

  1. Check the pressure at pressure tap (2) .

  1. Reset the main relief valve pressure. Refer to Testing and Adjusting for information on setting the main relief valve pressure.

    Note: The relief valve is set to open at 31900 ± 1470 kPa (4625 ± 210 psi) .

Caterpillar Information System:

3003, 3013, 3014 and 3024 Engines for Caterpillar Built Machines Alternator and Regulator
Air Conditioning and Heating R134a for All Caterpillar Machines Refrigerant Accumulator - Remove and Install
315B L Excavator Storage Box
M312 Excavator Machine System Boom - Stub Boom
315B L Excavator Cooling System Level - Check
315B and 315B L Excavator Hydraulic System Relief Valve (One Way Flow Line) - Test and Adjust
315B L Excavator Cooling System Hoses - Inspect
311B and 312B Excavators Hydraulic System Pressure Specifications - 311B
315B L Excavator Cooling System Coolant Extender (ELC) - Add
315B L Excavator Cooling System Coolant Additive (DEAC) - Add
315B L Excavator Fuel System Secondary Filter - Replace
315B L Excavator Fuel System Priming Pump Strainer - Clean
M312 Excavator Machine System Boom - Fore Boom
311B and 312B Excavators Hydraulic System Pressure Specifications - 312B and 312B L
312B Excavator Attachments Two-Way Hydraulic Flow Operation
311B and 312B Excavators Hydraulic System Relief Valve (Pilot) - Test and Adjust
301.5, 301.6 and 301.8 Mini Hydraulic Excavators Fuel System Water Separator - Drain
M312 Excavator Machine System Lines (Hammer) - Boom (One Piece)
311B and 312B Excavators Hydraulic System Relief Valve (Main) - Test and Adjust
5130 Excavator Hydraulic System Pump Drive
5130B Excavator Hydraulic System Final Drive
M312 Excavator Machine System Lines (Hammer) - Boom (Variable)
M312 Excavator Machine System Auxiliary Hydraulic Lines - Boom (One Piece)
M312 Excavator Machine System Auxiliary Hydraulic Lines - Boom (One Piece)
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.