Installing Sound Isolation Mounting Groups{1000, 3300} Caterpillar


Installing Sound Isolation Mounting Groups{1000, 3300}

Usage:

D349 (62P),
D379 (69B),
D398 (67B),
D399 (91B) D346 (40J),
D348 (38J)

The installation of Sound Isolation Mounting Groups causes a reduction in movement of noise and vibration from the engine and marine gear to the structure of the vessel. Similar isolation materials should be installed on all components of the drive line. Other publications that are to be used with this instruction during the installation and alignment of Marine Engines and Marine Gears are:

Cat Marine Engine Application and Installation Guide, Form LEHM1469

Aligning Caterpillar Marine Power Packages, Form SEHS7456


NOTICE

Thickness of the isolation washers will gradually become smaller because of compression. After the mounting bolts are tightened to specified torque during installation, do not tighten them again unless alignment procedure is again necessary.


NOTE: Some earlier engines are equipped with shorter mounting rails and the thrust components cannot be installed unless modification is made to the engine rail. See modification procedure on page 11.

Installation With Poured Shims (Fluid That Becomes Solid)

Installation of sound isolators:

(1) With a 1.312"Ø (34Ø) drill, drill fitted holes (P) at location (D) in engine rails (1) only. With a reamer, make fitted holes (P) 1.375" + .000" - .001"Ø (35 + .000 - .025Ø).

(2) Make alignment of the marine transmission to the output shaft; use the procedure given in Form LEHM1469. A minimum clearance of 2.125" (54) at location (E) is necessary between engine rail (1) and engine bed (4) to install thrust component (3). CAUTION: Before item 3 is started, make sure there is enough clearance between the engine rail and engine bed to install bolts (B). If not, do item 8 before item 3.

(3) At locations (D), install a 5N4403 Drill Bushing. With a 1.062"Ø (27Ø) drill, and with the drill bushing used as a guide, drill mounting holes (K) in engine bed (4). At locations (D), remove the 5N4403 Drill Bushing and install a 5N4452 Ream Bushing. With a 1.125"Ø (29Ø) reamer, and with the ream bushing used as a guide, ream mounting holes (K) in engine bed (4) to 1.125"Ø ± .001"Ø (28.6 ± .025Ø).

(4) With a 1.062"Ø (27Ø) drill, and with the holes in the engine rails used as a guide, drill holes (N) at location (H) in engine bed (4).

(5) At location (D) install 1.12"Ø (28Ø) fitted bolts (G) with isolation bushings (7) and lower isolation washers (5). At location (H) install .88"Ø (22Ø) bolts (M) with O-ring (8) and lower isolation washers (10). Hold lower isolation washers (5) and (10) in position with a thin layer of rubber cement.

(6) Before installation of the poured shims, lift the complete unit .022" (0.56) higher. This is the amount of reduction in thickness of the isolation washers with the weight of the unit and the bolts tightened. CAUTION: Poured shims should not be used under thrust components. Do not install solid shims (6) under thrust components (3) until all of the weight of the unit is on isolation washers (5) and (10) and bolts (G) and (M) have been tightened. Make sure the poured shims do not make contact with the engine rails. Maximum temperature of the poured shims must not exceed 200°F (93°C)

(7) Loosen the transmission jacking screws (adjustment screws). Install upper isolation washers (5) and (10), steel washers (9) and nuts. At locations (D), tighten the nuts on bolts (G) to a torque of 80 ± 5 lb.ft. (109 ± 7 N·m). At locations (H) tighten the nuts on bolts (M) to a torque of 70 ± 5 lb.ft. (96 ± 7 N·m).

Installation of thrust components

(8) Assemble each thrust component (3). Tighten bolts (A) to a torque of 30 ± 5 lb.ft. (40 ± 7 N·m). Fasten the thrust component to the engine rail with clamps. Make sure the mounting holes are a minimum of 1.50" (38) from the end of the rail as shown. Before the holes for bolts (B) are drilled through the engine rails, make sure holes (C) can be drilled throug the engine bed. With a .968"Ø (25Ø) drill, using the holes in the thrust component as a guide, drill holes for bolts (B) through the thrust component and engine rail only. With a reamer, make the holes 1.00" ± .001"Ø (25.4 ± .025Ø). Install bolts (J) at holes (C). Install solid shims (6) under thrust components (3) and tighten the nuts on bolts (J) to a torque of 640 ± 80 lb.ft. (865 ± 110 N·m).

(9) Again check the alignment at the companion flange. If alignment is correct, the installation procedure is complete. If the alignment is not correct, do the alignment procedure again.

Installation With Solid Shims

Installation of sound isolators:

(1) With a 1.312"Ø (34Ø) drill, drill fitted holes (P) at locations (D) in engine rails (1) only. With a reamer, make fitted holes (P) 1.375" + .000 - .001"Ø (35 + .000 - .025Ø).

(2) Make alignment of the marine transmission to the output shaft; use the procedure given in Form LEHM1469. A minimum clearance of 2.123" (54) at location (E) is necessary between engine rail (1) and engine bed (4) to install thrust component (3). CAUTION: Before item 3 is started, make sure there is enough clearance between the engine rail and engine bed to install bolts (B). If not, do item 8 before item 3.

(3) At locations (D), install a 5N4403 Drill Bushing. With a 1.062"Ø (27Ø) drill, and with the drill bushing as a guide, drill mounting holes (K) in engine bed (4). At locations (D), remove the 5N4403 Drill bushing and install a 5N4452 Ream Bushing. With a 1.125"Ø (29Ø) reamer, and with the ream bushing as a guide, ream mounting holes (K) in engine bed (4) to 1.125" ± .001"Ø (28.6 ± .025Ø).

(4) With a 1.062"Ø (27Ø) drill and with the holes in the engine rails used as a guide, drill holes (N) at location (H) in engine bed (4).

(5) Measure the spaces between engine rails (1) and engine beds (4) and make a record of dimensions (L). The thickness of an isolation washer is .235" ± 0.15" (6.0 ± 0.38). To get dimension (F), subtract .235" ± 0.15" (6.0 ± 0.38) from dimension (L) and add .022" (0.56); this will give the correct thickness of solid shims needed. .022" (0.56) is the amount of reduction in thickness of the isolation washers with the weight of the unit and the bolts tightened.

(6) Lift the complete unit and install solid shims (6). At locations (D) install 1.12"Ø (28Ø) fitted bolts (G) with isolation bushing (7) and lower isolation washers (5). At locations (H) install .88"Ø (22Ø) bolts (M) with O-ring (8) and lower isolation washers (10).

(7) Loosen the engine jacking screws (adjustment screws). Install upper isolation washers (5) and (10), steel washers and nuts. At locations (D) tighten the nuts on bolts (G) to a torque of 80 ± 5 lb.ft. (109 ± 7 N·m). Tighten the nuts on bolts (M) to a torque of 70 ± 5 lb.ft. (96 ± 7 N·m).

Installation of thrust components:

(8) Assemble each thrust component (3). Tighten bolts (A) to a torque of 30 ± 5 lb.ft. (40 ± 7N·m). Fasten the thrust component to the engine rail with clamps. Make sure the mounting holes are a minimum of 1.50" (38) from the end of the rail as shown. Before the holes for bolts (B) are drilled through the engine rails, make sure holes (C) can be drilled throug the engine bed. With a .968"Ø (25Ø) drill, and using the holes in the thrust component as a guide, drill holes for bolts (B) through the thrust component and engine rail only. With a reamer, make the holes 1.00" ± .001"Ø (25.4 ± .025Ø). Install bolts (J) at holes (C). Install solid shims (6) under thrust components (3) and tighten the nuts on bolts (J) to a torque of 640 ± 80 lb.ft. (865 ± 110 N·m).

(9) Again check the alignment at the companion flange. If alignment is correct, the installation procedure is complete. If the alignment is not correct, do the alignment procedure again.

Engine Mounting Rail Modification

(1) To install the sound isolation thrust components on earlier engines which have the shorter mounting rails (1), make and add a 5.25" (133.3) angle (2) to the rails. Later engines do not need this addition. See thrust component installation page 4.

Caterpillar Information System:

Using 9S9102 Thermistor Thermometer Group{0651} Using 9S9102 Thermistor Thermometer Group{0651}
Installation Of Replacement Hydraulic Pump Groups{5055} Installation Of Replacement Hydraulic Pump Groups{5055}
Installation Of 2N2384 And 2N2385 Solenoids{1259, 1400} Installation Of 2N2384 And 2N2385 Solenoids{1259, 1400}
Installation Of Oversize Connecting Rod Bearings{1219} Installation Of Oversize Connecting Rod Bearings{1219}
Installation Of Crankshaft Seals And Wear Sleeves{1160, 1161} Installation Of Crankshaft Seals And Wear Sleeves{1160, 1161}
Installation Of 7N4013 Or 7N6342 Cylinder Block Service Group And 7N4134 Hardware Kit{1201} Installation Of 7N4013 Or 7N6342 Cylinder Block Service Group And 7N4134 Hardware Kit{1201}
Installation Of Cylinder Block Service Groups And Cylinder Block Hardware Kits{1201} Installation Of Cylinder Block Service Groups And Cylinder Block Hardware Kits{1201}
Water Pump Reconditioning Using The 9N3139 Rebuild Kit And 5P7361 Tool Group{1361} Water Pump Reconditioning Using The 9N3139 Rebuild Kit And 5P7361 Tool Group{1361}
Installation Of 5N1678 Rear Power Take-Off Clutch Support Group{1007} Installation Of 5N1678 Rear Power Take-Off Clutch Support Group{1007}
Using The 5P6524 Engine Timing Indicator Group And 1P540 Flow Checking Tool Group{0782, 1000} Using The 5P6524 Engine Timing Indicator Group And 1P540 Flow Checking Tool Group{0782, 1000}
Use Of The 5P7333 Tool Group For Bridge Dowel Repair{1101} Use Of The 5P7333 Tool Group For Bridge Dowel Repair{1101}
Installation Of Service Replacement Thrust Plates{1203} Installation Of Service Replacement Thrust Plates{1203}
Operation And Maintenance Of 1P3060 Pyrometer Group{0776} Operation And Maintenance Of 1P3060 Pyrometer Group{0776}
Governor Linkage Adjustments{1264, 1289} Governor Linkage Adjustments{1264, 1289}
Installation Of 7N5037 Piston Group{1214} Installation Of 7N5037 Piston Group{1214}
Operation Instructions For Air Conditioner Service Tools{7320} Operation Instructions For Air Conditioner Service Tools{7320}
Use Of 5P8595 Honing Tool Group{1216} Use Of 5P8595 Honing Tool Group{1216}
Installation Of 1W6265, 1W6266 And 1W6267 Insert For Cylinder Liner Seat{1217} Installation Of 1W6265, 1W6266 And 1W6267 Insert For Cylinder Liner Seat{1217}
Operation And Maintenance Of Air Conditioner Vacuum Pumps{7320} Operation And Maintenance Of Air Conditioner Vacuum Pumps{7320}
Installation Of Short Block Group For 3208 Or Cylinder Block Service Group For 1100, 3100 And 3208 Engines{1201, 1203, 1286} Installation Of Short Block Group For 3208 Or Cylinder Block Service Group For 1100, 3100 And 3208 Engines{1201, 1203, 1286}
Alignment Of Single-Bearing Generators{4450} Alignment Of Single-Bearing Generators{4450}
Installing 3N8000 (Rear) And 3N8008 (Front) Crankshaft Seal Conversion Groups{1160, 1161} Installing 3N8000 (Rear) And 3N8008 (Front) Crankshaft Seal Conversion Groups{1160, 1161}
Installation Of 7N4288 Pulley Seal{7320} Installation Of 7N4288 Pulley Seal{7320}
Use Of 5P8709 Tool Group For Alignment Of Piston Cooling Jets{1331} Use Of 5P8709 Tool Group For Alignment Of Piston Cooling Jets{1331}