Installation Of Oversize Connecting Rod Bearings{1219} Caterpillar


Installation Of Oversize Connecting Rod Bearings{1219}

Usage:

641 (64F, 65K, 41M) 650 (63F) 651 (33G, 67K, 44M) 657 (31G, 68K, 46M) 650, (660 - 58K) 660 (77F, 90F) 666 (32G, 64H, 66K) 772 (80S) 773 (63G) 992 (25K) D346 (39J, 40J, 98N) D348 (36J, 38J, 57K) D349 (61P, 62P, 32R) G348 (92R) G349 (93R)

NOTE: Check the size of the bearing journals for the connecting rods on the crankshaft to be sure of installation of the correct bearings.

The bearings in the above chart have an oversize outer diameter and must be used only with reworked (bore made larger) connecting rods. Measure the bore of the connecting rods according to the procedure given on the pages that follow. If a rod is to be reworked, follow the operation instructions for the machine being used.

Use the 1P3537 Dial Bore Gauging Group to measure the reworked diameter of the connecting rods; instructions for use are with the tool group.

Procedure To Check Connecting Rod Bore

Use the 1P3537 Dial Bore Group with this procedure. The 7S8369 Dial Bore Indicator and the canceled 7S8368 Master Ring Set can also be used.

(1) The diameter of the bore must be within the measurements that follow:

...The average of the diameters (A) and (B) must be 4.7205" ± .0010" (119.90 ± 0.03).

...The difference between diameters (A) and (B) must not be more than .002" (0.05).

...Diameter (C) must be 4.7205" ± .0005" (119.90 ± 0.013) and bore taper must not be more than .0003" (0.008).

(2) Remove the rod cap and thoroughly clean the bolts, bolt holes and the rod and rod cap serrations (D). Put 4S9416 Antiseize Compound on the bolt threads, shank and head seat. Tighten the bolts to a torque of 40 ± 4 lb. ft. (54.4 ± 5.4 N·m), plus one-third turn. (This torque is for the rework procedure only. When rods are installed in the engine, see the Service Manual for the correct torque.)

(3) Adjust the 1P3537 Dial Bore Gauge to show zero at 4.7205" (119.90). Make a chart similar to the example shown below. Measure the three diameters and write the dimensions in the chart as (+) or (-) from the zero setting on the gauge.

(4) Measure (A) and (B) near the center of the bore and approximately .56" (14.2) from the joint, as shown, and write the dimensions in the chart. Find the average of (A) and (B) and write this dimension in the chart.

(5) Find the difference between (A) and (B) and write that dimension in the chart. Measure (C) at a location 90° from serrations (D), and near the center of the bore. Write this dimension in the chart. Make a comparison of the dimensions in the chart with the dimensions given in step 1. Use the examples in the chart below as a guide.


*Measurement is outside tolerances in step 1; rework (make larger) the rod bore for oversize bearing. See page 1 for bearing sizes.


**Rod bore size is acceptable.

NOTE: Before a 4N9001 or 4N9002 Connecting Rod is reworked, remove dowels (1) (one each in rod and rod cap). When the bore has been reworked to the new size, install a new 6N3506 Dowel (1), in each rod and rod cap, to the dimension shown.

(6) For rods that have been reworked, mark the rods, as shown, .010 O.S. (0.03). Use .250" (6.3) high stamps (2) to mark the size.

Caterpillar Information System:

Assembly Of Fan Drive Pulley Assemblies{1359} Assembly Of Fan Drive Pulley Assemblies{1359}
Instructions For The Use Of 5P6518 Fixture Group - Parts Reusability{1053, 1105} Instructions For The Use Of 5P6518 Fixture Group - Parts Reusability{1053, 1105}
Installation Of 4N779 And 7N6124 Fuel Injection Pump Housing Assemblies Or Fuel Injection Pump Groups{1251, 1253} Installation Of 4N779 And 7N6124 Fuel Injection Pump Housing Assemblies Or Fuel Injection Pump Groups{1251, 1253}
Use Of 3P2200 Calibration Tool Group{0650, 1250} Use Of 3P2200 Calibration Tool Group{0650, 1250}
Operation And Maintenance Of 5P6540 And 5P6542 Hose Cutoff Saw Groups{5057, 0622} Operation And Maintenance Of 5P6540 And 5P6542 Hose Cutoff Saw Groups{5057, 0622}
Installation Of 7N1754 Oil Level Gauge{1302} Installation Of 7N1754 Oil Level Gauge{1302}
Installing Crankshaft Seals And Wear Sleeves Using The Former 9S8868, 9S8873, 9S8881 And 9S8888 Tools Groups{1160, 1161, 0704} Installing Crankshaft Seals And Wear Sleeves Using The Former 9S8868, 9S8873, 9S8881 And 9S8888 Tools Groups{1160, 1161, 0704}
Use Of 5P2380 Track Tool Arrangement{4174, 4175} Use Of 5P2380 Track Tool Arrangement{4174, 4175}
Installation Of Wear Sleeves For Repair Of Groove Wear Caused By Lip-Type Seals{7558} Installation Of Wear Sleeves For Repair Of Groove Wear Caused By Lip-Type Seals{7558}
Installing Marine Gear Service Bearing Caps{3300} Installing Marine Gear Service Bearing Caps{3300}
Installation Of Thermocouples And Pyrometer{7466} Installation Of Thermocouples And Pyrometer{7466}
Installation Of 6N8859 And 6N8860 Governor Spring Service Groups{1286} Installation Of 6N8859 And 6N8860 Governor Spring Service Groups{1286}
INSTALLATION OF 7N628 GASKET SERVICE GROUP{1101, 1221} INSTALLATION OF 7N628 GASKET SERVICE GROUP{1101, 1221}
Installation And Alignment Of General Electric GE-603K Generators, GTA-15 And GTA-18 Alternators{1156, 1603} Installation And Alignment Of General Electric GE-603K Generators, GTA-15 And GTA-18 Alternators{1156, 1603}
Special Disassembly And Assembly Procedures For Sperry Vickers Pumps With New Type Cartridges{5055} Special Disassembly And Assembly Procedures For Sperry Vickers Pumps With New Type Cartridges{5055}
Installation Of 5P6595 Insert For Cylinder Liner Seat{1217} Installation Of 5P6595 Insert For Cylinder Liner Seat{1217}
Installation Of Service Replacement Thrust Plates{1203} Installation Of Service Replacement Thrust Plates{1203}
Use Of The 5P7333 Tool Group For Bridge Dowel Repair{1101} Use Of The 5P7333 Tool Group For Bridge Dowel Repair{1101}
Using The 5P6524 Engine Timing Indicator Group And 1P540 Flow Checking Tool Group{0782, 1000} Using The 5P6524 Engine Timing Indicator Group And 1P540 Flow Checking Tool Group{0782, 1000}
Installation Of 5N1678 Rear Power Take-Off Clutch Support Group{1007} Installation Of 5N1678 Rear Power Take-Off Clutch Support Group{1007}
Water Pump Reconditioning Using The 9N3139 Rebuild Kit And 5P7361 Tool Group{1361} Water Pump Reconditioning Using The 9N3139 Rebuild Kit And 5P7361 Tool Group{1361}
Installation Of Cylinder Block Service Groups And Cylinder Block Hardware Kits{1201} Installation Of Cylinder Block Service Groups And Cylinder Block Hardware Kits{1201}
Installation Of 7N4013 Or 7N6342 Cylinder Block Service Group And 7N4134 Hardware Kit{1201} Installation Of 7N4013 Or 7N6342 Cylinder Block Service Group And 7N4134 Hardware Kit{1201}
Installation Of Crankshaft Seals And Wear Sleeves{1160, 1161} Installation Of Crankshaft Seals And Wear Sleeves{1160, 1161}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.