330B Excavator Hydraulic System Caterpillar


Operational Checks

Usage:

330B L 1JS
The checks during operation can be used to find leakage in the system and components that are not functioning correctly. The speed of rod movement or the torque on a motor can be used to check the condition of the cylinders, motors and the pumps.

Specifications are listed in tables for the following operational checks. These specifications are calculated average values. The values will vary due to the configuration of the machine.

A machine with the following equipment was used to achieve these specifications: 6500 mm (21 feet 3 inches) boom, 3300 mm (10 feet 8 inches) stick and 1.5 m3 (1.7 yd3) bucket.

Table 1
Required Tools    
Part Number     Description     Qty    
6V-2100     Multitach group     1    

Engine speed for an excavator with no load at high idle is 1960 ± 50 rpm.

Table 2
Item     Specifications    
New Rebuild     Service Limit    
No load high idle (2)     1850 ± 50 rpm (1)     1660 to 1900 rpm (1)    
1960 ± 50 rpm (3) 1760 to 2010 rpm (3)    
No load low idle     720 ± 50 rpm     720 ± 100 rpm    
Maximum speed with load (4)     1720 rpm (5)     1650 rpm (5)     1600 rpm (5)    
No load speed (6)     1300 ± 80 rpm     1300 ± 100 rpm    
( 2 ) AEC switch in the OFF position
( 1 ) Three seconds after the engine speed dial was placed at position "10"
( 3 ) Engine rpm within three seconds after the engine speed dial was placed at position "10"
( 4 ) Pressure is relieved from both pumps.
( 5 ) Minimum rpm
( 5 ) Minimum rpm
( 5 ) Minimum rpm
( 6 ) AEC switch in the ON position

Note: A New specification is the performance that can be expected for a new machine. A Rebuild specification is the performance that can be expected after rebuilding the components of a system. Performance beyond the Service Limit is an indication of these problems: improper maintenance or adjustment, component wear and failure.

Preparation For Operational Checks

Perform Steps 1 through 4 prior to performing any of the following operational checks.

  1. Start the engine.

  1. Place the machine controls at the following settings: Power Mode, Boom Priority Mode, Engine speed dial "10" and AEC switch OFF.

  1. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  1. Set the relief valve pressure settings to the proper specification.

    Note: Refer to Testing and Adjusting, "Pressure Specifications".

Travel Test On Level Ground

Table 3
Required Tools    
Part Number     Description     Qty    
5P-3277     Measuring Tape     1    
    Stopwatch     1    

Preparation




Illustration 1g00296317

(A) Preliminary run 5 m (16.4 ft)

(B) Travel distance 20 m (65.6 ft)

(C) Bucket height 0.5 to 1 m (1.6 to 3.3 ft)

  1. Travel distance must be at least 25 m (82 ft) long. Travel test ground must be hard and as level as possible.

  1. Draw a 25 m (82 ft) straight line on travel test ground as a reference line.

  1. Position the machine so that one track is parallel with the reference line. Position the machine for the travel test. Refer to Illustration 1.

  1. The bucket should be empty.

Test

Reference: Make reference to "Preparation For Operational Checks".

  1. Place the travel speed control switch in HIGH position.

  1. Move the machine by operating both travel levers at the same time.

  1. The first 5 m (16.4 ft) are for a preliminary run. Measure the travel time that is required to travel the remaining 20 m (65.6 ft). Measure the time that is required in each direction.

  1. Measure the travel deviation from the reference line.

  1. Place the travel speed control switch on the LOW position and repeat Steps 2 through 4.

Table 4
Travel Time (time in seconds)    
Travel Speed     New     Rebuild     Service Limit    
HIGH     Forward     16.5 or less     20.0 or less     22.0 or less    
Reverse
LOW     Forward     28.0 or less     32.0 or less     35.0 or less    
Reverse

Note: The following table represents the travel deviation (distance) from the reference line.

Table 5
Travel Deviation
mm (inch)    
Travel Speed     New     Rebuild     Service Limit    
HIGH     Forward     800 (31.5) or less     1200 (47.2) or less     1500 (59.1) or less    
Reverse
LOW     Forward     800 (31.5) or less     1200 (47.2) or less     1500 (59.1) or less    
Reverse

Travel Test On Level Ground (Optional Test)

Note: When "Travel Test On Level Ground" cannot be performed, this test may be used as a substitute.

Table 6
Required Tools    
Part Number     Description     Qty    
    Stopwatch     1    

Preparation




Illustration 2g00297292

  1. Position the machine on level ground.

  1. Raise a track off the ground. Refer to Illustration 2.

  1. Put a mark on a shoe of the raised track.

Test

Reference: Make reference to "Preparation For Operational Checks".

  1. Place the travel speed control switch in HIGH position.

  1. Move the control lever of the raised track to full travel position.

  1. Measure the time that is required for the raised track to make three complete revolutions. Measure the time that is required in each direction.

  1. Place the travel speed control switch in the LOW position and repeat Steps 2 through 3.

Table 7
330B Specifications (time in seconds)    
Travel Speed     New     Rebuild     Service Limit    
HIGH     Forward     24.0 or less     28.0 or less     31.0 or less    
Reverse
LOW     Forward     38.0 or less     44.0 or less     50.0 or less    
Reverse

Table 8
330B L Specifications (time in seconds)    
Travel Speed     New     Rebuild     Service Limit    
HIGH     Forward     26.0 or less     30.0 or less     34.0 or less    
Reverse
LOW     Forward     42.0 or less     48.0 or less     54.0 or less    
Reverse

Drift On Slope

Note: Measuring the amount of drift of the machine on a slope will determine if there is a need to check the travel brake.

Preparation

Table 9
Required Tools    
Part Number     Description     Qty    
    Stopwatch     1    
    Scale
150 mm (6 inch)    
1    



Illustration 3g00297342

  1. Place the machine on a slope of 12 degrees. The surface of the slope must be hard and smooth.

  1. Position the implements, as shown. Refer to Illustration 3.

  1. The bucket should be empty.

Test




Illustration 4g00297498

  1. To indicate the machine's relative position to the slope, put a mark on both the track and the ground. Refer to Illustration 4.

  1. Stop the engine.

  1. Measure the machine movement on the slope after three minutes.

Table 10
Drift mm (inch)    
New     Rebuild     Service Limit    
0     0     0    

Swing Speed And Overswing (Level Ground)

Note: Measurements of the swing speed and the overswing will determine if there is a need to check the swing motor or the anti-reaction valve. The fine swing control switch (if equipped) must be in the OFF position.

Table 11
Required Tools    
Part Number     Description     Qty    
5P-3277     Measuring Tape     1    
    Stopwatch     1    

Preparation




Illustration 5g00297618

  1. Position the machine on level ground. Refer to Illustration 5.

  1. Stop the engine.



    Illustration 6g00293972

    (A) Upper frame

    (B) Undercarriage frame

    (C) Marking

  1. To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer race of the swing bearing. The mark will be used as a target to stop the swing operation. Refer to Illustration 6.

  1. The bucket should be empty.

Test (Overswing)

Reference: Make reference to "Preparation For Operational Checks".

  1. Move the swing control lever in either direction until the machine completes a 180 degree swing operation away from the target.

  1. Move the swing control lever in either direction until the machine completes a 180 degree swing operation toward the target. Return the swing control lever to the NEUTRAL position at the target.

  1. Measure the distance between the marks on the swing bearing. This is the amount of overswing. Refer to Illustration 6.

Note: Use a point that is visible from the operator seat as a reference point for the target.

Table 12
Specifications (Overswing)    
Item     New     Rebuild     Service Limit    
Right Swing    
1300 mm (51.2 inch) or less    

1500 mm (59.1 inch) or less    

1700 mm (66.9 inch) or less    
Left Swing    

Test (Speed)

  1. Move the swing control lever in each direction and measure the time that is required to complete a 180 degree swing operation.

Table 13
Swing Time    
Item     New     Rebuild     Service Limit    
Right Swing     5.0 seconds or less     5.8 seconds or less     6.5 seconds or less    
Left Swing    

Swing Speed And Swing Drift (On A Slope)

Note: Measuring the swing speed on a slope will determine if there is a need to check the swing motor and the anti-reaction valve. Measuring the swing drift on a slope will determine if there is a need to check the swing parking brake.

Table 14
Required Tools    
Part Number     Description     Qty    
5P-3277     Measuring Tape     1    
    Stopwatch     1    

Preparation




Illustration 7g00298078

  1. The bucket should be empty.

  1. Position the machine on a slope of 12 degrees. Refer to Illustration 7.

  1. Position the implements at maximum reach. Position the bucket above the ground so that the bucket will clear any obstacles.

Test (Speed)




Illustration 8g00298079

  1. Position the upper structure at position (A). The upper structure should be at a 90 degree angle to the lower structure. Refer to Illustration 8.

  1. Measure the time that is required to swing the upper structure from position (A) to position (B) .

  1. Position the upper structure at position (C). The upper structure should be at a 90 degree angle to the lower structure.

  1. Measure the time that is required to swing the upper structure from position (C) to position (B) .

Table 15
Swing Time (seconds)    
Item     New     Rebuild     Service Limit    
Right Swing     5.8 or less     6.6 or less     7.4 or less    
Left Swing    

Test (Drift)




Illustration 9g00298079

  1. Position the upper structure at position (A). The upper structure should be at a 90 degree angle to the lower structure. Refer to Illustration 9.



    Illustration 10g00293972

    (A) Upper Frame

    (B) Undercarriage Frame

    (C) Marking

  1. To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer race of the swing bearing. Refer to Illustration 10.

  1. Stop the engine.

  1. Leave the machine in this position for three minutes. Measure the swing drift on the circumference of the swing bearing.

  1. Position the upper structure at position (C). The upper structure should be at a 90 degree angle to the lower structure. Refer to Illustration 9.

  1. Repeat Steps 3 and 4.

Table 16
Swing Drift mm (inch)    
Item     New     Rebuild     Service Limit    
Right Swing     0     0     0    
Left Swing    

Cylinder Drift

Table 17
Required Tools    
Part Number     Description     Qty    
5P-3277     Measuring Tape     1    
    Stopwatch     1    

Preparation




Illustration 11g00298378

Reference: Make reference to "Preparation For Operational Checks".

  1. Position the machine on level ground. Refer to Illustration 11.

  1. The bucket should be empty.

Test (Boom And Stick Cylinders)

  1. Raise the boom until the upper surface of the boom is parallel to the ground.

  1. Fully extend the bucket cylinder.

  1. Fully retract the stick cylinder.

  1. Measure each cylinder's length from cylinder pin to cylinder pin.

  1. Stop the engine.

  1. Leave the machine in this position for five minutes. Measure each cylinder's length from cylinder pin to cylinder pin for drift.

Test (Bucket Cylinder)




Illustration 12g00298379

  1. Raise the boom high enough so that the stick can be positioned perpendicular to the ground. Refer to Illustration 12.

  1. Fully extend the bucket cylinder.

  1. Measure the bucket cylinder's length from cylinder pin to cylinder pin.

  1. Stop the engine.

  1. Leave the machine in this position for five minutes. Measure the bucket cylinder's length from cylinder pin to cylinder pin for cylinder drift.

Table 18
Cylinder Drift    
Item     New     Rebuild     Service Limit    
Boom Cylinder    
6.0 mm (0.24 inch) or less    

12.0 mm (0.47 inch) or less    

24.0 mm (0.94 inch) or less    
Stick Cylinder    
10.0 mm (0.39 inch) or less    

15.0 mm (0.59 inch) or less    

25.0 mm (0.98 inch) or less    
Bucket Cylinder    
10.0 mm (0.39 inch) or less    

15.0 mm (0.59 inch) or less    

25.0 mm (0.98 inch) or less    

Cylinder Operating Speed

Table 19
Required Tools    
Part Number     Description     Qty    
    Stopwatch     1    

Preparation

Reference: Make reference to "Preparation For Operational Checks".

  1. Place the machine on level ground.

  1. The bucket should be empty.

Test (Boom Cylinders)

  1. Fully retract the bucket cylinder and the stick cylinders.

Extension Test

Start with the bucket on the ground. Measure the time that is required for the boom cylinders to reach full extension.




Illustration 13g00298498

(A) Extension test

(B) Retraction test

Retraction Test

Start with the boom cylinders at full extension. Measure the time that is required for the bucket to come in contact with the ground.

Test (Stick Cylinder)

  1. Position the upper surface of the boom parallel to the ground.

  1. Fully extend the bucket cylinder.

Extension Test

Start with the stick cylinder in the full retracted position. Measure the time that is required for full extension of the stick cylinder.




Illustration 14g00298558

(A) Extension test

(B) Retraction test

Retraction Test

Start with the stick cylinder in the full extended position. Measure the time that is required to retract the stick cylinder.

Test (Bucket Cylinder)

  1. Position the upper surface of the boom parallel to the ground.

  1. Position the stick in a perpendicular position to the ground.

Extension Test

Start with the bucket cylinder in the full retracted position. Measure the time that is required for full extension of the bucket cylinder.




Illustration 15g00298598

(A) Extension test

(B) Retraction test

Retraction Test

Start with the bucket cylinder in the full extended position. Measure the time that is required to retract the bucket cylinder.

Table 20
Cylinder Operating Speed (seconds)    
Item     New     Rebuild     Service Limit    
Boom     Extension     4.1 ± 0.3     5.3 max.     6.1 max.    
Retraction 3.1 ± 0.3     3.9 max.     4.6 max.    
Stick     Extension     5.0 ± 0.3     6.6 max.     7.7 max.    
Retraction 3.4 ± 0.3     4.4 max.     5.1 max.    
Bucket     Extension     5.0 ± 0.3     6.4 max.     7.4 max.    
Retraction 2.7 ± 0.3     3.5 max.     4.0 max.    