583R Pipelayer Power Train Caterpillar


Final Drive - Assemble

Usage:

583R 2XS

Assembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-0520     Driver Group     1    
B     8M-9395     Seal Installer     1    
C     138-7574     Link Bracket     2    
D     8T-2827     Spacer     1    
E     138-7573     Link Bracket     3    
F     138-7573     Link Bracket     2    
G     138-7575     Link Bracket     3    



    Illustration 1g00504956

  1. Use Tooling (A), and install the lip seal in hub (1). Place clean oil on the lip of the seal.

  1. Heat bearing cone (2) to a maximum temperature of 135°C (275°F). Install bearing cone (2) on hub (1) .



    Illustration 2g00504958

    Note: Before any of the Duo-Cone seals are installed, see Disassembly And Assembly, "Duo-Cone Floating Seals - Installation Procedure" in this module.

  1. Use Tooling (B), and install the Duo-Cone seal on hub (1), as shown.



    Illustration 3g00504960

  1. Lower the temperature of bearing cups (3), and install the bearing cups in hub (4) .

  1. Use Tooling (B), and install the Dou-Cone seal in hub (4) .



    Illustration 4g00504962

  1. Install Tooling (C), and attach a hoist. Place hub (4) in position on hub (1) .



    Illustration 5g00504984

  1. Heat bearing cone (6) to a maximum temperature of 135°C (275 °F). Install bearing cone (6) on the hub.

  1. Place Tooling (D) in position on the bearing cone. Install retainer (5). Turn hub (4) while you are tightening the bolts that hold the retainer to a torque of 135 ± 15 N·m (100 ± 11 lb ft). Allow the bearing cone to return to room temperature before the retainer and Tooling (D) are removed. Remove the retainer and Tooling (D) .



    Illustration 6g00504986

  1. Place hub (7) in position in gear (9). Install retainer ring (8) .



    Illustration 7g00504988

  1. Turn over hub (7) and gear (9), and install Tooling (E). Attach a hoist to Tooling (E), and place the hub and gear (9) in position in hub (4) .



    Illustration 8g00504990

  1. Place 15 pins (10) in position in the hub. Hub (7) should be below the end of hub (1) .



    Illustration 9g00504991

  1. Use Tooling (A) and a press, and install ring (11) in retainer (5) .

  1. Place retainer (5) in position on the hub, and install the bolts.


    NOTICE

    There must be metal to metal contact between hub (1) and retainer (5) .


  1. Use a thickness feeler gauge, and measure the distance between retainer (5) and pins (10). There must be a clearance of .08 ± .05 mm (0.003 ± 0.002 inch) between retainer (5) and pins (10) .



    Illustration 10g00504992

  1. Place the two bearings in position in each of the three gears (14) .

  1. Place gears (14) and the bearings in position in carrier (12) .

  1. Lower the temperature of shaft (13). Align hole (X) in shaft (13) with hole (X) in carrier (12). Use a press, and install shaft (13). Install the roll pin in hole (X) in order to retain shaft (13) .



    Illustration 11g00504993

  1. Use a hoist, and lower carrier (12) in position on sun gear (15) .

  1. Install spiral ring (16) .



    Illustration 12g00504994

  1. Install sun gear (17) and ring (18) .



    Illustration 13g00504995

  1. Install Tooling (F), and attach a hoist.

  1. Align the gears in planetary carrier (12) with gear (9), and sun gear (17). Lower the planetary carrier in the final drive. Be sure that sun gear (17) engages the planetary carrier gears. Be sure that ring (18) stays in the correct position.



    Illustration 14g00504996



    Illustration 15g00504997

  1. Lower the temperature of the two bearing cups, and install the bearing cups in gears (21) .

  1. Place the two bearing cones and gears (21) in position in carrier (19) .

  1. Lower the temperature of shafts (20), and use a press to install the shafts in carrier (19) .

  1. Turn over carrier (19). Measure the distance between the end of the shafts and the machined surface of the carrier. The distance must be .08 ± .05 mm (0.003 ± 0.002 inch).


    NOTICE

    There must be a metal to metal contact between shafts (20) and plates (22) .





    Illustration 16g00504998

  1. Install the O-ring seals on plates (22). Place plates (22) in position on the shafts, and install bolts (23) .



    Illustration 17g00504999

  1. Install Tooling (G) to planetary carrier (19), and attach a hoist.

  1. Install O-ring seals (24) and (25). Align the drain hole in the planetary carrier with the drain hole in the hub, as shown.

  1. Place planetary carrier (19) in position on the hub.

  1. Install the bolts that hold the planetary carrier to the hub. Tighten the bolts to a torque of 475 ± 50 N·m (350 ± 37 lb ft). Remove Tooling (G) .

End By: Install the final drives.

Caterpillar Information System:

824G , 825G and 826G Landfill Compactor Power Guard Control
784C, 785C and 785C HAA Off-Highway Truck/Tractors Hydraulic System Position Sensor (Dump Body) - Adjust
824G , 825G and 826G Landfill Compactor Reversing Fan Control
572R Pipelayer Power Train Bevel and Transfer Gears - Assemble
5130, 5130B and 5230 Excavators, 784B, 785B, 785C, 789B, 789C, 793B and 793C Off-Highway Truck/Tractors and 992G, 994 and 994D Wheel Loaders Vital Information Management System (VIMS) CID 0041 FMI 03 Sensor Power Supply (8 DCV) Voltage Above Normal - Test
773D Off-Highway Truck and 775D Quarry Truck Engine Starting with Ether Starting Aid - If Equipped
773D, 773E, 775D and 775E Off-Highway Trucks Machine Systems Inverter Valve (Secondary Brake) - Remove
784C, 785C and 785C HAA Off-Highway Truck/Tractors Hydraulic System Hoist Cylinder
3304B and 3306B Engines for Caterpillar Built Machines Crankshaft Main Bearings - Install
583R Pipelayer Power Train Final Drive - Disassemble
3408E and 3412E Engines for Caterpillar Built Machines Cylinder Liner - Remove
773D, 773E, 775D and 775E Off-Highway Trucks Machine Systems Hydraulic Tank (Steering) - Assemble
773D, 773E, 775D and 775E Off-Highway Trucks Machine Systems Inverter Valve (Secondary Brake) - Install
3176C and 3196 Engines for Caterpillar Built Machines Fuel Transfer Pump
3408E and 3412E Engines for Caterpillar Built Machines Valve Rocker Arms, Lifters, and Bridges
Challenger 35, Challenger 45 and Challenger 55 Agricultural Tractors Implement, Steering and Brake Hydraulic Systems Implement Hydraulic Operational Checks
773D, 773E, 775D and 775E Off-Highway Trucks Machine Systems Retaining Ring and Pin (Body) - Remove and Install
3304B and 3306B Engines for Caterpillar Built Machines Cylinder Head - Remove
3406C Engines for Caterpillar Built Machines Front Housing and Covers
583R Pipelayer Engine Supplement Engine Side Guards - Remove and Install
836G Landfill Compactor and 834G Wheel Dozer Specifications
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Inverter Valve (Secondary Brake) - Assemble
836G Landfill Compactor and 834G Wheel Dozer Radiator Grill - Clean
836G Landfill Compactor and 834G Wheel Dozer Plate Locations and Film Locations
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.