D250E Series II and D300E Series II Articulated Trucks Machine Systems Caterpillar


Pressure Reducing Valve - Remove and Install

Usage:

D250E II 4PS

Removal Procedure

------ WARNING! ------

At operating temperature, the hydraulic tank is hot and under pressure.

Hot oil and components can cause personal injury. Do not allow hot oil or components to contact skin.

Remove the filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand. Remove the filler cap slowly in order to relieve pressure.



NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products.

Dispose of all fluids according to local regulations and mandates.


Note: Turn off the engine. Apply the foot brake several times in order to relieve the pressure in the brake system.

  1. Put identification marks on all lines, hoses, wires and tubes for installation purposes. Plug all lines, hoses and tubes. This helps prevent fluid loss and contamination of the oil system.


    Illustration 1g00479985

  2. Remove seven bolts (1) and hydraulic tank cover (2) from the machine.


    Illustration 2g00481366

  3. Remove pressure reducing valve (3) from secondary brake system (4).


    Illustration 3g00481367

  4. Remove two rings (5), seal O-ring (6), seal O-ring (7), ring (8), and seal O-ring (9) from the valve body.

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
A  1U-7253  Torque Wrench 

  1. Clean all parts and inspect all parts. If any parts are worn or damaged, use new Caterpillar parts for replacement.


    Illustration 4g00481367
    6E-4287 Seal Kit includes the rings and the seals.

  2. Install two rings (5), seal O-ring (6), seal O-ring (7), ring (8), and seal O-ring (9) to the valve body.


    Illustration 5g00481366

  3. Install pressure reducing valve (3) to secondary brake system (4). Use torque wrench (A) to tighten the valve to 61 ± 6 N·m (45 ± 4 lb ft).


    Illustration 6g00479985

  4. Install seven bolts (1) and hydraulic tank cover (2) to the machine.

Caterpillar Information System:

IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Gear Pump (Implement, Steering and Brakes) - Remove
Repairing the Nonmetallic Fenders, Machine Hoods, and Tank Covers {1273, 7251, 7252} Repairing the Nonmetallic Fenders, Machine Hoods, and Tank Covers {1273, 7251, 7252}
24H Motor Grader Power Train Hydraulic Filter (Differential)
980G Wheel Loader Braking System Parking Brake Control Cable - Adjust
D250E Series II and D300E Series II Articulated Trucks Machine Systems Hoist Control Valve - Assemble
980G Wheel Loader Braking System Parking Brake - Manual Release
69D and 769D Off-Highway Trucks and 771D Quarry Truck Unit Injector Hydraulic Pump Drive - Remove
Electronic Modular Control Panel II (EMCP II) For MUI Engines Alarm Module or Remote Annunciator - Troubleshoot
515 Wheel Skidder and 525 Wheel Skidder Walk-Around Inspection
950G and 962G Wheel Loaders and IT62G Integrated Toolcarrier Machine Systems Main Control Valve and Mounting Plate (Lift and Auxiliary) - Remove
3304B and 3306B Engines for Caterpillar Built Machines Air Compressor - Remove and Install
950G and 962G Wheel Loaders and IT62G Integrated Toolcarrier Machine Systems Main Control Valve and Mounting Plate (Lift and Auxiliary) - Install
Installation of 164-4636 Coolant Recovery Tank {1354} Installation of 164-4636 Coolant Recovery Tank {1354}
950G Wheel Loader, 962G Wheel Loader and IT62G Integrated Toolcarrier Hydraulic System Pilot Valve
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0144 FMI 03 Relay (Backup Alarm) Voltage Above Normal - Test
Electronic Modular Control Panel II (EMCP II) For MUI Engines Zero Display of Voltage or Current - Troubleshoot
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Slack Adjuster (Rear) - Assemble
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Slack Adjuster (Rear) - Disassemble
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Gear Pump (Implement, Steering and Brakes) - Install
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Slack Adjuster (Rear) - Install
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Hydraulic Caliper Service Brake - Assemble
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Electric Drive Pump (Secondary Steering) - Remove
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Slack Adjuster (Rear) - Remove
950G and 962G Wheel Loaders and IT62G Integrated Toolcarrier Machine Systems Main Control Valve (Tilt and Auxiliary) - Remove
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.