3516C IMO III Petroleum Engines Caterpillar


Air Shutoff - Remove and Install

Usage:

3516C NG3

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
395-1099  Lifting Eye Assembly 
207-1601  Rubber Lubricant 


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


------ WARNING! ------

Personal injury can result from parts and/or covers under spring pressure.

Spring force will be released when covers are removed.

Be prepared to hold spring loaded covers as the bolts are loosened.


------ WARNING! ------

Personal injury or death can occur from not following the proper procedure or the recommended tooling.

To prevent the possibility of injury or death, follow the established procedure using the recommended tooling.




    Illustration 1g06321938

  1. Remove bolts (1).

  2. Disconnect harness assembly (2).


    Illustration 2g06321940

  3. Remove cable straps (3) and position sensors (4).


    Illustration 3g06321964

  4. Remove bolts (5).

  5. Remove bolts (6) and strap (7).


    Illustration 4g06321974

  6. Loosen bolts (8) and clamp (9).


    Illustration 5g06322006

  7. Remove nuts (12) and bolts (13).

  8. Use a suitable lifting device with Tooling (A) and remove air shutoff group (11) with air pipe (10). The combined weight of air pipe (10) and air shutoff group (11) is approximately 23 kg (51 lb).


    Illustration 6g06322016

  9. Remove bolts (19) with bracket (17).

  10. Remove bolts (15) with clips (16).

  11. Separate air shut off valve assembly (18) and air inlet elbow (14).

Installation Procedure



    Illustration 7g06322016

  1. Position air inlet elbow (14) with air shut off valve assembly (18).

  2. Install bolts (15) with clips (16), bolt (20) with bracket (17), and bolt (19) finger tight. Align bolted joints to reduce assembly preload.

    Note: Tighten bolts (15), (19), and (20) in the following sequence.

  3. Tighten bolts (19).

  4. Tighten bolts (20) with bracket (17).

  5. Tighten bolts (15) and clips (16). Orient grommet with the cut inside the open area of clip (16).


    Illustration 8g06322006

  6. Lubricate O-ring seals on air pipe (10) with Tooling B and install in air shutoff group (11).

  7. Use a suitable lifting device with Tooling (A) and install air shutoff group (11) with air pipe (10). The combined weight of air pipe (10) and air shutoff group (11) is approximately 23 kg (51 lb).

  8. Tighten nuts (12) and bolts (13) to a torque of 35 ± 5 N·m (26 ± 4 lb ft).


    Illustration 9g06321974

  9. Tighten bolts (8) to a torque of 40 ± 2 N·m (30 ± 1 lb ft).

  10. Tighten clamp (9).


    Illustration 10g06321964

  11. Install bolts (5).

  12. Install strap (7) with bolts (6).


    Illustration 11g06321940

  13. Install position sensors (4) and cable straps (3).

  14. Tighten position sensor nuts to a torque of 30 ± 3 N·m (22 ± 2 lb ft).


    Illustration 12g06321938

  15. Connect harness (2).

  16. Install bolts (1).
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.