Introduction

This Special Instruction provides the Disassembly and Assembly, the Inspection, and the Troubleshooting needed for servicing the flexible couplings for the above C175-16 Locomotive and Petroleum Engines.

Note: Do not damage the coupling with tools (wrench, hammer, etc.) during assembly and installation. Do not step on the coupling.

Note: Any impacts to the surface of the coupling can lead to damages of the fiber reinforced plastic. These impacts are not necessarily visible from the outside. These impacts may reduce the service life of the coupling.

Disassembly and Assembly

Disassembly of the 329-0236 Flexible Coupling Gp , 350-7171 Flexible Coupling Gp , 350-7182 Flexible Coupling Gp , and 396-3847 Flexible Coupling Gp .

  1. Remove the flexible coupling gp guards.

  1. Disconnect the generator from the flexible coupling gp.

  1. Using a suitable lifting device, remove the generator from the engine. The generator weighs approximately 6804 kg (15000 lb).

    Note: Always refer to the manufacture's identification plate on the generator for the correct weight.




    Illustration 1g03354490

    (1) 349-5263 Flywheel As

    (2) Flexible coupling gp

    (3) Inner star flange

    (4) 166-1880 Bolt

    (5) 199-7107 Spring

  1. Remove two bolts (4) and two springs (5) from flexible coupling gp (2) .

    Note: The two bolts and springs need to be opposite from one another.

  1. Install two M20 x 2.5 dowels into flywheel (1) where bolts (4) were removed.

  1. Remove the remaining bolts (4) and springs (5) .

    Note: Approximately 4 L (1 US gal) of oil will drain from the flexible coupling gp when separated from the flywheel.

    Note: Use the threaded holes on the face of the coupling for lifting.

  1. Using a suitable lifting device, remove flexible coupling gp (2). The flexible coupling gps weigh approximately:

    • 329-0236 Flexible Coupling Gp 102 kg (225 lb)

    • 350-7171 Flexible Coupling Gp 102 kg (225 lb)

    • 350-7182 Flexible Coupling Gp 102 kg (225 lb)

    • 396-3847 Flexible Coupling Gp 102 kg (225 lb)




    Illustration 2g03440142

    (2) Flexible coupling gp

    (6) Spring pack assembly

  1. Rest the flexible coupling gp (2) onto the inner star flange with the spring pack assembly side facing up. Refer to Illustration 2 for the correct placement of the flexible coupling gp.



    Illustration 3g03356290

    (2) Flexible coupling gp

    (3) Inner star flange

    (7) Bolt

    (8) Washer

    (9) Centering ring

    (10) Outside O-ring

    (11) End cover

  1. Remove O-ring (10) from the flexible coupling gp (2) .

    Note: The O-ring may be stuck to the flywheel.

  1. Remove bolts (7) and washers (8) from end cover (11) .

  1. Remove end cover (11) from inner star flange (3) and center ring (9) .



    Illustration 4g03440540

    (2) Flexible coupling gp

    (9) Centering ring

    (12) Inside O-ring

    (13) 337-3140 Seal

  1. Remove O-ring (12) from centering ring (9) .

  1. Remove seal (13) from centering ring (9) .



    Illustration 5g03441117

    (2) Flexible coupling gp

    (3) Inner star flange

    (9) Centering ring

  1. Rest flexible coupling gp (2) on centering ring (9) .

  1. Remove inner star flange (3) from flexible coupling gp (2) .



    Illustration 6g03441536

    (14) Outer coupling flange

    (15) Bolt

    (16) Washer

  1. Remove bolts (15) and washers (16) from the flexible coupling gp.

  1. Rest the flexible coupling gp on outer coupling flange (14) .



    Illustration 7g03356654

    (2) Flexible coupling gp

    (9) Centering ring

    (17) Bolt

    (18) Washer

  1. Remove bolts (17) and washers (18) from centering ring (9) .

  1. Remove centering ring (9) from flexible coupling gp (2) .



    Illustration 8g03356561

    (6) Spring pack assembly

    (10) Outside O-ring

    (14) Outer coupling flange

  1. Remove spring pack assembly (6) from outer coupling flange (14) .

  1. Remove O-ring (10) from outer coupling flange (14) .



    Illustration 9g03354492

    (3) Inner star flange

    (11) End cover

    (19) O-ring

  1. Remove one O-ring (19) from inner star flange (3) and end cover (11) .

Disassembly of the 377-2138 Flexible Coupling Gp , 385-7508 Flexible Coupling Gp , and 372-5244 Flexible Coupling Gp .

  1. Remove the flexible coupling gp guards.



    Illustration 10g03457898

    (1) 349-5263 Flywheel As

    (2) Flexible coupling gp

    (20) Membrane

    (21) Generator hub

    (22) Hub adapter

  1. Remove hub adapter (22) from generator hub (21) and membrane (20) .



    Illustration 11g03422705

    (2) Flexible coupling gp

    (20) Membrane

    (23) Bolt

    (24) Assembly sleeve

  1. Remove two bolts (23) and two assembly sleeves (24) from membrane (20) .

    Note: The two bolts and springs need to be opposite from one another.

  1. Install two M8 X 1.25 dowels into flexible coupling gp (2) where bolts (23) were removed.

  1. Remove the remaining bolts (23) and assembly sleeves (24) .

  1. Remove membrane (20) from flexible coupling gp (2) .



    Illustration 12g03422682

  1. Remove two bolts (4) and two springs (5) from flexible coupling gp (2) .

    Note: The two bolts and springs need to be opposite from one another.

  1. Install two M20 x 2.5 dowels into flywheel (1) where bolts (4) were removed.

  1. Remove the remaining bolts (4) and springs (5) .

    Note: Approximately 4 L (1 US gal) of oil will drain from the flexible coupling gp when separated from the flywheel.

    Note: Use the threaded holes on the face of the coupling for lifting.

  1. Using a suitable lifting device, remove flexible coupling gp (2). The flexible coupling gps weigh approximately:

    • 377-2138 Flexible Coupling Gp 109 kg (240 lb)

    • 385-7508 Flexible Coupling Gp 109 kg (240 lb)

    • 372-5244 Flexible Coupling Gp 109 kg (240 lb)




    Illustration 13g03441336

    (2) Flexible coupling gp

    (6) Spring pack assembly

  1. Rest the flexible coupling gp (2) onto inner star flange (3) with the spring side facing up. Refer to Illustration 13 for the correct placement of the flexible coupling gp.



    Illustration 14g03422727

    (2) Flexible coupling gp

    (3) Inner Star Flange

    (9) Centering ring

    (10) Outside O-ring

    (25) Bolt

    (26) Washer

    (27) End cover

  1. Remove O-ring (10) from the flexible coupling gp (2) .

    Note: The O-ring may be stuck to the flywheel.

  1. Remove bolts (25) and washers (26) from end cover (27) .

  1. Remove end cover (27) from inner star flange (3) and centering ring (9) .



    Illustration 15g03441360

    (2) Flexible coupling gp

    (9) Centering ring

    (12) Inside O-ring

    (13) 337-3140 Seal

  1. Remove O-ring (12) from centering ring (9) .

  1. Remove seal (13) from centering ring (9) .



    Illustration 16g03441364

    (2) Flexible coupling gp

    (3) Inner star flange

    (9) Centering ring

  1. Rest flexible coupling gp (2) on centering ring (9) .

  1. Remove inner star flange (3) from flexible coupling gp (2) .



    Illustration 17g03441536

    (14) Outer coupling flange

    (15) Bolt

    (16) Washer

  1. Remove bolts (15) and washers (16) from the flexible coupling gp.

  1. Rest the flexible coupling gp on outer coupling flange (14) .



    Illustration 18g03356654

    (2) Flexible coupling gp

    (9) Centering ring

    (17) Bolt

    (18) Washer

  1. Remove centering ring (9) from flexible coupling gp (2) .



    Illustration 19g03356561

    (6) Spring pack assembly

    (10) Outside O-ring

    (13) Outer coupling flange

  1. Remove spring pack assembly (6) from outer coupling flange (14) .

  1. Remove O-ring (10) from outer coupling flange (14) .



    Illustration 20g03422775

    (3) Inner star flange

    (9) End cover

    (19) O-ring

    (27) End cover

  1. Remove one O-ring (19) from inner star flange (3) and end cover (27) .

Assembly of the 329-0236 Flexible Coupling Gp , 350-7171 Flexible Coupling Gp , 350-7182 Flexible Coupling Gp , and 396-3847 Flexible Coupling Gp .

  1. Clean and inspect every part carefully before assembly.

    Note: Venting holes as well as oil supply and return holes must be free of dirt and contamination. Thoroughly remove any carbon deposits that may be present in the spring chambers.

  1. Replace all bolts up to and including thread size M20.

    Bolts larger than M20 may only be reused if the following criteria are met:

    • The bolt head must not be damaged.

    • The bolt thread must not be damaged or stretched.

    • The surface on which the bolt head rests must not be damaged.

    • The bolt must be cleaned completely.




    Illustration 21g03356561

    (6) Spring pack assembly

    (10) Outside O-ring

    (14) Outer coupling flange

  1. Coat one O-ring (10) and the O-ring groove of outer coupling flange (14) with Molykote 111 or equivalent.

  1. Install one O-ring (10) into the O-ring groove of outer coupling flange (14) .

  1. Install spring pack assembly (6) onto outer coupling flange (14) .



    Illustration 22g03356667

    (6) Spring pack assembly

    (7) Bolt

    (8) Washer

    (9) Centering ring

    (14) Outer coupling flange

    Note: Make sure that the oil return hole in centering ring (9) and the oil return groove in the intermediate piece of spring pack assembly (6) are aligned.

  1. Attach centering ring (9) to outer coupling flange (14) with four bolts (7) and four washers (8). Use Loctite 243 on bolts (7) .

    Torque bolts ... 30 ± 3 N·m (22 ± 2 lb ft)

  1. Coat the O-ring running surface of outer coupling flange (15) with Molykote 2484 or equivalent.



    Illustration 23g03356388

    (6) Spring pack assembly

    (14) Outer coupling flange

    (15) Bolt

    (16) Washer

  1. Attach outer coupling flange (14) to spring pack assembly (6) with two bolts (15) and two washers (16) .

    Torque bolts ... 71 ± 7 N·m (52 ± 5 lb ft)




    Illustration 24g03356694

    (2) Flexible coupling gp

    (3) Inner star flange

    (19) O-ring

  1. Coat one O-ring (19) and the O-ring groove of inner star flange (3) with Molykote 111 or equivalent.

  1. Install one O-ring (19) onto inner star flange (3) .

  1. Protect all outer surfaces (surfaces which are later inside the coupling) of inner star flange (3) including the grooves against rust with a thin coat of Tectyl oil.

  1. Rest inner star flange (3) onto a flat surface. Refer to Illustration 31 for the correct orientation.

  1. Install flexible coupling gp (2) onto inner star flange (3) .

    Note: Make sure that the spring packs are aligned with inner star flange grooves.




    Illustration 25g03356704

    (2) Flexible coupling gp

    (9) Centering ring

    (11) End cover

    (17) Bolt

    (18) Washer

    (19) O-ring

  1. Coat one O-ring (19) and the O-ring groove of end cover (11) with Molykote 111 or equivalent.

  1. Install one O-ring (19) onto end cover (9) .

  1. Coat the O-ring running surface of centering ring (11) with Molykote 2484 or equivalent.

  1. Install end cover (11) into centering ring (9) .

  1. Attach end cover (9) to inner star flange (3) with seven bolts (17) and seven washers (18). Use Loctite 243 on bolts (18) .

    Torque bolts ... 14 ± 1.4 N·m (124 ± 12 lb in)




    Illustration 26g03425291

    (9) Centering ring

    (12) Inside O-ring

    (13) 337-3140 Seal

  1. Install one seal (13) into centering ring (9) .

  1. Install one O-ring (12) into centering ring (9) .



    Illustration 27g03357141

    (1) 349-5263 Flywheel As

    (2) Flexible coupling gp

    (4) 166-1880 Bolt

    (5) 199-7107 Spring

  1. Install two M20 x 2.5 dowels into flywheel (1) .

    Note: The two dowels need to be opposite from one another.

    Note: Do not lift the coupling on possible existing inserts in the flanges.

  1. Using a suitable lifting device, install flexible coupling gp (2). The flexible coupling gps weigh approximately:

    • 329-0236 Flexible Coupling Gp 96 kg (212 lb)

    • 350-7171 Flexible Coupling Gp 96 kg (212 lb)

    • 350-7182 Flexible Coupling Gp 96 kg (212 lb)

    • 396-3847 Flexible Coupling Gp 106 kg (234 lb)

    Note: Apply Loctite 243 onto both sides of springs (5) .

  1. Attach flexible coupling gp (2) to flywheel (1) with 12 bolts (4) and 12 springs (5) .

    Torque bolts ... 540 ± 70 N·m (398 ± 52 lb ft)

  1. Remove the two dowels from flywheel (1) .

    Note: Apply Loctite 243 onto both sides of springs (5) .

  1. Install the remaining two bolts (4) and two springs (5) into flywheel (1) .

    Torque bolts ... 540 ± 70 N·m (398 ± 52 lb ft)

  1. Using a suitable lifting device, attach the generator to the engine. The generator weighs approximately 6804 kg (15000 lb).

    Note: Always refer to the manufacture's identification plate on the generator for the correct weight.

  1. Align the generator with the engine.

  1. Connect the generator hub to the flexible coupling gp.

    Torque bolts ... 240 ± 24 N·m (177 ± 18 lb ft)

  1. Install the flexible coupling gp guards.

Assembly of the 377-2138 Flexible Coupling Gp , 385-7508 Flexible Coupling Gp , and 372-5244 Flexible Coupling Gp .

  1. Clean and inspect every part carefully before assembly.

    Note: Venting holes as well as oil supply and return holes must be free of dirt and contamination. Thoroughly remove any carbon deposits that may be present in the spring chambers.

  1. Replace all bolts up to and including thread size M20.

    Bolts larger than M20 may only be reused if the following criteria are met:

    • The bolt head must not be damaged.

    • The bolt thread must not be damaged or stretched.

    • The surface on which the bolt head rests must not be damaged.

    • The bolt must be cleaned completely.




    Illustration 28g03356561

    (6) Spring pack assembly

    (10) Outside O-ring

    (14) Outer coupling flange

  1. Coat one O-ring (10) and the O-ring groove of outer coupling flange (14) with Molykote 111 or equivalent.

  1. Install one O-ring (10) into the O-ring groove of outer coupling flange (14) .

  1. Install spring pack assembly (6) onto outer coupling flange (14) .



    Illustration 29g03356667

    (6) Spring pack assembly

    (7) Bolt

    (8) Washer

    (9) Centering ring

    (14) Outer coupling flange

    Note: Make sure that the oil return hole in centering ring (9) and the oil return groove in the intermediate piece of spring pack assembly (6) are aligned.

  1. Snuggly attach centering ring (9) to outer coupling flange (14) with four bolts (7) and four washers (8). Use Loctite 243 on bolts (7) .

  1. Rotate assembled parts on a turn table to align centering ring (9) .

    Use a dial indicator to check the alignment. The maximum concentricity is 0.2 mm (0.008 inch).

    When a high spot is found, lightly tap the high spot until centering ring (9) is within the maximum concentricity.

  1. Finish tightening bolts (7) .

    Torque bolts ... 30 ± 3 N·m (22 ± 2 lb ft)

  1. Coat the O-ring running surface of outer coupling flange (15) with Molykote 2484 or equivalent.



    Illustration 30g03356388

    (6) Spring pack assembly

    (14) Outer coupling flange

    (15) Bolt

    (16) Washer

  1. Attach outer coupling flange (14) to spring pack assembly (18) with two bolts (15) and two washers (16) .

    Torque bolts ... 71 ± 7 N·m (52 ± 5 lb ft)




    Illustration 31g03356694

    (2) Flexible coupling gp

    (3) Inner star flange

    (19) O-ring

  1. Coat one O-ring (19) and the O-ring groove of inner star flange (3) with Molykote 111 or equivalent.

  1. Install one O-ring (19) onto inner star flange (3) .

  1. Protect all outer surfaces (surfaces which are later inside the coupling) of inner star flange (3) including the grooves against rust with a thin coat of Tectyl oil.

  1. Rest inner star flange (3) onto a flat surface. Refer to Illustration 31 for the correct orientation.

  1. Install flexible coupling gp (2) onto inner star flange (3) .

    Note: Make sure that the spring packs are aligned with inner star flange grooves.




    Illustration 32g03424896

    (2) Flexible coupling gp

    (3) Inner star flange

    (9) Centering ring

    (13) Bolt

    (14) Washer

    (19) O-ring

    (25) Bolt

    (26) Washer

    (27) End cover

  1. Coat one O-ring (19) and the O-ring groove of end cover (27) with Molykote 111 or equivalent.

  1. Install one O-ring (19) onto end cover (27) .

  1. Coat the O-ring running surface of centering ring (9) with Molykote 2484 or equivalent.

  1. Install end cover (27) into centering ring (9) .

  1. Attach end cover (27) to inner star flange (3) with eight bolts (25) and eight washers (26). Use Loctite 243 on bolts (23) .

    Torque bolts ... 71 ± 7 N·m (52 ± 5 lb ft)




    Illustration 33g03425007

    (9) Centering ring

    (12) Inside O-ring

    (13) 337-3140 Seal

  1. Install one seal (13) into centering ring (9) .

  1. Install one O-ring (12) into centering ring (9) .



    Illustration 34g03357141

    (1) 349-5263 Flywheel As

    (2) Flexible coupling gp

    (4) 166-1880 Bolt

    (5) 199-7107 Spring

  1. Install two M20 x 2.5 dowels into flywheel (1) .

    Note: The two dowels need to be opposite from one another.

    Note: Do not lift the coupling on possible existing inserts in the flanges.

  1. Using a suitable lifting device, install flexible coupling gp (2). The flexible coupling gps weigh approximately:

    • 377-2138 Flexible Coupling Gp 148 kg (326 lb)

    • 385-7508 Flexible Coupling Gp 148 kg (326 lb)

    • 372-5244 Flexible Coupling Gp 148 kg (326 lb)

    Note: Apply Loctite 243 onto both sides of springs (5) .

  1. Attach flexible coupling gp (2) to flywheel (1) with 12 bolts (4) and 12 springs (5) .

    Torque bolts ... 540 ± 70 N·m (398 ± 52 lb ft)

  1. Remove the two dowels from flywheel (1) .

    Note: Apply Loctite 243 onto both sides of springs (5) .

  1. Install the remaining two bolts (4) and two springs (5) into flywheel (1) .

    Torque bolts ... 540 ± 70 N·m (398 ± 52 lb ft)




    Illustration 35g03422884

    (20) Membrane

    (23) Bolt

    (24) Assembly sleeve

    (28) Retaining washers

  1. Clean the glued surface on membrane (20) with Aceton.

  1. Grind glued surfaces with 120 or 180 grit sandpaper.

  1. Remove sandpaper grains with a vacuum.

  1. Clean the glued surface on membrane (20) with Aceton.

  1. Grind the glued surface on retaining washers (28) and clean with Aceton.

  1. Apply Araldite 2014 onto retaining washers (28) .

  1. Install all retaining washers (28) into membrane (20) hand tight use one bolt (23) and assembly sleeve (24) per retaining washer.

  1. Remove the bolt and assembly sleeve, keep retaining washer in position by hand and remove surplus glue in the hole.

  1. Install the bolt and assembly sleeve hand tight. Make sure that the assembly sleeve rests right on the membrane surface.

  1. Heat the glue in an oven at following temperatures and times:

    • 60° C (140° F) for 40 minutes

    • 40° C (104° F) for 90 minutes

    • 20° C (68° F) for 6 hours

  1. Remove bolt and assembly sleeve



    Illustration 36g03422705

    (20) Membrane

    (23) Bolt

    (24) Assembly sleeve

  1. Attach membrane (20) to flexible coupling gp (2) with 14 bolts (23) and 14 assembly sleeves (24) .

    Torque bolts ... 30 ± 3 N·m (22 ± 2 lb ft)

  1. Remove the two dowels from the flexible coupling gp (2) .

  1. Install the remaining two bolts (23) and two assembly sleeves (24) into flexible coupling gp (2) .

    Torque bolts ... 30 ± 3 N·m (22 ± 2 lb ft)




    Illustration 37g03458138

    (20) Membrane

    (21) Generator hub

    (22) Hub adapter

  1. Attach hub adapter (22) to membrane (20) .

    Torque bolts ... 30 ± 3 N·m (22 ± 2 lb ft)

  1. Connect generator hub (21) to hub adapter (22) .

    Torque bolts ... 610 ± 61 N·m (450 ± 45 lb ft)

  1. Install the flexible coupling gp guards.

Inspection

  1. Inspect the membrane for the following:

    • Scratches

    • Cracks

    • Defects

    • Damage




    Illustration 38g03354493

    (6) Spring pack assembly

    (29) Intermediate piece

  1. Check the divergence from concentricity at the inside diameter of all intermediate pieces (29). Refer to Table 1 for the correct dimension.

    Table 1
    Maximum Concentricity for the Inner Diameter    

    0.2 mm (0.008 inch)    

    If the inside diameter is out of tolerance, contact customer service or a customer service location to discuss the issue in more detail.

    Note: Replace all O-rings at least 6 years after the start of operation.




    Illustration 39g03354489

    Middle blades

    (29) Intermediate piece

    (30) Spring blade

    (31) Bronze shim

    Note: Wear or deformation of bronze shims (31) (in the case of multiple blades), which are inserted between the spring blades, is normal and therefore no reason to service or exchange the spring packs.




    Illustration 40g03355502

    (A) Permissible wear

    (B) Thickness of middle blade.

    Note: Maximum permissible wear at the inner ends is half the thickness of the middle blade.

  1. Measure the permissible wear (A) per contact side of middle blade (B) .



    Illustration 41g03354896

    Inner star flange

    (C) The wear value to the groove flanks

  1. Measure the wear value (C) on the groove flanks. Refer to Table 2 for the correct dimension.

    Table 2
    Maximum Dimension (C)    

    1 mm (0.039 inch)    

    If damage or wear is identified but not described above, contact customer service or a customer service location to discuss the issue in more detail.




    Illustration 42g03422709

    (D) Radial bearing clearance

    (3) Inner star flange

    (14) Outer coupling flange

    (32) Bearing in the outer coupling flange




    Illustration 43g03422728

    (D) Radial bearing clearance

    (9) Centering ring

    (27) End Cover

    (33) Bearing in the centering ring




    Illustration 44g03424946

    (E) Axial bearing clearance

    (2) Flexible coupling gp

    (3) Inner star flange

  1. Measure radial bearing clearance (D) and axial bearing clearance (E). Refer to Table 3 for the correct bearing clearance.

    Note: Axial bearing clearance (E) is the total back and forth movement of inner star flange (3).

    Table 3
    Bearing Condition     Radial Bearing Diameter Clearance     Axial Bearing Total Clearance    
    New    
    0.11 mm (0.004 inch) to
    0.27 mm (0.011 inch)    

    0.3 mm (0.012 inch) to
    0.4 mm (0.016 inch)    
    Used     Max.
    0.54 mm (0.021 inch)    
    Max.
    0.8 mm (0.032 inch)    

Troubleshooting

Mechanical damage to the coupling can be caused by the following:

  • Impact from heavy objects like tools and so on

  • Overload of the coupling

  • Other unknown sources

Due to the smaller wall thickness and the higher stress level compared to the conical shaft region, damages on the membrane are more critical for the structural integrity of the coupling than damages on the conical shaft.

Table 4
Inspected Condition     Corrective Measure    
O-rings sweat during operation.
Oil traces are present radially on the flange and side plate.
No drips are formed.    
No effect on the function of the coupling.
No repair required.    
O-rings leaking.
Drips are formed.    
Remove and dismantle coupling.
Replace O-rings.
Check lead-in grooves and replace worn parts, if applicable.    
Traces of oil in a radial position on the flange or side plate.
Main bolts (4) leaking.    
Loosen leaking main bolts, reseal the bolts and tighten.    
Traces of oil in a radial position on the side plate.
Bolts (if venting screw present) leaking.    
Loosen leaking bolts.
Reseal the bolts and tighten.    
Wear at the middle blades greater than the permissible wear dimension (A).     Replace the spring pack assembly (18) (by customer service or a customer service location.)    
Wear or deformation of the bronze shims (31) in the case of multiple blades.     No influence on the function of the coupling.
First exchanged when the spring packs (18) were completely replaced.    
Wear at the groove flanks greater than the permissible wear dimension (C).     Replace inner star flange (3) or rework groove flank.
Clarify with customer service or a customer service location.    
Signs of wear on the outer diameter of inner star flange (3) in the area of intermediate pieces (29), outer coupling flange (15), or flywheel (1).     Check alignment of shaft and correct. Replace damaged parts, if necessary. (Clarify with customer service or a customer service location.)    
Bearing play more than permissible.
See the inspection section for permissible values.    
Repair or replace worn parts.    
Signs of abrasion marks (fretting) on the running surfaces of bearings.     Replace damaged/worn parts. Contact customer service or a customer service location.    
Signs of oil carbon deposits near the spring chambers     No appreciable impairment of the coupling functions.    
The quality of the oil does not match the specification by the engine manufacturer or higher water content in the engine oil than permitted by the engine manufacturer. No damage to engine bearings.     Remove venting screws (if present). Drain coupling completely. Vent coupling and supply fresh oil with a pre-lubrication pump (engine or gear circuit) until oil escapes from the venting hole.    
The quality of the oil does not match the specification by the engine manufacturer or higher water content in the engine oil than permitted by the engine manufacturer. Bearing positions in engine already damaged as a result of this.     Remove flexible coupling gp (2) and perform a full inspection.    
Parallel fiber cracks in the Epoxi resin matrix.     Normally not critical and do not affect the structural integrity of the coupling No influence to the function of the coupling Coupling repair is not required    
Visible fiber failures or other heavy damages like delaminations (separation of the single layers of the composite).     Reduce the driving torque to a minimum during service. Run the engine in emergency service only.
Note: Do not repair the reinforced plastic components
Dismantle coupling and send the coupling back to customer service location.    
Audible cracking noise during slow rotation.     Reduce the driving torque to a minimum during service. Run the engine in emergency service only.
Note: Do not repair the reinforced plastic components.
Dismantle coupling and send the coupling back to customer service location.    
Not clear if the damage is critical or not.     Take a photo, document kind and extent of the damage, and contact customer service for judgment.    
Damages of the paint (if present).     Does not affect to the operational safety and the service life.    

Note: If other damage or wear to the product is identified but not described in this table, contact customer service or a customer service location.

Caterpillar Information System:

C9 Engine Belts - Inspect/Adjust/Replace
UPS 750 Uninterruptible Power Supply System Description
2013/03/13 A New Bracket and Related Components, for the Exhaust Manifold Group, Are Used on Certain C27 Industrial Engines {1059}
2014/05/20 New Camshafts Are Used for Certain C27 and C32 Commercial Engines {1210}
C1.5 and C2.2 Industrial Engines Ignition Keyswitch Circuit and Battery Supply Circuit - Test
C1.5 and C2.2 Industrial Engines Engine Pressure Sensor Open or Short Circuit - Test
G3516H and G3520H Generator Set Engines Ignition Transformer
C13 Industrial Engines Product Lifting
C9.3 Industrial Engine Manual Stop Procedure
2013/03/08 New Water Temperature Regulators Are Available for 3600, G3600, and C280 Engines {1355, 1393}
UPS 750 Uninterruptible Power Supply Model View Illustrations
Installation of Coolant Lines for the Throttle Actuator on CG137 Engines{1265, 1266} Installation of Coolant Lines for the Throttle Actuator on CG137 Engines{1265, 1266}
2013/03/05 A New Procedure Is Now Used On Certain C9 Engines When Torquing The Alternator Bracket {1405}
Retrofit SCR Aftertreatment Maintenance Recommendations
Marine Selective Catalytic Reduction (SCR) Retrofit Aftertreatment Hoses and Clamps - Inspect/Replace
C3.3B Tier 4 Final Engines for Caterpillar Built Machines Speed/Timing Sensor
C9 Engine Plate Locations and Film Locations
349F and 352F Excavators Diesel Exhaust Fluid - Fill
3516B Engine for the MT4400D Off-Highway Truck Turbocharger
Comm Adapter 3 and Computer Settings for Tier 4 Final Engines {1926, 7610, 7620} Comm Adapter 3 and Computer Settings for Tier 4 Final Engines {1926, 7610, 7620}
374F Excavator Engine and Machine Warm-Up
UPS 750 Uninterruptible Power Supply Specifications
777F, 777G, and 785D OEM Off-Highway Truck/Tractors Water Delivery System Piston Motor (Water Pump) Speed - Test
2013/03/15 A New Software Update Is Used For Certain C18 Tier 4 Engines {1901, 1920}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.