Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-1854  Retaining Ring Pliers 
Plate
51.0 by 102.0 by 6.0 mm (2.00 by 4.00 by 0.25 inch) 
1P-1857  Retaining Ring Pliers 
Tube
57.0 by 203.0 by 6.0 mm (2.25 by 8.00 by 0.25 inch) 
1P-0510  Driver Gp 
2S-3230  Bearing Lubricant 


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.




    Illustration 1g00925323

  1. Install O-ring seals (54) on rotor cylinder (53). Install the rotor cylinder in motor housing (3). Orient pin (55) of the rotor cylinder with slot (56) in the motor housing.


    Illustration 2g00925216

  2. Install O-ring seals (52) onto rotor cylinder (53).


    Illustration 3g01142958

  3. Install rear end plate (45) on the shaft of rotor (48).

  4. Install O-ring seal (46) over the shaft of the rotor.


    Illustration 4g01142960

  5. Apply Tooling (F) to bearing (44). Install bearing (44) into rear end plate (45) and over the shaft of rotor (48).

  6. Install rotor clamp nut (42) on the shaft of the rotor. Orient the shoulder of the nut toward the bearing.


    Illustration 5g01142961

  7. Tighten rotor clamp nut (42) in order to obtain a clearance of 0.03 to 0.08 mm (0.001 to 0.003 inch) between the rear end plate (45) and rotor (48). Measure the clearance with a feeler gauge. Tighten hex socket head bolt (43) to secure rotor clamp nut (42). Measure the clearance again.


    Illustration 6g00925356

  8. Install rotor (48) into motor housing (3). Align pin (57) into the slot of the rear end plate.


    Illustration 7g01142988

  9. Thoroughly lubricate vanes (47) with SAE 10W oil and install vanes (47) into the rotor.

  10. Install front end plate (50) onto the rotor. Align small hole (58) of front end plate onto rotor pin (59).


    Illustration 8g00925361

  11. Install washers (51) over the shaft of the rotor onto the front end plate.


    Illustration 9g00925366

  12. Apply Tooling (F) to bearing (49). Use Tooling (E) and a suitable press to install bearing (49) in the front end plate.


    Illustration 10g00925116

  13. Install rotor pinion (40). Install bolt (41). Tighten the bolt to a torque of 120 N·m (90 lb ft).


    Illustration 11g00925384

  14. Install O-ring seal (60). Install cover (39) onto motor housing (3).


    Illustration 12g00925390


    Illustration 13g00925391

  15. Apply Tooling (F) to bearing (33). Install bearing (33) and new retaining ring (32) onto drive shaft (17). Use Tooling (D) and a suitable press to complete the installation of the new retaining ring.

    Note: Do not reuse retaining ring (32).



    Illustration 14g01052459

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  16. Install retaining ring (31). Install bolt (23), lockwasher (24), and washer (25) into drive shaft (17). Apply Tooling (F) to bearing (26) and install bearing (26) into the drive shaft. Install bolt (23), lockwasher (24), and washer (25) into drive shaft (17). Apply Tooling (F) to bearing (26) and install the bearing into the drive shaft. Install driving clutch jaw (27), driven clutch jaw (28), spring (29), and cup (30) into the drive shaft. Install retaining ring (31). Thoroughly lubricate the drive assembly with SAE 10W oil.


    Illustration 15g01143059

  17. Use Tooling (E) to install lip seal (21) into piston (14). Install O-ring seal (22).


    Illustration 16g00925419

  18. Install piston (14) onto the drive shaft (17). Install retaining ring (20) onto the piston.


    Illustration 17g01143104

  19. Install O-ring seals (19) onto bulkhead (18). Install bulkhead (18) onto piston (14).


    Illustration 18g01143117

  20. Install drive gear (7) onto drive shaft (17). Use a 5/16 inch hex wrench to tighten the bolt of the drive gear to 77 N·m (57 lb ft).


    Illustration 19g01143120

  21. Use Tooling (E) to install lip seal (38) into drive housing (5).


    Illustration 20g01143123

  22. Apply Tooling (F) to bearing (37) and install the bearing into the drive housing.

  23. Install spring seat (36) into the drive housing.


    Illustration 21g00925068

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  24. Install return spring (16) onto the spring seat inside drive housing (5).

  25. Install the drive gear, the piston, and the drive shaft onto the return spring as a unit.

    Install retaining ring (15) over the piston. Place Tooling (B) between the drive gear and piston (14). Use a suitable press to compress return spring (16). Install retaining ring (15) into the groove of the drive housing. Slowly release the press and remove Tooling (B).



    Illustration 22g00925061

  26. Install O-ring seal (13) to drive housing (5).


    Illustration 23g00925105

  27. Apply Tooling (F) to bearing (34) and install bearing (34) into gear case (6). Use Tooling (C) to install lock ring (35).


    Illustration 24g01143454

  28. Install drive housing (5) on gear case (6). Make sure that the shaft on the end of the drive gear is correctly engaged with the bearing in the gear case. Install bolts (12) and tighten to a torque of 36 N·m (27 lb ft).


    Illustration 25g00925470

  29. Use Tooling (A) to install retaining ring (8).


    Illustration 26g01143442

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


    Note: Bolt (9) has left hand threads.

  30. Install pinion spring (62), spring sleeve (61), and drive pinion (11). Install washer (10) and bolt (9). Tighten bolt (9) to a torque of 110 N·m (80 lb ft).

    Note: Bolt (9) has left hand threads.



    Illustration 27g00925012

  31. Install gear case (6) and drive housing (5) onto motor housing (3). Install bolts (4) and tighten evenly to a torque of 80 N·m (60 lb ft).


    Illustration 28g00925011

  32. Install the gasket, elbow (1), and bracket (2) on motor housing (3).

  33. After you verify that the starting motor operates properly, attach the air lines to the starting motor.

Verify the Operation of the Air Starting Motor

Use the following procedure to verify that the air starting motor is operating correctly:

  1. Turn the drive pinion by hand in the direction of the rotation of the starting motor. The drive clutch must operate smoothly with a clicking sound.

  2. Turn the drive pinion in the opposite direction of the rotation of the starting motor. The drive pinion must turn by hand.

  3. Apply 345 kPa (50 psi) of air pressure in the inlet of the drive housing. The drive pinion must move away from the drive housing and air must come out of the outlet of the drive housing.

  4. Plug the outlet of the drive housing. Apply 1034 kPa (150 psi) of air pressure in the inlet of the drive housing. Ensure that no air is leaking. Measure the dimension from the face of the drive pinion to the mounting face of the drive housing. The dimension must be 73.00 ± 2.0 mm (2.874 ± 0.08 inch). Remove the air pressure. Measure the dimension again. The dimension must be 44.5 ± 2.0 mm (1.75 ± 0.08 inch). Remove the plug from the outlet of the drive housing.

  5. Apply 620 kPa (90 psi) of air pressure in the inlet of the drive housing. The starting motor must run smoothly.

End By:

  1. Install the air starting motor.

Caterpillar Information System:

793F Off-Highway Truck Engine Supplement Modular Front End - Remove and Install
Reuse and Salvage of Water Pumps {1361} Reuse and Salvage of Water Pumps {1361}
3508, 3512 and 3516 Generator Set Engines Air Starting Motor - Disassemble
UPSB125 Uninterruptible Power Supply Alarm Operation
UPSB125 Uninterruptible Power Supply Auxiliary Connection
UPSB125 Uninterruptible Power Supply Battery Circuit Breaker Installation
UPSB125 Uninterruptible Power Supply Battery Packing Material Removal
UPSB125 Uninterruptible Power Supply Battery Service
UPSB125 Uninterruptible Power Supply Cable Routing
UPSB125 Uninterruptible Power Supply Cable Size Requirement
UPSB125 Uninterruptible Power Supply Circuit Breaker Recommendation
UPSB125 Uninterruptible Power Supply Communication Card Installation
349F and 352F Excavators Indicators and Gauges - Test
349F and 352F Excavators Radiator Core - Clean
C9.3 Engine for Wheel Tractor-Scrapers Engine Cranks but Does Not Start
3508, 3512 and 3516 Generator Set Engines Flywheel - Remove and Install
C32 Marine Engine Maintenance Recommendations - Engines Which Have "E" Ratings
G3304B and G3306B Engines Gear Group (Front)
TH31-E61 and TH35-E81 Petroleum Transmissions Maintenance Interval Schedule
Reuse and Testing of Fuel Injection Pump Housing {0374, 1000, 1250, 1300} Reuse and Testing of Fuel Injection Pump Housing {0374, 1000, 1250, 1300}
320E and 323E Excavators Swing Drive Oil - Change
C13, C15, and C18 Tier 4 Interim Engines Oil Contains Fuel
793F Off-Highway Truck Engine Supplement Hood - Remove and Install
2010/01/08 A New Oil Pan Gasket Is Used for Certain C18 Marine Engines, and Available for Certain 3406E and C15 and C18 Marine Engines {1302, 7555}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.