- Rotary Drill
- MD6250 (S/N: DN71-102,105-106,108-108,110-112,117-119; DN8102-102)
Introduction
This special instruction provides the information to rework the mast encoder on certain machines listed above.
Do not perform any procedure in this Special Instruction until you have read the information and you understand the information.
Safety Section
Do not operate or work on this product unless you have read and understood the instruction and warnings in the relevant Operation and Maintenance Manuals and relevant service literature. Failure to follow the instructions or heed the warnings could result in injury or death. Proper care is your responsibility. |
Failure to follow all safety guidelines prescribed in this document and by governing authorities and regulatory agencies may result in severe injury or death of personnel or machine damage. |
When removing a major component or attachment, ensure that it is properly blocked or secured before removing mounting hardware. An assembly that is disconnected without proper blocking may shift or fall, resulting in serious injury or death of personnel or machine damage. |
Personal injury or death can result from improper maintenance procedures. To avoid injury or death, follow the procedures exactly as stated below. |
Personal injury can result from improper handling of chemicals. Make sure you use all the necessary protective equipment required to do the job. Make sure that you read and understand all directions and hazards described on the labels and material safety data sheet of any chemical that is used. Observe all safety precautions recommended by the chemical manufacturer for handling, storage, and disposal of chemicals. |
Climbing equipment may be required to access this service point. Refer to the Operation and Maintenance Manual, "Mounting and Dismounting" topic for safety information. |
Before servicing/performing maintenance on the machine, electrical power must be physically disconnected; battery plugs must be disconnected from the batteries, or the trailing cable must be unplugged, and warning tags and padlocks shall be applied by a certified electrician. Certified electricians shall perform or direct any electrical work, including any energized testing, repair work in controllers, motors, or other approved compartments, and shall insure that all compartments are properly closed and inspected prior to re-energization. All applicable lock out and tag out procedures must be followed. |
Do not operate the machine if any guards or covers are missing or inadequately secured. Personnel could be seriously injured or machine damage may occur. |
Observe the safe working load limits of all lifting and blocking devices and keep a safe distance from suspended/blocked loads. Personnel may be seriously injured or killed by falling loads. |
Structures Rework (
Required Part
Required Part | |||
Item | Qty | Part Number | Part Name |
1 | 1 | 578-5758 | Shim |
2 | 1 | 118-5805 | Special Race Bearing |
3 | 1 | 487-5859 | Position Sensor Gp |
4 | 1 | 240-6577 | Threaded Rod |
5 | 1 | 487-5860 | Position Sensor |
6 | 1 | 469-2140 | Spacer |
7 | 1 | 578-0959 | Sheave |
Rework procedure
- To rework the crown, follow the set of instruction:
- Remove and discard cab side sheave and retain hoist cable.
- Remove and retain crown harness, depth encoder, and beacons.
- Remove and retain crown chain link.
- Cut cab side sheave bracket.
Note: Repair and repaint the surface.
Show/hide tableIllustration 2 g06426483 Show/hide tableIllustration 3 g06426541 Detail view of A
(D1)171.3 mm (6.74 inch)
(D2)104.8 mm (4.13 inch)
(D3)742.5 mm (29.23 inch)
(D4)700.5 mm (27.58 inch)
(D5)544 mm (21.4 inch)
(D6)447.5 mm (17.62 inch)
(D7)392.2 mm (15.44 inch)
(D8)332.2 mm (13.08 inch) - Drill four holes of diameter
18 mm (0.7 inch) on the plate as shown in Illustration 3 and Illustration 2.
Illustration 1 | g06422115 |
Before rework |
- Install sheave (7) with bearing (2), shim packs (1), position sensor (3), threaded rod (4)(
40 ± 1.5 mm (1.6 ± 0.06 inch) ), position sensor (5), and spacer (6) to 578-0957 Mounting Bracket Gp.Connect the hoist cable.
Reference: Testing and Adjusting, M0074458, "Mast - Test and Adjust - Hoist Pulldown Auto Tension"
Illustration 4 | g06426618 |
(1) (2) (3) (4) (5) (6) (7) |
Note: Apply Blue Loctite on both sides of threaded rod (4) (Loctite 242) and hand tighten threaded rod (4) and position sensor (5).
Note: If completed 578-0957 Mounting Bracket Gp is not received, perform procedure to assemble 578-0957 Mounting Bracket Gp.
Note: The retaining ring should be towards the sheave shoulder.
Note: To press the bearing onto the sheave shaft only apply force to the internal ring of the bearing. Continue to press until the bearing contacts the sheave shoulder
Illustration 5 | g06422127 |
After rework |
Rework Instruction for
Location of Rework
Illustration 6 | g06420209 |
Required Parts
Required Parts | |||
Item | Qty | Part Number | Part Name |
1 | 1 | 578-1843 | Hose As |
2 | 1 | 004-6683 | Fitting |
3 | 1 | 468-3120 | Injector As |
4 | 1 | 3J-5390 | Plug |
5 | 3 | 148-8320 | Connector As |
6 | 1 | 148-8351 | Elbow As |
7 | 1 | 420-0939 | Spacer |
8 | 1 | 578-1841 | Hose As |
9 | 10 | 5P-9299 | Clip |
10 | 3 | 8T-4136 | Bolt |
11 | 12 | 8T-4121 | Hard Washer |
12 | 1 | 344-5675 | Nut |
13 | 2 | 144-8344 | Spacer |
14 | 2 | 8T-4182 | Bolt |
15 | 10 | 2R-1939 | Clip |
16 | 4 | 8Y-3795 | Boss |
17 | 4 | 205-7299 | Clip |
18 | 4 | 8T-4137 | Bolt |
19 | 1 | 204-2281 | Cable Strap |
Rework Procedure
- Remove and discard hose assembly (A) from the eighth injector of automatic lubrication lines group.
Show/hide table
Illustration 8 g06418642 View of 561-7999 Automatic Lubrication Lines Gp
(1)578-1843 Hose As - Install hose assembly (1) to eighth injector of automatic lubrication lines group.
Show/hide table
Illustration 9 g06419401 (2) 004-6683 Fitting
(3)468-3120 Injector As
(4)3J-5390 Plug
(5)148-8320 Connector As
(6)148-8351 Elbow As
(7)420-0939 Spacer - Install injector assembly (3) to 269-5352 Lubrication Distribution Valve Gp using fitting (2).
- Install plug (4), connector assembly (5), elbow adapter (6), and spacer (7) on injector assembly (3). Refer to Illustration 9.
Show/hide table
Illustration 10 g06419408 (3) 468-3120 Injector As
(8)578-1841 Hose As - Install one end of hose assembly (8) to injector (3).
Show/hide table
Illustration 11 g06419418 (B) 276-2970 Hose
(8)578-1841 Hose As
(9)5P-9299 Clip
(10)8T-4136 Bolt
(11)8T-4121 Hard Washer
(12)344-5675 Nut - Secure hose assembly (8) with hose assembly (B) using two clips (9), bolt (10), two washers (11), and nut (12).
Show/hide table
Illustration 12 g06419447 (9) 5P-9299 Clip
(11)8T-4121 Hard Washer
(13)144-8344 Spacer
(14)8T-4182 Bolt - Secure 578-1841 Hose As using clip (9), washer (11), spacer (13), and bolt (14) in two locations.
Show/hide table
Illustration 13 g06419495 (9) 5P-9299 Clip
(15)2R-1939 Clip - Secure 578-1841 Hose As using clip (9) and clip (15).
Show/hide table
Illustration 14 g06419531 (D1) 630 mm (24.8 inch)
(D2)481 mm (18.9 inch)
(W1) 2 x6 mm (0.2 inch) all-around fillet weld
(16)8Y-3795 Boss - Weld two bosses (16) on the 507-5688 Tube as per dimension shown in Illustration 14.
Show/hide table
Illustration 15 g06419580 (1) 578-1843 Hose As
(8)578-1841 Hose As
(9)5P-9299 Clip
(11)8T-4121 Hard Washer
(16)8Y-3795 Boss
(17)8t-4195 Bolt - Secure hose (8) using three clips (9), two washers (11), and two bolts (17) to boss (16).
- Route hose (1) to the top of machine as shown in Illustration 15.
Show/hide table
Illustration 16 g06419666 (8) 578-1841 Hose As
(11)8T-4121 Hard Washer
(17)205-7299 Clip
(18)8T-4137 Bolt - Secure hose (8) with two clips (17), two hard washers (18), and two bolts (18) in two locations.
Show/hide table
Illustration 17 g06419839 (1) 578-1843 Hose As
(8)578-1841 Hose As
(15)2R-1939 ClipShow/hide tableIllustration 18 g06419852 (1) 578-1843 Hose As
(8)578-1841 Hose As
(15)2R-1939 ClipShow/hide tableIllustration 19 g06427117 (1) 578-1843 Hose As
(8)578-1841 Hose As
(15)2R-1939 Clip - Remove the existing 9M-4995 Clip, and secure hose (1) with hose (8) using seven clips (15) in three locations as shown in Illustration 17.
Show/hide table
Illustration 20 g06419885 (1) 578-1843 Hose As
(8)578-1841 Hose As
(15)2R-1939 Clip
(19)204-2281 Cable Strap - Secure hose (1) with hose (8) using clip (15) and cable strap (19).
Show/hide table
Illustration 21 g06419903 Top of mast
(16)8Y-3795 Boss
(D3)463 mm (18.2 inch)
(D4)22.5 mm (0.88 inch)
(D5)395 mm (15.5 inch)
(D6)357 mm (14.1 inch)
(W2) 2 x6 mm (0.2 inch) all-around fillet weld - Weld two bosses (16) as per the dimensions on plate shown in Illustration 21.
Show/hide table
Illustration 22 g06419956 (1) 578-1843 Hose As
(5)148-8320 Connector As
(8)578-1841 Hose As
(9)5P-9299 Clip
(10)8T-4136 Bolt
(11)8T-4121 Hard Washer
(15)2R-1939 ClipNote: The bearing cavities must be manually filled with grease and the newly installed grease line must be purged prior to connecting to the sheave assembly. Use 6H-9049 Fitting to fill grease manually.
- Install hose assembly (1) and hose (8) to bracket assembly using two adapters (5).
- Secure hose assembly (1) with hose (8) using clip (15). Refer to Illustration 22.
- Secure hose assembly (1) to welded boss (16) using clip (9), bolt (10), and washer (11). Refer to Illustration 22.
Secure hose assembly (8) to welded boss (16) using clip (9), bolt (10), and washer (11). Refer to Illustration 22.
Illustration 7 | g06418605 |
View of (A) |
Rework Procedure for
Location of Rework
Illustration 23 | g06422343 |
Required Parts | |||
Item | Qty | Part Number | Part Name |
1 | 1 | 578-5211 | Box Harness As |
2 | 151 | 7K-1181 | Cable Strap |
3 | 1 | 578-5212 | Valve Harness As |
4 | 1 | 578-5213 | Wiring Harness |
5 | 1 | 578-5214 | Sensor Harness As |
6 | 3 | 578-5216 | Cable As |
7 | 6 | 9R-3761 | Boss |
8 | 2 | 578-4259 | Plate |
9 | 8 | 8T-4121 | Hard Washer |
10 | 8 | 8T-4136 | Bolt |
11 | 3 | 521-1761 | Position Sensor Gp |
12 | 12 | 242-7386 | Washer |
13 | 6 | 8T-0289 | Bolt |
14 | 6 | 3T-0851 | Locknut |
15 | 1 | 578-5215 | Sensor Harness As |
16 | 16 | 7T-1099 | Link |
17 | 8 | 9R-3761 | Boss |
18 | 3 | 578-4259 | Plate |
19 | 2 | 200-6345 | Mounting Saddle |
20 | 1 | 578-4292 | Plate |
- Install box harness (1) to 507-9074 Enclosure Ar.
- Secure harness (1) with 574-9663 Box Harness As using five cable straps (2). Refer to Illustration 24.
Show/hide table
Illustration 25 g06420279 (1) 578-5211 Box Harness As
(2)7K-1181 Cable StrapShow/hide tableIllustration 26 g06420300 Circuit Diagram - Connect the wires of harness (1) as:
- Connect the M906-ED9-BU(Blue)wire to PIN43 of EL-C175.
- Connect the M908-ED10-YL(Yellow)wire to PIN49 of EL-C175.
- Connect the M909-ED11-GN(Green)wire to PIN50 of EL-C175.
- Connect the N997-ED12-WH(White)wire to PIN41 of EL-C175.
- Connect the N998-ED13-OR(Orange)wire to PIN42 of EL-C175.
Show/hide tableIllustration 27 g06420475 (A) 155-2269 Connector Plug As
(B)3E-3364 Receptacle
(1)578-5211 Box Harness As
(2)7K-1181 Cable StrapShow/hide tableIllustration 28 g06420750 - Connect the wires of harness (1) as:
- Remove J844-GY(Grey)wire from EL-C172 PIN 69.
- Remove J843-BK(Black)wire EL-C172 PIN 56
- Connect the J844-ED2-GY(Grey)wire to PIN 69 of EL-C172.
- Connect the J843-ED5-BK(Black)wire to PIN56 of EL-C172.
- Connect the T997-ED7-OR(Orange)wire to PIN11 of EL-C172.
- Connect the T998-ED8-BR(Brown)wire to PIN21 of EL-C172.
Show/hide tableIllustration 29 g06420760 (1) 578-5211 Box Harness As
(2)7K-1181 Cable StrapShow/hide tableIllustration 30 g06420763 - Connect the wires of harness (1) as:
- Connect J844-ED3-GY(Grey)wire to EL-C2 PIN 100.
- Connect J843-ED6-BK(Black)wire to EL-C2 PIN 101
- Connect T997-ED7-OR(Orange)wire to EL-C2 PIN 110
- Connect T998-ED8-BR(Brown)wire to EL-C2 PIN 111
- Connect M906-ED9-BU(Blue)wire to EL-C2 PIN 104
- Connect M908-ED10-YL(Yellow)wire to EL-C2 PIN 105
- Connect M909-ED11-GN(Green)wire to EL-C2 PIN 106
- Connect N997-ED12-WH(White)wire to EL-C2 PIN 112
- Connect N998-ED13-OR(Orange)wire to EL-C2 PIN 113
Show/hide tableIllustration 31 g06420847 (3) 578-5212 Valve Harness As
(4)7K-1181 Cable StrapShow/hide tableIllustration 32 g06420860 - Install one end of harness (3) to 264-5732 Connector Plug As of 507-9074 Enclosure Ar.
Connect the wires of harness (3) as:
- Connect J884-VD1-GY(Grey)wire to V-C520 PIN100
- Connect J843-VD2-BK(Black)wire to V-C520 PIN101
- Connect T997-VD3-OR(Orange)wire to V-C520 PIN110
- Connect T998-VD4-BR(Brown)wire to V-C520 PIN111
- Connect M906-VD5-BU(Blue)wire to V-C520 PIN104
- Connect MD908-VD6-YL(Yellow)wire to V-C520 PIN105
- Connect M909-VD7-GN(Green)wire to V-C520 PIN106
- Connect N997-VD8-WH(White)wire to V-C520 PIN112
- Connect N998-VD9-OR(Orange)wire to V-C520 PIN113
Show/hide tableIllustration 33 g06420887 (3) 578-5212 Valve Harness As
(2)7K-1181 Cable Strap
(C)549-7674 Valve Harness As - Secure harness (3) with valve harness (C) using 17 cable straps (4).
Show/hide table
Illustration 34 g06420902 (3) 578-5212 Valve Harness As
(2)7K-1181 Cable StrapShow/hide tableIllustration 35 g06420910 - Connect another end of harness (3) to 224-2734 Connector Receptacle As.
Connect the wires of harness (3) as:
- Connect J884-VD1-GY(Grey)wire to V-C16 PIN 48
- Connect J843-VD2-BK(Black)wire to V-C16 PIN 49
- Connect T997-VD3-OR(Orange)wire to V-C16 PIN 50
- Connect T998-VD4-BR(Brown)wire to V-C16 PIN 51
- Connect M906-VD5-BU(Blue)wire to V-C16 PIN 58
- Connect M908-VD6-YL(Yellow)wire to V-C16 PIN 59
- Connect M909-VD7-GN(Green)wire to V-C16 PIN 60
- Connect M906-VD5-BU(Blue)wire to V-C16 PIN 61
- Connect N998-VD9-OR(Orange)wire to V-C16 PIN 62
Show/hide tableIllustration 36 g06421382 (2) 7K-1181 Cable Strap
(4)578-5213 Wiring Harness
(E)574-9669 Wiring HarnessShow/hide tableIllustration 37 g06421385 - Install one end of harness (4) to 160-7689 Connector Plug As.
Connect the wires of harness (4) as:
- Connect J844-JD1-GY(Grey)wire to MJ-C6 PIN48
- Connect J843-JD2-BK(Black)wire to MJ-C6 PIN49
- Connect T997-JD3-OR(Orange)wire to MJ-C6 PIN50
- Connect T998-JD4-BR(Brown)wire to MJ-C6 PIN51
- Connect M906-JD5-BU(Blue)wire to MJ-C6 PIN58
- Connect M908-JD6-YL(Yellow)wire to MJ-C6 PIN59
- Connect M909-JD7-GN(Green)wire to MJ-C6 PIN60
- Connect N997-JD8-WH(White)wire to MJ-C6 PIN61
- Connect N998-JD9-OR(Orange)wire to MJ-C6 PIN62
Show/hide tableIllustration 38 g06421389 (2) 7K-1181 Cable Strap
(4)578-5213 Wiring Harness
(E)574-9669 Wiring Harness - Secure harness (4) with mast flex harness (E) using six clips (2).
Show/hide table
Illustration 39 g06421394 (2) 7K-1181 Cable Strap
(4)578-5213 Wiring Harness
(E)574-9669 Wiring Harness - Connect another end of harness (4) to 160-7689 Connector Plug As.
Connect the wires of harness (4) as:
- Connect J844-JD1-GY(Grey)wire to MJ-C2 PIN48
- Connect J843-JD2-BK(Black)wire to MJ-C2 PIN49
- Connect T997-JD3-OR(Orange)wire to MJ-C2 PIN50
- Connect T998-JD4-BR(Brown)wire to MJ-C2 PIN51
- Connect M906-JD5-BU(Blue)wire to MJ-C2 PIN58
- Connect M908-JD6-YL(Yellow)wire to MJ-C2 PIN59
- Connect M909-JD7-GN(Green)wire to MJ-C2 PIN60
- Connect N997-JD8-WH(White)wire to MJ-C2 PIN61
- Connect N998-JD9-OR(Orange)wire to MJ-C2 PIN62
Show/hide tableIllustration 40 g06421414 (F) 574-9667 Wiring Harness
(2)7K-1181 Cable Strap
(5)578-5214 Sensor Harness AsShow/hide tableIllustration 41 g06421425 - Install one end of harness (5) to 224-2734 Connector Receptacle As.
Connect the wires of harness (5) as:
- Connect J844-MD1-GY(Grey)wire to M-C413 PIN48
- Connect J843-MD5-BK(Black)wire to M-C413 PIN49
- Connect T997-MD9-OR(Orange)wire to M-C413 PIN50
- Connect T998-MD10-BR(Brown)wire to M-C413 PIN51
- Connect M906-MD11-BU(Blue)wire to M-C413 PIN58
- Connect M908-MD12-YL(Yellow)wire to M-C413 PIN59
- Connect M909-MD13-GN(Green)wire to M-C413 PIN60
- Connect N997-MD14-WH(White)wire to M-C413 PIN61
- Connect N998-MD15-OR(Orange)wire to M-C413 PIN62
Show/hide tableIllustration 42 g06421460 (F) 574-9667 Wiring Harness
(2)7K-1181 Cable Strap
(5)578-5214 Sensor Harness As - Secure harness (5) with wiring harness (F) using 25 clips, as shown in Illustration 42.
Show/hide table
Illustration 43 g06421483 (D1) 40 mm (1.5 inch)
(D2)1760 mm (69.3 inch)
(H) MB-C2 connector
(2)7K-1181 Cable Strap
(5)578-5214 Sensor Harness As
(6)578-5216 Cable AsNote: Dimension (D2) should be measured from mast base plate to bottom proxy switch mounting boss.
Show/hide tableIllustration 44 g06421512 Detail view of G
(W1) 2 x6 mm (0.2 inch) all-around fillet weld
(7)9R-3761 Boss
(8)578-4259 Plate
(9)8T-4121 Hard Washer
(10)8T-4136 Bolt
(11)521-1761 Position Sensor Gp
(12)242-7386 Washer
(13)8T-0289 Bolt
(14)3T-0851 LocknutShow/hide tableIllustration 45 g06427631 Section J-J
(D3)378.7 mm (14.91 inch)
(D4)453.7 mm (17.86 inch)
(D5) 2 x65.9 mm (2.6 inch) - Connect harness (5) to MB-C2 connector.
Secure MB-C2 harness connector (H) with harness (5) using clip as shown in Illustration 43.
- Connect one end of cable assembly (6) to MB-C2 connector (H). Refer to Illustration 43.
- Weld two bosses (7) to 526-2215 Tube as per the dimensions shown in Illustration 43, Illustration 45, and Illustration 44.
Install plate (8) to boss (7) with four washers (12), two bolts (13), and two nuts (14), as shown in Illustration 44.
- Install position sensor (11) to plate (8) using two washers (9) and two bolts (10) as shown in Illustration 44.
- Connect another end of cable assembly (6) to position sensor (11). Refer to Illustration 44.
Show/hide table
Illustration 46 g06421532 (F) 574-9667 Wiring Harness
(2)7K-1181 Cable Strap
(5)578-5214 Sensor Harness AsShow/hide tableIllustration 47 g06421553 (F) 574-9667 Wiring Harness
(2)7K-1181 Cable Strap
(5)578-5214 Sensor Harness As - Secure and route harness (5) with harness (5) using 44 clips towards the crown.
Show/hide table
Illustration 48 g06427647 (K) connector (MB-C1 mate with MT-C1)
(2)7K-1181 Cable Strap
(5)578-5214 Sensor Harness As
(15)578-5215 Sensor Harness As - Connect harness (5) to MB-C1 and mate with MT-C1.
Secure connector (K) (MB-C1 mate with MT-C1) with 574-9667 Wiring Harness using clip (2).
Show/hide tableIllustration 49 g06427654 (2) 7K-1181 Cable Strap
(5)578-5214 Sensor Harness As - Secure harness (5) with 574-9667 Wiring Harness using 15 clips and route hose assembly as shown in Illustration 49.
Show/hide table
Illustration 50 g06427667 (W2) 2 x 6 mm (0.2 inch) all-around fillet weld
(D6)175 mm (6.9 inch)
(D7)285 mm (11.2 inch)
(D8)7153 mm (281.6 inch)
(D9)120 mm (4.7 inch)
(D10)40 mm (1.6 inch)
(5)578-5214 Sensor Harness As
(6)578-5216 Cable As
(9)8T-4121 Hard Washer
(10)8T-4136 Bolt
(11)521-1761 Position Sensor Gp
(12)242-7386 Washer
(13)8T-0289 Bolt
(14)3T-0851 Locknut
(16)7T-1099 Link
(17)9R-3761 Boss
(18)578-4259 PlateNote: Dimension (D8) should be measured from mast base plate to bottom proxy switch mounting boss.
Show/hide tableIllustration 51 g06427683 Section L-L
(D11)493.5 mm (19.43 inch)
(D12)568.5 mm (22.38 inch)
(D13) 2 x65.9 mm (2.6 inch) - Secure harness (5) with 574-9667 Wiring Harness using weld link (16).
Connect harness (5) to MB-C3 connector.
Connect one end of cable assembly (6) to MB-C3 connector.
- Secure cable (6) with MB-C3 connector using weld link (16) as shown in Illustration 50.
- Weld two bosses (17) as per the dimensions shown in Illustration 50 and Illustration 51.
Install plate (18) to boss (17) using four washers (12), two bolts (13), and two nuts (14). Refer to Illustration 50.
- Install position sensor (11) to plate (18) using two washers (9) and two bolts (10). Refer to Illustration 50.
Connect another end of cable assembly (6) to position sensor (11). Refer to Illustration 50.
Show/hide tableIllustration 52 g06427692 (M) 580-1188 Wiring Harness
(2)7K-1181 Cable Strap
(15)578-5215 Sensor Harness As - Secure and route harness (15) with mast harness (M) with 16 clips (2).
Show/hide table
Illustration 53 g06427697 (D14) 65 mm (2.6 inch)
(D15)240 mm (9.5 inch)
(D16)230 mm (9.1 inch)
(D17)230 mm (9.1 inch)
(M)580-1188 Wiring Harness
(2)7K-1181 Cable Strap
(15)578-5215 Sensor Harness As
(16)7T-1099 Link - Secure harness (15) with harness (M) using six cable straps (2) and six links (16).
Show/hide table
Illustration 54 g06427753 (W3) 2 x 6 mm (0.2 inch) all - around fillet weld
(D18)80 mm (3.2 inch)
(D19)180 mm (7.1 inch)
(D20)180 mm (7.1 inch)
(D21)238 mm (9.4 inch)
(D22)13441 mm (529.2 inch)
(D23)115 mm (4.5 inch)
(D24)40 mm (1.6 inch)
(M)580-1188 Wiring Harness
(2)7K-1181 Cable Strap
(6)578-5216 Cable As
(9)8T-4121 Hard Washer
(10)8T-4136 Bolt
(11)521-1761 Position Sensor Gp
(15)578-5215 Sensor Harness As
(16)7T-1099 Link
(17)9R-3761 Boss
(18)578-4259 PlateNote: Dimension (D22) should be measured from mast base plate to bottom proxy switch mounting boss.
Show/hide tableIllustration 55 g06427864 Section of N-N
(D25)730.6 mm (28.76 inch)
(D26)805.6 mm (31.72 inch)
(D27) 2 x65.9 mm (2.60 inch) - Secure harness (15) with 580-1188 Wiring Harness using seven cable straps (2) and seven welded links (16) as shown in Illustration 54.
- Connect harness (15) to MB-C3 connector.
Connect one end of the cable assembly (6) to MB-C3 connector as shown in Illustration 54.
- Weld two bosses (17) as per the dimension shown in Illustration 54 and Illustration 55.
Install plate (18) to boss (17) using four washers (12), two bolts (13), and two nuts (14). Refer to Illustration 54.
- Install position sensor (11) to plate (18) using two washers (9) and two bolts (10). Refer to Illustration 54.
Connect another end of cable assembly (6) to position sensor (11). Refer to Illustration 54.
Show/hide tableIllustration 56 g06427911 (M) 580-1188 Wiring Harness
(2)7K-1181 Cable Strap
(15)578-5215 Sensor Harness As - Secure and route harness (15) with harness (M) using 12 cable straps (2).
Show/hide table
Illustration 57 g06427936 (M) 580-1188 Wiring Harness
(2)7K-1181 Cable Strap
(15)578-5215 Sensor Harness As
(19)200-6345 Mounting Saddle - Secure and route harness (15) with harness (M) using eight clips (2) and two mounting swivels (19) towards the crown. Refer to Illustration 57.
- Connect harness (15) to 578-0957 Mounting Bracket Gp. Refer to Illustration 57.
Show/hide table
Illustration 58 g06427947 Installation of target plate
(W4) 2 x6 mm (0.2 inch) all-around fillet weld
(D28)141 mm (5.5 inch)
(D29)100 mm (3.9 inch)
(D30)25 mm (1.0 inch)
(17)9R-3761 Boss - Weld two bosses (17) as per the dimensions shown in Illustration 58.
Show/hide table
Illustration 59 g06427959 (9) 8T-4121 Hard Washer
(10)8T-4136 Bolt
(20)578-4292 Plate - Install plate (20) to welded boss with two washers (9) and two bolts (10).
Show/hide table
Illustration 60 g06422071 (P) 566-5662 Position Sensor Gp
(R)524-5322 Cable As - Remove and discard position sensor (P) and cable assembly (R).
Illustration 24 | g06420250 |
(1) (2) |
New Encoder Calibration and Troubleshooting
Depth Measurement
The normal process for depth processing is as follows:
- At key-ON we read from memory the last known head position to use as the start point.
- The rotary encoder reads the position of one top cable sheave and calculates the motion of the rotary head.
- After the rotary head passes each proximity switch the position is adjusted to be more accurate.
- At key-OFF the position will be saved into memory.
The proximity switches are placed before the head reaches important locations:
- Pipe in the hole for two pipe masts (optional switch).
- Head clear of carousel and pipe in the hole for one pipe masts.
- Head near deck wrench.
Diagnostics
The sheave encoder has diagnostics for open and short to ground diagnostics. If there is a failure, all interlocks that use head position are activated and they will need to be manually overridden.
- If a failure is detected with duty cycle (raw input from sensor), head above carousel, head cleared to positioner and pipe not in hole interlocks will be activated. The operator will need to override these to perform related operations.
- If a failure is detected with all the proximity switches (that are part of the depth system based on machine configuration), head above carousel, head cleared to positioner and pipe not in hole interlocks will be activated. The operator will need to override these to perform related operations.
- If a failure is detected with one (any) proximity switch (that is part of the depth system based on machine configuration), automatic pipe handling will not work.
The proximity switches have short to ground diagnostics to avoid improper position corrections.
Component Detail
The sheave sensor uses hall effect technology that senses a magnet that is attached to the sheave.
The proximity switches are typical proximity switches that are mounted on the mast and will read the target mounted on the rotary head guides.
1st Time Calibration
To calibrate the head position the rotary head needs to be moved up or down past one of the proximity switches. Once the proximity switch is flagged the calibration is complete. There is no longer a need to calibrate through the operator display. Those buttons may be present in current software but will be removed shortly. You may have an event stating that top of mast calibration is required, this will be removed from software as well in a future release.
Verify ET settings
- It is important to verify mast length and pipe length settings in ET are correct for the machine’s configuration. These are critical for the new software.
Depth System Configuration MD6250
-
13.6 m (44.62 ft) mast and6096 mm (240.0 inch) pipe.
New Encoder Calibration
- Install CAT Electronic Technitian 2019A provided directly from the Drill product group.
Show/hide table
Illustration 61 g06425807 Show/hide tableIllustration 62 g06425822 - Connect to ET and go to configuration page.
- Connect via common adapter.
- Go to configuration page in ET.
Show/hide tableIllustration 63 g06425859 - Mast Configuration
- Set mast length to
13.6 m (44.6 ft) .
- Set mast length to
Electrical Troubleshooting
Required Tool List | |
Qty | Part Name |
1 | Multimeter (1) |
(1) | ability to read duty cycle. |
Illustration 64 | g06420279 |
- Connect the M906-ED9-BU(Blue)wire to PIN43 of EL-C175 - signal from proximity switch, should read 5V when target not detected and 1.3V when target is detected.
- Connect the M908-ED10-YL(Yellow)wire to PIN49 of EL-C175 - signal from proximity switch, should read 5V when target not detected and 1.3V when target is detected.
- Connect the M909-ED11-GN(Green)wire to PIN50 of EL-C175 - signal from proximity switch, should read 5V when target not detected and 1.3V when target is detected.
- Connect the N997-ED12-WH(White)wire to PIN41 of EL-C175 Pin 3 on Encoder Sig 1 (This should see 5 to 95% duty Cycle when head is moving) against the ground).
- Connect the N998-ED13-OR(Orange)wire to PIN42 of EL-C175 Pin 4 on Encoder Sig 2(This should see 5 to 95% duty Cycle when head is moving) against the ground).
Note: Mast that are 11.2m with 35ft carousel should use only M906 and M908.
Illustration 65 | g06420475 |
- Remove J844-GY(Grey)wire from EL-C172 PIN 69.
- Remove J843-BK(Black)wire EL-C172 PIN 56
- Connect the J844-ED2-GY(Grey)wire to PIN 69 of EL-C172.
- Connect the J843-ED5-BK(Black)wire to PIN56 of EL-C172.
- Connect the T997-ED7-OR(Orange)wire to PIN11 of EL-C172 - Pin 1 on Encoder vs (needs to read 5V).
- Connect the T998-ED8-BR(Brown)wire to PIN21 of EL-C172 - Pin 2 on Encoder ground.