C-10 Petroleum Engine Caterpillar


Cylinder Head - Install

Usage:

C-10 Z2B

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
B     1U-5686 (1)     21/32 inch Drill Bit     1    
C     4C-9732 (1)     M16x2.0-D7 Plug Tap     1    
D     9U-5604     M16x2.0 32mm Heli-Coil Insert (2)     1    
E     8T-2799 (1)     Heli-Coil Installation Tool     1    
F     8T-3096     Plug Tap     1    
G     6V-4876     Lubricant     1    
( 1 ) Part of 4C-8367 Thread Repair Kit
( 2 ) This is a special length.


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


Reference: Refer to Video Tape, LEVN5101, "C-10 and C-12 Head Gasket Repair Procedure".

  1. Thoroughly clean the mating surfaces of the cylinder head and the cylinder block.

  1. Clean all 26 head bolt holes on the cylinder block with Tooling (F) .

  1. After cleaning the threads, remove any debris from the head bolt holes on the cylinder block with a vacuum hose.

  1. Visually inspect the head bolt holes on the cylinder block for thread damage.

  1. If a damaged head bolt thread is observed, repair the damaged head bolt thread with a Heli-Coil thread repair kit.

  1. Inspect the cylinder head and the cylinder block for flatness. Refer to Guideline for Reusable Parts and Salvage Operations, SEBF8162, "Procedure to Measure and Salvage Cylinder Head Assemblies and Related Components".



    Illustration 1g01062281

  1. Install the correct cylinder head gasket (19) and the new O-ring seals on the cylinder block. Inspect the condition of the remaining gaskets. Replace the gaskets, if necessary.

    Note: To avoid damage to the cylinder head gasket, use guide bolts of an appropriate size to install the cylinder head.

  1. Attach a suitable lifting device to cylinder head (18). The weight of cylinder head (18) is approximately 135 kg (300 lb). Install cylinder head (18) on the cylinder block. Ensure that all wires, lines, and hoses are free from the cylinder head.



    Illustration 2g01062278

  1. Install the gasket on cylinder head (18) .

  1. Install new cylinder head bolts (17). If the engine is equipped with a compression brake, then also install new head bolt studs.

  1. Lubricate the following components with Tooling (G) : the bolt threads, the underside of the bolt heads and the washers. Follow Step 12 for the correct tightening procedure.



    Illustration 3g00517501

    Tightening Sequence

    Note: Engines that are equipped with a compression brake will have three head bolt studs. Install the head bolt studs in positions (2), (8), and (10). Tighten the head bolt studs in sequence with the cylinder head bolts.

  1. Tighten the cylinder head bolts according to the following procedure:

    1. Tighten Bolt (1) through Bolt (26) in a numerical sequence to a torque of 160 ± 15 N·m (120 ± 11 lb ft).

    1. Tighten Bolt (1) through Bolt (26) again in a numerical sequence to a torque of 160 ± 15 N·m (120 ± 11 lb ft).

    1. Place an index mark on each bolt head. Turn Bolt (1) through Bolt (26) in a numerical sequence for an additional 90 degrees (1/4 turn).

    1. Loosen Bolt (1) through Bolt (26) until the washers are loose under the bolt heads.

    1. Tighten Bolt (1) through Bolt (26) in a numerical sequence to a torque of 160 ± 15 N·m (120 ± 11 lb ft).

    1. Tighten Bolt (1) through Bolt (26) again in a numerical sequence to a torque of 160 ± 15 N·m (120 ± 11 lb ft).

    1. Place an index mark on each bolt head. Turn Bolt (1) through Bolt (26) in a numerical sequence for an additional 90 degrees (1/4 turn).

    1. Tighten Bolt (27) through Bolt (33) in a numerical sequence to a torque of 28 ± 7 N·m (20 ± 5 lb ft).

  1. Install the head bolt spacers on the three head bolt studs. Tighten the head bolt spacers to a torque of 100 ± 20 N·m (75 ± 15 lb ft).



    Illustration 4g01062276

  1. Install water outlet manifold (16) and bolts (15) .



    Illustration 5g01062275

  1. Hold tube assembly (14) in position and connect fittings (12). Install bolts (13) .



    Illustration 6g01062274

  1. Connect harness assembly (11). Tighten bolt (10) to a torque of 6 ± 1 N·m (53 ± 9 lb in).

  1. Install the clip, the washer, and nut (9) .



    Illustration 7g01062271

  1. Connect harness assembly (7). Install the clip, the washer, and bolt (6). Secure the harness assembly with cable straps (8) .

  1. Install fuel filter (5) by following the instructions on the fuel filter.

  1. Connect hose assembly (4) .

  1. Install hose (3) .

  1. Install the bolts, the washers, and nuts (2) .



    Illustration 8g01062266

  1. Route harness assembly (1) accordingly and connect harness assembly (1) .

  1. Refill the cooling system with coolant. Refer to Operation and Maintenance Manual, "Cooling System Coolant (ELC) - Change".

End By:

  1. Install the electronic unit injectors. Refer to Disassembly and Assembly, "Electronic Unit Injector - Install".
  2. Install the valve mechanism cover base. Refer to Disassembly and Assembly, "Valve Mechanism Cover Base - Remove and Install".
  3. Install the exhaust manifold. Refer to Disassembly and Assembly, "Exhaust Manifold - Remove and Install".

Caterpillar Information System:

Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.