Illustration 1 | g00445959 |
(1) Length of dowel after assembly ... 22 ± 1 mm (0.87 ± 0.04 inch)
(2) Apply 6V-6640 Sealant to these surfaces before the seals are installed. Apply a light coating of SAE 30W oil to the seal surfaces before installation.
(3) Torque for four bolts that attach each idler to the roller frame ... 750 ± 90 N·m (550 ± 60 lb ft)
(4) Torque for four bolts that attach each track roller to the roller frame ... 750 ± 90 N·m (550 ± 60 lb ft)
Front Frame
Illustration 2 | g00445624 |
(5) Maximum temperature of bearing during installation ... 175°C (347°F)
(5) Diameter of bearing after assembly ... 304.65 ± 0.18 mm (11.99 ± 0.007 inch)
(6) Length of dowel after assembly ... 22 ± 1 mm (0.87 ± 0.040 inch)
Track Roller Guard
Illustration 3 | g00456560 |
(7) Torque for 24 bolts on standard undercarriage or for 28 bolts ... 750 ± 80 N·m (550 ± 60 lb ft)
(8) Torque for 24 locknuts ... 300 ± 50 N·m (220 ± 40 lb ft)
(9) Torque for eight bolts ... 135 ± 20 N·m (100 ± 15 lb ft)