C-15 Petroleum Engine Caterpillar


Auxiliary Water Pump - Assemble

Usage:

C-15 Z2C

Assembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     132-5451     Holding Fixture     1    
C     1P-0510     Driver Gp     1    
E     1U-7608     Chain Wrench     1    
F     1P-1859     Retaining Ring Pliers     1    
G     1P-1857     Retaining Ring Pliers     1    
H     9S-3263     Thread Lock Compound     -    
J     8T-5096     Dial Indicator Gp     1    
K     1U-6396     O-Ring Assembly Compound     -    


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.





    Illustration 1g01060988

    Note: Ensure that the shoulder of the impeller is against the step in the shaft. Impeller (30) is left hand threads.

  1. Place shaft (28) into a soft jawed vise. Apply Tooling (H) to the threads that are on shaft (28). Install impeller (30). Use Tooling (E) in order to tighten impeller (30) to a torque of 103 ± 13 N·m (76 ± 10 lb ft).

    Note: Impeller (30) has left hand threads.

  1. Install port plate (32) onto shaft (28) .

    Note: The hole in port plate (32) for shaft (28) is smaller than the hole in plate (29) .

  1. Install spacer (33) onto shaft (28) .

    Note: The length of spacer (33) is 18.0 mm (0.71 inch).




    Illustration 2g01060987

  1. Install one half of seal assembly (34) into body (21) .

  1. Install one half of seal assembly (34) onto shaft (28) .

  1. Install sleeve (35) onto shaft (28) .

    Note: The length of sleeve (35) is 22.8 mm (0.89 inch).

  1. Position shaft assembly (28) into body (21).

    Note: Ensure that the locating pin on plate (32) is engaged into body (21) .




    Illustration 3g01060990

  1. Use Tooling (C) to install bearing (20) into bearing housing (13) .

  1. Use Tooling (G) to install retaining ring (19) into bearing housing (13) .

  1. Install bearing housing (13) and shims (15) onto body (21). Tighten bolts (14) to a torque of 6 ± 1 N·m (53 ± 9 lb in).

  1. Use Tooling (G) to install retaining ring (18) on shaft (28) .



    Illustration 4g01060992

  1. Install ring (31) into body (21) .

  1. Use Tooling (J) to check the height of impeller (30). The height of the impeller should be 0.11 mm to 0.16 mm (0.004 inch to 0.006 inch) below the edge of ring (31) .

    Note: To adjust the height of the impeller, remove bearing housing (13) and add shims. To adjust the height of the impeller, remove bearing housing (13) and remove shims (15) .




    Illustration 5g01060991

  1. Install plate (29) on shaft (28) .

  1. Install O-ring seal (27) on body (21). Apply Tooling (K) to the O-ring seal.

  1. Install body (21) onto ring (31). Install bolts (22) and tighten to a torque of 6 ± 1 N·m (53 ± 9 lb in).

  1. Install cover (16) on the bearing housing. Install bolts (17) and tighten to a torque of 1.9 ± 0.2 N·m (17 ± 2 lb in).



    Illustration 6g01060994

  1. Use Tooling (C) to install bearing (12) into body (7) .

  1. Use Tooling (G) to install retaining ring (11) into body (7) .

  1. Install oil seal (10) in body (7) .



    Illustration 7g01060986

  1. Apply Tooling (H) to the threads that are on shaft (28). Install impeller (25) onto the shaft. Tighten the impeller to a torque of 103 ± 13 N·m (76 ± 10 lb ft).

    Note: Impeller (25) has right hand threads.

  1. Install one half of seal assembly (24) onto shaft (28) .

  1. Install one half of seal assembly (24) in body (7) .

  1. Install sleeve (23) onto shaft (28) .

    Note: The length of sleeve (23) is 33.4 mm (1.32 inch).

  1. Install O-ring seal (26) on body (9). Apply Tooling (K) to the O-ring seal.

  1. Install body (7) onto body (9). Install bolts (8) and tighten to a torque of 6 ± 1 N·m (53 ± 9 lb in).

  1. Rotate shaft (28) by hand.



    Illustration 8g01060993

  1. Install the gaskets, the plate and manifold (6) onto the auxiliary water pump. Tighten bolts (5) to a torque of 22 ± 3 N·m (16 ± 2 lb ft).

  1. Install the O-ring seal on guide pin (4). Apply Tooling (K) to the O-ring seal. Install the guide pin and tighten to a torque of 22 ± 3 N·m (16 ± 2 lb ft).

  1. Install key (3) on the shaft.

  1. Use Tooling (A) in order to install drive gear (2). Install the washer and nut (1) .

End By: Install the auxiliary water pump. Refer to Disassembly and Assembly, "Auxiliary Water Pump - Install".